119th CONGRESS 1st Session
To establish a more uniform, transparent, and modern process to authorize the construction, connection, operation, and maintenance of international border-crossing facilities for the import and export of oil and natural gas and the transmission of electricity.
IN THE SENATE OF THE UNITED STATES · September 19 (legislative day, September 16), 2025 · Committee: Committee on Energy and Natural Resources
In the case of an application for the importation of natural gas from, or the exportation of natural gas to, Canada or Mexico, the Commission shall grant the application not later than 30 days after the date on which the Commission receives the complete application. 15 U.S.C. 717b(c)the Commission has conducted hearings and made the findings required under section 202(e) of the Federal Power Actand all that follows through the period at the end and inserting the Secretary has conducted hearings and finds that the proposed transmission facilities would not impair the sufficiency of electric supply within the United States or would not impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Secretary.. 16 U.S.C. 824a–4(b)border-crossing facility means the portion of an oil or natural gas pipeline or electric transmission facility that is located within 1,000 feet of the international boundary of the United States, measured from the point at which the facility crosses such boundary into the United States.modificationnatural gas has the meaning given that term in section 2 of the Natural Gas Act (). 15 U.S.C. 717aoil means petroleum or a petroleum product.Electric Reliability Organization,regional entity 16 U.S.C. 824oIndependent System Operator,Regional Transmission Organization 16 U.S.C. 796