SA 6901. Ms. DUCKWORTH submitted an amendment intended to be proposed
to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 118, strike line 21 and all that follows
through page 123, line 21, and insert the following:
“(iv) Acknowledgment of receipt.—Not later than 10 days
after the date on which an applicant submits to a certifying
authority a certification application for an individual
Federal license or permit, the certifying authority shall
acknowledge receipt of the certification application in
writing.
“(v) Notification of complete application or
identification of missing materials.—Not later than 90 days
after the date on which a certifying authority acknowledges
receipt of a certification application under clause (iv), the
certifying authority shall—
“(I) provide the applicant a written notification that the
certification application is complete; or
“(II) identify to the applicant in writing all specific
additional materials or information described in clauses (ii)
and, if applicable, (iii) necessary for the certification
application to be considered complete, including, for each
such additional piece of material or information, a
description of the water quality requirement for which the
additional material or information is needed in order to
evaluate compliance with that water quality requirement.
“(vi) Petition to court.—
“(I) Right to petition.—An applicant may petition for
judicial review of an alleged failure by a certifying
authority to act in accordance with clauses (ii) through (v)
by filing a written petition in a court of competent
jurisdiction.
“(II) Considerations.—In reviewing a petition under this
subclause, a reviewing court shall consider—
“(aa) the administrative record, which shall consist of
the materials required to be submitted under clause (ii);
“(bb) any materials or information identified by
certifying authority as missing pursuant to a notification
under clause (v)(II);
“(cc) the information submitted by the applicant to the
certifying authority; and
“(dd) any evidence presented to the court by the applicant
that suggests that the defense of the certifying authority to
the petition is pretextual.
“(III) Court order.—If a court, in reviewing a petition
under this clause, finds that a certifying authority has
failed to act in accordance with any of clauses (ii), (iv),
and (v), the court shall provide injunctive relief, as
appropriate, to give effect to this section.
“(D) Denials of certification for individual license or
permit.—If a certifying authority denies a certification
application for an individual license or permit, the
certifying authority shall provide to the applicant and the
applicable Federal licensing or permitting agency—
“(i) the specific water quality requirements that the
certifying authority determined will be violated if
certification were granted;
“(ii) a statement explaining why the certifying authority
determined the identified water quality requirements will be
violated; and
“(iii) if the denial is due to insufficient information, a
description of the specific water quality data or
information, if any, that would be needed to evaluate whether
granting certification will comply with water quality
requirements.
“(4) Review period.—
“(A) In general.—Subject to subparagraph (C) and in
consultation with each certifying authority, a licensing or
permitting agency shall, categorically or on a case-by-case
basis for each certification application, establish a
reasonable period of time (not to exceed 1 year from the date
of receipt of the certification application) within which a
certifying authority shall issue a final action on the
certification application, which shall account for time
required under applicable State or Tribal law for public
notice and comment periods, if any.
“(B) Failure to act.—If a certifying authority fails or
refuses to issue a final action as described in paragraph (6)
on a certification application by the end of the reasonable
period of time established under subparagraph (A) and the
reasonable period of time has not been extended in accordance
with subparagraph (C), the requirement for a certification
under subsection (a) shall be waived, except that the
reasonable period of time shall restart in the event that the
certification application is voluntarily withdrawn by the
applicant and the applicant submits a new certification
application.
“(C) Requirement for extension.—With respect to a
certification application, the reasonable period of time
established under subparagraph (A) may only be extended if—
“(i) the extension is requested, in writing, by the
applicant; or
“(ii) the extension is required by the certifying
authority to ensure compliance with water quality standards
and the certifying authority provides to the applicant a
notice of the extension that includes—
“(I) an explanation for why the extension is necessary;
“(II) a binding timeline, not to exceed 180 days, for when
the certifying authority will issue a final action on the
certification application; and
“(III) a commitment to provide, not less frequently than
monthly, an update on the status of the review of the
certification application.
SA 6902. Mr. BUDD (for himself, Mr. Rounds, Mr. Cramer, and Ms. Graham) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
In section 216(b) of the Federal Power Act (as amended by
section 2101(b)(3) of the amendment), strike paragraph (5)
and insert the following:
“(5) the electric transmission facilities are capable of
transmitting electric energy at a voltage of not less than
345 kilovolts; and
SA 6903. Mr. SCHMITT submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 237 of the amendment, strike line 14 and
all that follows through page 241, line 13, and insert the
following:
“(4) Impact on productive agricultural operations.—
“(A) In general.—The term `impact on productive
agricultural operations' means any substantial and direct
adverse effect on the ability to carry out agricultural crop
or livestock production on land described in subparagraph
(B), including any such effect on the physical conduct of
such production.
“(B) Land described.—The land referred to in subparagraph
(A) is land used for agricultural crop or livestock
production, including land temporarily idled as part of such
production, but excluding land that has not been used for
such production during the 2-year period ending on the date
on which the relevant application for a permit is filed with
the Commission under subsection (c).
“(5) Improved reliability.—The term `improved
reliability' has the meaning given the term in section
225(a).
“(6) Landowner input.—The term `landowner input' means
input received—
“(A) by the Commission;
“(B) from affected landowners, such as farmers and
ranchers, in the path of the proposed construction or
modification of an electric transmission facility; and
“(C) pursuant to notification provided to, and
consultation with, those affected landowners, farmers, and
ranchers by the Commission.
“(7) Secretary.—The term `Secretary' means the Secretary
of Energy.”.
(b) Construction Permit.—Section 216(b) of the Federal
Power Act (16 U.S.C. 824p(b)) is amended—
(1) in the matter preceding paragraph (1), by striking
“Except” and all that follows through “finds that” and
inserting “Except as provided in subsections (d)(1) and (i),
the Commission shall, after notice and an opportunity for
hearing, including a public comment period of at least 45
days, issue one or more permits to individual or joint
applicants for the construction or modification of electric
transmission facilities necessary in the national interest if
the Commission finds that”;
(2) in paragraph (1)—
(A) in subparagraph (A)(i), by inserting “or
modification” after “siting”; and
(B) in subparagraph (C)—
(i) in the matter preceding clause (i), by inserting “or
modification” after “siting”; and
(ii) in clause (i), by striking “the later of” in the
matter preceding subclause (I) and all that follows through
the semicolon at the end of subclause (II) and inserting
“the date on which the application was filed with the State
commission or other entity;”; and
(3) by striking paragraphs (2) through (6) and inserting
the following:
“(2) the proposed facilities will be used for the
transmission of electric energy in interstate or foreign
commerce;
“(3) the proposed construction or modification is
consistent with the public interest;
“(4) the proposed construction or modification will
protect or benefit consumers, provide improved reliability,
and facilitate just and reasonable rates;
“(5) the electric transmission facilities—
“(A) are—
“(i) capable of transmitting electric energy at a voltage
of not less than 230 kilovolts; or
“(ii) necessary to safely and reliably interconnect or
operate 1 or more facilities described in clause (i) for
which the permit is provided; or
“(B) in the case of facilities that include advanced
transmission conductors (including
superconductors), as defined by the Commission, are capable
of transmitting electric energy at voltages determined to be
appropriate by the Commission for facilities of a comparable
throughput specifically with respect to an application for an
individual project under this section; and
“(6) if applicable, the proposed modification (including
reconductoring) will maximize, to the extent reasonable and
economical, the transmission capabilities of existing towers,
structures, or rights-of-way.”.
(c) State Siting and Consultation.—Section 216 of the
Federal Power Act (16 U.S.C. 824p) is amended by striking
subsection (d) and inserting the following:
“(d) State Siting and Consultation.—
“(1) Preservation of state siting authority.—The
Commission shall have no authority to issue a permit under
subsection (b) for the construction or modification of an
electric transmission facility within a State except as
provided in paragraph (1) of that subsection.
“(2) Consultation.—In any proceeding before the
Commission under subsection (b), the Commission shall afford
each State in which a transmission facility covered by the
permit is or will be located, each affected Federal agency
and Indian Tribe, private property owners, and other
interested persons, a reasonable opportunity to present their
views and recommendations with respect to the need for and
impact of a facility covered by the permit.
“(3) Factors for consideration.—In authorizing the
construction or modification of an electric transmission
facility under subsection (b), the Commission shall take into
consideration—
“(A) landowner input; and
“(B) impacts on productive agricultural operations.
SA 6904. Mr. SCHMITT submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 237, strike line 17 and all that follows
through page 238, line 2, and insert the following:
“(5) Landowner input.—
“(A) In general.—The term `landowner input' means input
received—
“(i) by the Commission;
“(ii) from affected landowners, such as farmers and
ranchers, in the path of the proposed construction or
modification of an electric transmission facility; and
“(iii) pursuant to notification provided to, and
consultation with, those affected landowners, farmers, and
ranchers by the Commission.
“(B) Notification.—For purposes of subparagraph (A)(iii),
the term `notification' means a written notice that
includes—
“(i) a general description of the proposed facilities,
including the purpose and general location of the facilities,
accompanied by a map or a reference to an easily accessible
map; and
“(ii) information on—
“(I) the general process of Commission proceedings; and
“(II) the rights that affected landowners retain in
Commission proceedings.
On page 242, strike line 2 and insert the following: the
siting of the applicable facility.
“(6) Standard of conduct for communicating with affected
landowners.—
“(A) In general.—An applicant for a permit under
subsection (b) shall adopt and implement a standard of
conduct for communicating with affected landowners,
including, at a minimum, requirements—
“(i) to maintain a log accounting for each instance of
applicant communications with each affected landowner;
“(ii) to ensure that all communications with each affected
landowner are transparent and accurate to the maximum extent
possible;
“(iii) to refrain from any coercive or threatening
communications with an affected landowner; and
“(iv) to hold, in each county in which the proposed
facilities would be located, a reasonable number of public
meetings accessible to affected landowners.
“(B) Preservation of other protections.—The requirements
of subparagraph (A) shall not be construed to limit or
supersede any additional or more stringent requirement
established by the Commission.”.
SA 6905. Mr. MARSHALL submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place, insert the following:
SEC. 2. ESTABLISHING REQUIREMENTS WITH RESPECT TO THE USE OF
PRIOR AUTHORIZATION UNDER MEDICARE ADVANTAGE
PLANS.
(a) In General.—Section 1852 of the Social Security Act
(42 U.S.C. 1395w-22) is amended by adding at the end the
following new subsection:
“(o) Prior Authorization Requirements.—
“(1) In general.—In the case of a Medicare Advantage plan
that imposes any prior authorization requirement with respect
to any applicable item or service (as defined in paragraph
(5)) during a plan year, such plan shall—
“(A) beginning with plan years beginning on or after
January 1, 2029—
“(i) establish the electronic prior authorization program
described in paragraph (2); and
“(ii) meet the enrollee protection standards specified
pursuant to paragraph (4); and
“(B) beginning with plan years beginning on or after
January 1, 2028, meet the transparency requirements specified
in paragraph (3).
“(2) Electronic prior authorization program.—
“(A) In general.—For purposes of paragraph (1)(A), the
electronic prior authorization program described in this
paragraph is a program that provides for the secure
electronic transmission of—
“(i) a prior authorization request from a provider or
supplier to a Medicare Advantage plan with respect to an
applicable item or service to be furnished to an individual
and a response, in accordance with this paragraph, from such
plan to such provider or supplier; and
“(ii) any supporting documentation relating to such
request or response.
“(B) Electronic transmission.—
“(i) Exclusions.—For purposes of this paragraph, a
facsimile, a proprietary payer portal that does not meet
standards specified by the Secretary, or an electronic form
shall not be treated as an electronic transmission described
in subparagraph (A).
“(ii) Standards.—An electronic transmission described in
subparagraph (A) shall comply with applicable technical
standards and other requirements to promote the
standardization and streamlining of electronic transactions
adopted by the Secretary.
“(3) Transparency requirements.—
“(A) In general.—For purposes of paragraph (1)(B), the
transparency requirements specified in this paragraph are,
with respect to a Medicare Advantage plan, the following:
“(i) The plan, annually and in a manner specified by the
Secretary, shall submit to the Secretary the following
information:
“(I) A list of all applicable items and services that were
subject to a prior authorization requirement under the plan
during the previous plan year.
“(II) The percentage and number of specified requests (as
defined in subparagraph (F)) approved during the previous
plan year by the plan in an initial determination and the
percentage and number of specified requests denied during
such plan year by such plan in an initial determination (both
in the aggregate and categorized by each item and service).
“(III) The percentage and number of specified requests
that were denied during the previous plan year by the plan in
an initial determination and that were subsequently appealed.
“(IV) The number of appeals of specified requests resolved
during the preceding plan year, and the percentage and number
of such resolved appeals that resulted in approval of the
furnishing of the item or service that was the subject of
such request, categorized by each applicable item and service
and categorized by each level of appeal (including judicial
review).
“(V) The percentage and number of specified requests that
were denied, and the percentage and number of specified
requests that were approved, by the plan during the previous
plan year through the utilization of decision support
technology, artificial intelligence technology, machine-
learning technology, clinical decision-making technology, or
any other technology specified by the Secretary.
“(VI) The average and the median amount of time (in hours)
that elapsed during the previous plan year between the
submission of a specified request to the plan and a
determination by the plan with respect to such request for
each such item and service, excluding any such requests that
were not submitted with the medical or other documentation
required to be submitted by the plan.
“(VII) The percentage and number of specified requests
that were excluded from the calculation described in
subclause (VI) based on the plan's determination that such
requests were not submitted with the medical or other
documentation required to be submitted by the plan.
“(VIII) Information on each occurrence during the previous
plan year in which, during a surgical or medical procedure
involving the furnishing of an applicable item or service
with respect to which such plan had approved a prior
authorization request, the provider or supplier furnishing
such item or service determined that a different or
additional item or service was medically necessary, including
a specification of whether such plan subsequently approved
the furnishing of such different or additional item or
service.
“(IX) A disclosure and description of any technology
described in subclause (V) that the plan utilized during the
previous plan year in making determinations with respect to
specified requests.
“(X) The number of grievances (as described in subsection
(f)) received by such plan during the previous plan year that
were related to a prior authorization requirement.
“(XI) Such other information as the Secretary determines
appropriate.
“(ii) The plan shall provide—
“(I) to each provider or supplier who seeks to enter into
a contract with such plan to furnish applicable items and
services under such plan, the list described in clause (i)(I)
and any policies or procedures used by the plan for making
determinations with respect to prior authorization requests;
“(II) to each such provider and supplier that enters into
such a contract, access to the criteria used by the plan for
making such determinations and an itemization of the medical
or other documentation required to be submitted by a provider
or supplier with respect to such a request; and
“(III) to an enrollee of the plan, upon request, access to
the criteria used by the plan for making determinations with
respect to prior authorization requests for an item or
service.
“(B) Option for plan to provide certain additional
information.—As part of the information described in
subparagraph (A)(i) provided to the Secretary during a plan
year, a Medicare Advantage plan may elect to include
information regarding the percentage and number of specified
requests made with respect to an individual and an item or
service that were denied by the plan during the preceding
plan year in an initial determination based on such requests
failing to demonstrate that such individuals met the clinical
criteria established by such plan to receive such items or
services.
“(C) Regulations.—The Secretary shall, through notice and
comment rulemaking, establish requirements for Medicare
Advantage plans regarding the provision of—
“(i) access to criteria described in subparagraph
(A)(ii)(II) to providers of services and suppliers in
accordance with such subparagraph; and
“(ii) access to such criteria to enrollees in accordance
with subparagraph (A)(ii)(III).
“(D) Publication of information.—The Secretary shall
publish information described in subparagraph (A)(i) and
subparagraph (B) on a public website of the Centers for
Medicare & Medicaid Services. Such information shall be so
published on an individual plan level and may in addition be
aggregated in such manner as determined appropriate by the
Secretary.
“(E) Medpac report.—Not later than 3 years after the date
information is first submitted under subparagraph (A)(i), the
Medicare Payment Advisory Commission shall submit to Congress
a report on such information that includes a descriptive
analysis of the use of prior authorization. As appropriate,
the Commission should report on statistics including the
frequency of appeals and overturned decisions. The Commission
shall provide recommendations, as appropriate, on any
improvement that should be made to the electronic prior
authorization programs of Medicare Advantage plans.
“(F) Specified request defined.—For purposes of this
paragraph, the term `specified request' means a prior
authorization request made with respect to an applicable item
or service.
“(4) Enrollee protection standards.—For purposes of
paragraph (1)(A)(ii), with respect to the use of prior
authorization by Medicare Advantage plans for applicable
items and services, the enrollee protection standards
specified in this paragraph are—
“(A) the adoption of transparent prior authorization
programs developed in consultation with enrollees and with
providers and suppliers with contracts in effect with such
plans for furnishing such items and services under such
plans;
“(B) allowing for the waiver or modification of prior
authorization requirements based on the performance of such
providers and suppliers in demonstrating compliance with such
requirements, such as adherence to evidence-based medical
guidelines and other quality criteria; and
“(C) conducting annual reviews of such items and services
for which prior authorization requirements are imposed under
such plans through a process that takes into account input
from enrollees and from providers and suppliers with such
contracts in effect and is based on consideration of prior
authorization data from previous plan years and analyses of
current coverage criteria.
“(5) Applicable item or service defined.—For purposes of
this subsection, the term `applicable item or service' means,
with respect to a Medicare Advantage plan, any item or
service for which benefits are available under such plan,
other than a covered part D drug.
“(6) Reports to congress.—
“(A) GAO.—Not later than January 1, 2033, the Comptroller
General of the United States shall submit to Congress a
report containing an evaluation of the implementation of the
requirements of this subsection and an analysis of issues in
implementing such requirements faced by Medicare Advantage
plans.
“(B) HHS.—
“(i) The secretary.—Not later than the end of the fifth
plan year beginning after the date of the enactment of this
subsection, and biennially thereafter through the date that
is 10 years after such date of enactment, the Secretary shall
submit to Congress a report containing a description of the
information submitted under paragraph (3)(A)(i) during—
“(I) in the case of the first such report, the fourth plan
year beginning after the date of the enactment of this
subsection; and
“(II) in the case of a subsequent report, the 2 plan years
preceding the year of the submission of such report.
“(ii) CMS.—Not later than January 1, 2029, the Centers
for Medicare & Medicaid Services and the Office of National
Coordinator for Health Information Technology shall submit to
Congress and publish on the internet website of the Centers
for Medicare & Medicaid Services a report that—
“(I) defines the term `real-time decision' and details how
the definition for such term may be updated based on any
technological advances;
“(II) using the data submitted to the Secretary under
paragraph (3)(A)(i), details a process for real-time
decisions for routinely approved items and services for
purposes of the electronic prior authorization program
described in paragraph (2); and
“(III) includes an analysis of—
“(aa) items and services that are routinely approved;
“(bb) items and services identified in item (aa) that
could be eligible for real-time decisions;
“(cc) whether establishing real-time decisions for such
items and services could—
“(AA) improve enrollee access to benefits under this part;
“(BB) produce operational efficiencies for providers and
suppliers and Medicare Advantage plans; and
“(CC) reduce health disparities for Medicare Advantage
enrollees in rural and low-income communities; and
“(dd) how determinations of routinely approved items and
services made solely through automation and artificial
intelligence by Medicare Advantage plans impact patient
access, including disparities in access for rural and low-
income beneficiaries.”.
(b) Providing the Secretary Authority To Enforce Timely
Responses for All Prior Authorization Requests Submitted
Under Part C.—Section 1852(g) of the Social Security Act (42
U.S.C. 1395w-22(g)) is amended—
(1) in paragraph (1)(A), by inserting “and in accordance
with any timeframe established by the Secretary under
paragraph (6)” after “paragraph (3)”;
(2) in paragraph (3)(B)(iii), by inserting “(with respect
to prior authorization requests submitted on or after the
first day of the third plan year beginning after the date of
the enactment of this parenthetical, any timeframe
established by the Secretary under paragraph (6))” after
“72 hours”; and
(3) by adding at the end the following new paragraph:
“(6) Timeframe for response to prior authorization
requests.—Subject to paragraph (3), the Secretary may
establish, for purposes of an organization determination made
with respect to a prior authorization request for an item or
service to be furnished to an individual, timeframes, such as
24 hours, for the organization to notify the enrollee (and
the physician involved, as appropriate) of such determination
for—
“(A) a request for expedited determination described in
paragraph (3)(A);
“(B) a real time decision for routinely approved items and
services; and
“(C) any other prior authorization request.”.
SA 6906. Mr. MARSHALL (for himself and Mr. Hickenlooper) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place, insert the following:
TITLE __—HOSPITAL AND INSURER PRICE TRANSPARENCY
SEC. _01. SHORT TITLE.
This title may be cited as the “Patients Deserve Price
Tags Act”.
SEC. _02. STRENGTHENING HOSPITAL PRICE TRANSPARENCY.
Title XXVII of the Public Health Service Act is amended by
inserting after section 2718 (42 U.S.C. 300gg-18) the
following:
“SEC. 2718A. PROVIDER PRICE TRANSPARENCY.
“(a) Definitions.—In this section:
“(1) Applicable imaging service provider.—The term
`applicable imaging provider' means a provider of services or
supplier who furnishes any imaging services to patients,
including an independent diagnostic testing facility, an
outpatient diagnostic facility, and any other imaging center
designated by the Secretary, except that such term does not
include an imaging service provider with respect to which
standard charges for specified imaging service provider
services furnished by such service provider are made
available by a hospital pursuant to subsection (b) or
specified ambulatory surgical center pursuant to subsection
(e).
“(2) Applicable laboratory.—The term `applicable
laboratory' means a `laboratory'
as such term is defined in section 493.2, of title 42, Code
of Federal Regulations (or a successor regulation), except
that such term does not include a laboratory with respect to
which standard charges for specified clinical diagnostic
laboratory tests furnished by such laboratory are made
available by a hospital pursuant to subsection (b) or
specified ambulatory surgical center pursuant to subsection
(e).
“(3) Discounted cash price.—
“(A) In general.—The term `discounted cash price' means
the minimum charge expressed as a dollar amount, subject to
subparagraph (B), that the applicable service provider
subject to this section accepts from an individual who pays
cash, or cash equivalent, for a furnished item or service,
without regard to health insurance coverage, as payment in
full.
“(B) Exclusions.—For purposes of subparagraph (A), the
minimum charge described in such subparagraph, with respect
to a furnished item or service, as applicable, shall be
calculated without taking into account any financial
assistance, including assistance attributable to charity care
(in the case of a hospital, as such term is used for purposes
of hospital cost reporting under title XVIII of the Social
Security Act), or third-party assistance for such item or
service.
“(4) Extraordinary collection actions.—The term
`extraordinary collection action' has the meaning given such
term for purposes of section 501(r) of the Internal Revenue
Code of 1986.
“(5) Gross charge.—The term `gross charge' means the
charge for an individual item or service that is reflected on
a hospital's chargemaster or similar list of prices
facilitated by any other provider, as defined by the
Secretary, absent any discounts.
“(6) Hospital.—The term `hospital' means an institution
in any State in which State or applicable local law provides
for the licensing of hospitals, that is licensed as a
hospital pursuant to such law or is approved, by the agency
of such State or locality responsible for licensing
hospitals, as meeting the standards established for such
licensing. For purposes of this paragraph, the term `State'
includes each of the several States, the District of
Columbia, Puerto Rico, the Virgin Islands, Guam, American
Samoa, and the Northern Mariana Islands.
“(7) Payer-specific negotiated charge.—The term `payer-
specific negotiated charge' means the charge that a hospital
has negotiated with a third-party payer for an item or
service.
“(8) Shoppable service.—The term `shoppable service'
means a service that can be scheduled by a healthcare
consumer in advance. Such services are routinely provided in
non-urgent situations that do not require immediate action or
attention to the patient, thus allowing patients to price
shop and schedule a service at a time that is convenient for
them.
“(9) Specified ambulatory surgical center.—The term
`specified ambulatory surgical center' means any distinct
entity that operates exclusively for the purpose of providing
surgical services to patients not requiring hospitalization
and in which the expected duration of services would not
exceed 24 hours following an admission, except that such term
does not include a surgical center with respect to which
standard charges for specified ambulatory surgical center
services furnished by such surgical center are made available
by a hospital pursuant to subsection (b).
“(10) Specified clinical diagnostic laboratory test.—The
term `specified clinical diagnostic laboratory test' means
any clinical diagnostic laboratory test or service that is
provided by the applicable laboratory, excluding advanced
diagnostic laboratory tests (as defined in section
1834A(d)(5) of the Social Security Act).
“(11) Specified imaging service.—The term `specified
imaging service' has the meaning given to the term `radiology
and certain other imaging services' for purposes of section
411.351 of title 42, Code of Federal Regulations (or
successor regulations).
“(12) Third party payer.—The term `third party payer'
means an entity that is, by statute, contract, or agreement,
legally responsible for payment of a claim for a health care
item or service.
“(b) Hospital Price Transparency.—
“(1) In general.—Beginning January 1 of the year that
begins on or after the date that is 1 year after the date of
enactment of the Patients Deserve Price Tags Act, each
hospital shall, in accordance with a method and format
established by the Secretary under paragraph (3), on a
quarterly basis (if there have been any changes to the
standard charges described in subparagraph (2) compile and
make publicly available on an internet website (without
subscription and free of charge)—
“(A) all of the hospital's standard charges for each item
and service furnished by such hospital in a machine-readable
format (or a successor technology specified by the
Secretary);
“(B) all of the hospital's standard charges in a consumer-
friendly format (as specified by the Secretary), that
includes—
“(i) as many of the Centers for Medicare & Medicaid
Services-specified shoppable services that are furnished by
the hospital, and as many additional hospital-selected
shoppable services (or all such additional services, if such
hospital furnishes fewer than 300 shoppable services) as may
be necessary for a combined total of at least 300 shoppable
services through the January 1 described in this
subparagraph, after which the hospital shall include all
shoppable services that the hospital furnishes; and
“(ii) with respect to each Centers for Medicare & Medicaid
Services-specified shoppable service that is not furnished by
the hospital, an indication that such service is not so
furnished; and
“(C) the name and business address for each person or
entity that, with respect to the hospital—
“(i) has an ownership or investment interest;
“(ii) has a controlling interest;
“(iii) is a management services organization; or
“(iv) is a significant equity investor.
“(2) Standard charges defined.—For purposes of paragraph
(1), the term `standard charges' means the following:
“(A) A plain language description of each item and
service, accompanied by any applicable billing codes,
including modifiers, using commonly recognized billing code
sets, including—
“(i) the Diagnosis Related Group;
“(ii) the Healthcare Common Procedure Coding System code;
“(iii) the National Drug Code; and
“(iv) other applicable identifiers as determined by the
Secretary (or successor code sets).
“(B) The gross charge, expressed as a dollar amount, for
each such item or service, when provided in, as applicable,
the inpatient setting and outpatient department setting.
“(C) The discounted cash price.
“(D) The payer-specific negotiated charges, expressed as a
dollar amount and clearly associated with the name of the
applicable third-party payer and name of each plan, that
apply to each such item or service when provided in, as
applicable, the inpatient setting and outpatient department
setting. If the charges are based on an algorithm, percentage
of another amount, or other formula or criteria, the hospital
shall also disclose such algorithm, percentage, formula, or
criteria as set forth in its contract and any other
information necessary to determine the negotiated charge as a
dollar amount.
“(E) The de-identified maximum and minimum negotiated
charges for each such item or service, expressed as a non-
zero dollar amount.
“(F) The amount of any facility fee, as defined by the
Secretary, or add-on charges that will be part of the final
payment amount, in addition to any information that might
help the patient understand when a facility fee or add-on
charge may apply and how to avoid such charges.
“(G) Any other additional information the Secretary may
require for the purpose of improving the accuracy of, or
enabling consumers to easily understand and compare, standard
charges for an item or service, except information that is
duplicative of any other reporting requirement under this
subsection. In the case of standard charges for an item or
service included as part of a bundled, per diem, episodic, or
other similar arrangement, the information described in this
subparagraph shall be made available as determined
appropriate by the Secretary.
“(3) Uniform method and format.—The Secretary shall
establish a standard, uniform method and format for hospitals
to use in compiling and making public information described
in paragraph (1). Such method and format shall—
“(A) include a machine-readable format (or successor
technology specified by the Secretary) containing the
information described in paragraph (2) for all items and
services furnished by each hospital;
“(B) meet such standards as determined appropriate by the
Secretary in order to ensure the accessibility and usability
of such charges; and
“(C) be updated as determined appropriate by the
Secretary, in consultation with stakeholders.
“(4) No deemed compliance.—Hospitals may offer a price
estimator tool, but the availability of such a price
estimator tool shall not be considered to deem compliance
with or otherwise vitiate the requirements of paragraph
(1)(B) or any other requirements of this subsection.
“(5) Monitoring compliance.—The Secretary shall, in
consultation with the Inspector General of the Department of
Health and Human Services, establish a process to monitor
compliance with this subsection. Such process shall ensure
that each hospital's compliance with this subsection is
reviewed not less frequently than once every year.
“(6) Attestation.—A senior official from each hospital
(the Chief Executive Officer, Chief Financial Officer, or an
official of equivalent seniority) shall attest to the
accuracy and completeness of the disclosures, and any other
attestations as required by the Secretary, made in accordance
with the hospital price transparency requirements based on
criteria established by the Secretary.
“(7) Enforcement.—
“(A) In general.—In the case of a hospital that fails to
comply with the requirements of this subsection, not later
than 30 days after the date on which the Secretary determines
such failure exists, the Secretary shall notify such hospital
of such determination, which shall include a request for a
corrective action plan if applicable to comply with such
requirements.
“(B) Civil monetary penalty.—
“(i) In general.—In addition to any other enforcement
actions or penalties that may
apply under another provision of law, a hospital that has
received a request for a corrective action plan under
subparagraph (A) and fails to comply with the requirements of
this subsection by the date that is 90 days after such
request is made shall be subject to a civil monetary penalty
of an amount specified by the Secretary for each day
(beginning on the day the hospital was first out of
compliance, as determined by the Secretary) during which such
failure was ongoing. Such amount shall not exceed—
“(I) in the case of a specified hospital with 30 or fewer
beds, $300 per day (or, in the case of such a hospital that
has been noncompliant with such requirements for a 1-year
period or longer, beginning with the first day following such
1-year period, $400 per day);
“(II) in the case of a specified hospital with more than
30 beds but fewer than 101 beds, $12.50 per bed per day (or,
in the case of such a hospital that has been noncompliant
with such requirements for a 1-year period or longer,
beginning with the first day following such 1-year period,
$15 per bed per day);
“(III) in the case of a specified hospital with more than
100 beds but fewer than 201 beds, $17.50 per bed per day (or,
in the case of such a hospital that has been noncompliant
with such requirements for a 1-year period or longer,
beginning with the first day following such 1-year period,
$20 per bed per day);
“(IV) in the case of a specified hospital with more than
200 beds but fewer than 501 beds, $20 per bed per day (or, in
the case of such a hospital that has been noncompliant with
such requirements for a 1-year period or longer, beginning
with the first day following such 1-year period, $25 per bed
per day); and
“(V) in the case of a specified hospital with more than
500 beds, $25 per bed per day (or, in the case of such a
hospital that has been noncompliant with such requirements
for a 1-year period or longer, beginning with the first day
following such 1-year period, $35 per bed per day).
“(ii) Increase authority.—In applying this subparagraph
with respect to hospitals that fail to comply in 2028 or a
subsequent year, the Secretary may through notice and comment
rulemaking increase—
“(I) the limitation on the per day amount of any penalty
applicable to a hospital under clause (i)(I);
“(II) the limitations on the per bed per day amount of any
penalty applicable under any of subclauses (II) through (V)
of clause (i); and
“(III) the limitation on the increase of any penalty
applied under clause (iii) pursuant to the amounts specified
in subclause (II) of such clause.
“(iii) Persistent noncompliance.—
“(I) In general.—In the case of a hospital that the
Secretary has determined to be noncompliant with the
provisions of this subsection two or more times during a 1-
year period (as determined by the Secretary), the Secretary
may increase any penalty otherwise applicable under this
subparagraph by the amount specified in subclause (II) with
respect to such hospital and may require such hospital to
complete such additional corrective actions plans as the
Secretary may specify.
“(II) Specified amount.—For purposes of subclause (I),
the amount specified in this subclause is, with respect to a
hospital—
“(aa) with more than 30 beds but fewer than 101 beds, an
amount that is not less than $500,000 and not more than
$1,000,000;
“(bb) with more than 100 beds but fewer than 301 beds, an
amount that is greater than $1,000,000 and not more than
$2,000,000;
“(cc) with more than 300 beds but fewer than 501 beds, an
amount that is greater than $2,000,000 and not more than
$4,000,000; and
“(dd) with more than 500 beds, and amount that is not less
than $5,000,000 and not more than $10,000,000.
“(iv) Provision of technical assistance.—The Secretary
may, to the extent practicable, provide technical assistance
relating to compliance with the provisions of this section to
hospitals requesting such assistance.
“(v) Application of certain provisions.—The provisions of
section 1128A of the Social Security Act (other than
subsections (a) and (b) of such section) shall apply to a
civil monetary penalty imposed under this subparagraph in the
same manner as such provisions apply to a civil monetary
penalty imposed under subsection (a) of such section.
“(C) No authority to waive or reduce penalty.—The
Secretary shall not grant or extend any waiver, delay,
tolling, or other mitigation of a civil monetary penalty for
failing to comply with the requirements of this subsection
except where the Secretary determines that imposing the
maximum civil monetary penalty, including penalties for
persistent noncompliance, will disrupt hospital operations in
a manner that impacts patient care. The Secretary may request
documentation in such form and manner as the Secretary may
require in order to evaluate impact on hospital operations.
“(D) Prohibition on extraordinary collection.—In addition
to civil monetary penalties applicable under subparagraph (B)
and any other enforcement actions or penalties that may apply
under any other provision of law, for a hospital that has
received a request for a corrective action plan under
subparagraph (A) and fails to comply with the requirements of
this subsection by the date that is 90 days after such
request, that hospital or any other person or entity
collecting on behalf of the hospital shall—
“(i) not take any extraordinary collection actions against
any patient or patient guarantor for debt incurred by any
patient on the date or dates of service when the hospital was
not in compliance with the requirements of this subsection;
“(ii) cease any extraordinary collection actions that have
begun against any patient or patient guarantor for debt
incurred by any patient on the date or dates of service when
the hospital was not in compliance with the requirements of
this subsection; and
“(iii) not take any extraordinary collection actions
against any patient or patient guarantor for debt incurred by
any patient on the date or dates of service when the hospital
was not in compliance with the requirements of this
subsection after the hospital comes back into compliance with
the requirements of this subsection.
“(8) Rulemaking.—
“(A) In general.—The Secretary shall implement this
subsection through notice and comment rulemaking in
accordance with section 553 of title 5, United States Code.
“(B) Ownership information.—In promulgating regulations
under this paragraph, the Secretary shall define the
individuals and organizations that must be disclosed under
paragraph (1)(C) in a manner that harmonizes disclosure
requirements with requirements established under section 1124
of the Social Security Act and prioritizes the disclosure of
individuals and organizations who's ownership or management
relationship with a hospital impacts operational, financial,
or clinical decision making for such hospital.”.
SEC. _03. CLINICAL DIAGNOSTIC LABORATORY PRICE TRANSPARENCY.
Section 2718A of the Public Health Service Act, as added by
section _02, is amended by adding at the end the following:
“(c) Clinical Diagnostic Laboratory Price Transparency.—
“(1) In general.—Beginning January 1 of the year that
begins on or after the date that is 1 year after the date of
enactment of the Patients Deserve Price Tags Act, an
applicable laboratory shall, on a quarterly basis (if there
have been any changes to the standard charges described in
paragraph (2)) compile and make publicly available on an
internet website (without subscription and free of charge)—
“(A) the standard charges described in paragraph (2) with
respect to each specified clinical diagnostic laboratory test
that such laboratory so furnishes; and
“(B) the name and business address for each person or
entity that, with respect to the laboratory—
“(i) has an ownership or investment interest;
“(ii) has a controlling interest;
“(iii) is a management services organization; or
“(iv) is a significant equity investor.
“(2) Standard charges defined.—For purposes of paragraph
(1), the term `standard charges' means, with respect to an
applicable laboratory and a specified clinical diagnostic
laboratory test, the following:
“(A) A plain language description of each item or service,
accompanied by any applicable billing codes (including
modifiers that materially change the price for insurers or
providers, and that materially change out-of-pocket costs for
consumers) using commonly recognized billing code sets,
including—
“(i) the Healthcare Common Procedure Coding System code;
“(ii) the National Drug Code; or
“(iii) other applicable identifier as determined by the
Secretary (or successor code sets).
“(B) The gross charge expressed as a dollar amount, for
each such test.
“(C) The discounted cash price.
“(D) The payer-specific negotiated charges, expressed as a
dollar amount and clearly associated with the name of the
applicable third-party payer and name of each plan, that
apply to each such test. If the charges are based on an
algorithm, percentage of another amount, or other formula or
criteria, the applicable laboratory also shall disclose such
algorithm, percentage, formula, or criteria as set forth in
its contract and any other information necessary to determine
the negotiated charge as a dollar amount.
“(E) The de-identified maximum and minimum negotiated
charges for each such item or service, expressed as a non-
zero dollar amount.
“(F) Any other additional information the Secretary may
require for the purpose of improving the accuracy of, or
enabling consumers to easily understand and compare, standard
charges for an item or service, except information that is
duplicative of any other reporting requirement under this
section. In the case of standard charges for an item or
service included as part of a bundled, per diem, episodic, or
other similar arrangement, the information described in this
subparagraph shall be made available as determined
appropriate by the Secretary.
“(3) Uniform method and format.—The Secretary shall
establish a standard, uniform method and format for
applicable laboratories to use in compiling and making public
information pursuant to paragraph (1). Such method and format
shall—
“(A) include a machine-readable format (or a successor
technology specified by the Secretary) containing the
information described in paragraph (2) for all specified
clinical diagnostic laboratory tests furnished by each
laboratory and the ownership information described in
paragraph (1)(B);
“(B) meet such standards as determined appropriate by the
Secretary in order to ensure the accessibility and usability
of such information; and
“(C) be updated as determined appropriate by the
Secretary, in consultation with stakeholders.
“(4) Monitoring compliance.—The Secretary shall, in
consultation with the Inspector General of the Department of
Health and Human Services, establish a process to monitor
compliance with this subsection. Such process shall ensure
that each applicable laboratory's compliance with this
subsection is reviewed not less frequently than once every
year.
“(5) Inclusion of ancillary services.—Any charge for a
specified clinical diagnostic laboratory test furnished by an
applicable laboratory made publicly available in accordance
with paragraph (1) shall include the charge for any ancillary
item or service (such as specimen collection services,
specimen transport, centrifugation, aliquoting, labeling,
requisition processing, and standard result reporting
services) that would customarily and routinely be furnished
by such laboratory as part of such test, as specified by the
Secretary.
“(6) Attestation.—A senior official from each clinical
diagnostic laboratory (the Chief Executive Officer, Chief
Financial Officer, or an official of equivalent seniority)
shall attest to the accuracy and completeness of the
disclosures, and any other attestations as required by the
Secretary, made in accordance with the clinical laboratory
price transparency requirements based on criteria established
by the Secretary.
“(7) Enforcement.—
“(A) In general.—In the case of an applicable laboratory
that fails to comply with the requirements of this
subsection—
“(i) the Secretary shall notify such laboratory of such
failure not later than 30 days after the date on which the
Secretary determines such failure exists; and
“(ii) upon request of the Secretary, such laboratory shall
submit to the Secretary, not later than 45 days after the
date of such request, a corrective action plan to comply with
such requirements.
“(B) Civil monetary penalty.—
“(i) In general.—An applicable laboratory that has
received a notification under subparagraph (A)(i) and fails
to comply with the requirements of this subsection by the
date that is 90 days after such notification (or, in the case
of an applicable laboratory that has submitted a corrective
action plan described in subparagraph (A)(ii) in response to
a request so described, by the date that is 90 days after
such submission) shall be subject to a civil monetary penalty
of an amount specified by the Secretary for each day
(beginning with the day on which the Secretary first
determined that such laboratory was not complying with such
requirements) during which such failure is ongoing (not to
exceed $300 per day).
“(ii) Increase authority.—In applying this subparagraph
with respect to an applicable laboratory that fails to comply
with the requirements of this subsection in 2028 or a
subsequent year, the Secretary may through notice and comment
rulemaking increase the limitation on the per day amount of
any penalty applicable to an applicable laboratory under
clause (i).
“(iii) Application of certain provisions.—The provisions
of section 1128A of the Social Security Act (other than
subsections (a) and (b) of such section) shall apply to a
civil monetary penalty imposed under this subparagraph in the
same manner as such provisions apply to a civil monetary
penalty imposed under subsection (a) of such section.
“(iv) No authority to waive or reduce penalty.—The
Secretary shall not grant or extend any waiver, delay,
tolling, or other mitigation of a civil monetary penalty for
failing to comply with the requirements of this subsection
except where the Secretary determines that imposing the
maximum civil monetary penalty will disrupt applicable
laboratory operations in a manner that impacts patient care.
The Secretary may request documentation in such form and
manner as the Secretary may require in order to evaluate
impact on applicable laboratory operations.
“(8) Provision of technical assistance.—The Secretary
shall, to the extent practicable, provide technical
assistance relating to compliance with the provisions of this
subsection to applicable laboratories requesting such
assistance.
“(9) Rulemaking.—
“(A) In general.—The Secretary shall implement this
subsection through notice and comment rulemaking in
accordance with section 553 of title 5, United States Code.
“(B) Ownership information.—In promulgating regulations
under this paragraph, the Secretary shall define the
individuals and organizations that must be disclosed under
paragraph (1)(C) in a manner that harmonizes disclosure
requirements with requirements established under section 1124
of the Social Security Act and prioritizes the disclosure of
individuals and organizations who's ownership or management
relationship with a hospital impacts operational, financial,
or clinical decision making for such hospital.”.
SEC. _04. IMAGING SERVICES PRICE TRANSPARENCY.
Section 2718A of the Public Health Service Act, as amended
by section _03, is further amended by adding at the end the
following:
“(d) Imaging Services Price Transparency.—
“(1) In general.—Beginning January 1 of the year that
begins on or after the date that is 1 year after the date of
enactment of the Patients Deserve Price Tags Act, each
applicable imaging service provider shall, on a quarterly
basis (if there have been any changes to the standard charges
described in paragraph (2)) compile and make publicly
available on an internet website (without subscription and
free of charge)—
“(A) the standard charges described in paragraph (2) with
respect to each such specified imaging service provided by
such provider; and
“(B) the name and business address for each person or
entity that, with respect to the imaging services provider—
“(i) has an ownership or investment interest;
“(ii) has a controlling interest;
“(iii) is a management services organization; or
“(iv) is a significant equity investor.
“(2) Standard charges defined.—For purposes of paragraph
(1), the term `standard charges', with respect to an
applicable imaging service provider and a specified imaging
service, means the following:
“(A) A plain language description of each item or service,
accompanied by any applicable billing codes (including
modifiers that materially change the price for insurers or
providers, and that materially change out-of-pocket costs for
consumers) using commonly recognized billing code sets,
including—
“(i) the Healthcare Common Procedure Coding System code;
“(ii) the National Drug Code; or
“(iii) other applicable identifier as determined by the
Secretary (or successor code sets).
“(B) The gross charge expressed as a dollar amount, for
each such item or service.
“(C) The discounted cash price.
“(D) The payer-specific negotiated charges, expressed as a
dollar amount and clearly associated with the name of the
applicable third-party payer and name of each plan, that
apply to each such service. If the charges are based on an
algorithm, percentage of another amount, or other formula or
criteria, the provider or supplier also shall disclose such
algorithm, percentage, formula, or criteria as set forth in
its contract and any other information necessary to determine
the negotiated charge as a dollar amount.
“(E) The de-identified maximum and minimum negotiated
charges for each such item or service, expressed as a non-
zero dollar amount.
“(F) Any other additional information the Secretary may
require for the purpose of improving the accuracy of, or
enabling consumers to easily understand and compare, standard
charges and prices for an item or service, except information
that is duplicative of any other reporting requirement under
this subsection. In the case of standard charges for an item
or service included as part of a bundled, per diem, episodic,
or other similar arrangement, the information described in
this subparagraph shall be made available as determined
appropriate by the Secretary.
“(3) Uniform method and format.—The Secretary shall
establish a standard, uniform method and format for
applicable imaging service providers to use in making public
information described in paragraph (1). Any such method and
format shall—
“(A) include a machine-readable format (as specified by
the Secretary) containing the information described in
paragraph (2) for all specified imaging services furnished by
each applicable imaging service provider and ownership
information described in paragraph (1)(B);
“(B) meet such standards as determined appropriate by the
Secretary in order to ensure the accessibility and usability
of such information; and
“(C) be updated as determined appropriate by the
Secretary, in consultation with stakeholders.
“(4) Monitoring compliance.—The Secretary shall, in
consultation with the Inspector General of the Department of
Health and Human Services, establish a process to monitor
compliance with this subsection.
“(5) Attestation.—A senior official from each specified
imaging service provider (the Chief Executive Officer, Chief
Financial Officer, or an official of equivalent seniority)
shall attest to the accuracy and completeness of the
disclosures, and any other attestations as required by the
Secretary, made in accordance with the imaging service
provider price transparency requirements based on criteria
established by the Secretary.
“(6) Enforcement.—
“(A) In general.—In the case of a specified imaging
service provider that fails to comply with the requirements
of this subsection—
“(i) the Secretary shall notify such imaging service
provider of such failure not later than 30 days after the
date on which the Secretary determines such failure exists;
and
“(ii) upon request of the Secretary, such imaging service
provider shall submit to the Secretary, not later than 45
days after the date of such request, a corrective action plan
to comply with such requirements.
“(B) Civil monetary penalty.—
“(i) In general.—A specified imaging service provider
that has received a notification under subparagraph (A)(i)
and fails to comply with the requirements of this subsection
by the date that is 90 days after such notification (or, in
the case of a specified imaging service provider that has
submitted a corrective action plan described in subparagraph
(A)(ii) in response to a request so described, by the date
that is 90 days after such submission) shall be subject to a
civil monetary penalty of an amount specified by the
Secretary for each day (beginning with the day on which the
Secretary first determined that such imaging service provider
was not complying with such requirements) during which such
failure is ongoing (not to exceed $300 per day).
“(ii) Increase authority.—In applying this subparagraph
with respect to a specified imaging service provider that
fails to comply with the requirements of this subsection in
2028 or a subsequent year, the Secretary may through notice
and comment rulemaking increase the limitation on the per day
amount of any penalty applicable to a specified imaging
service provider under clause (i).
“(iii) Application of certain provisions.—The provisions
of section 1128A of the Social Security Act (other than
subsections (a) and (b) of such section) shall apply to a
civil monetary penalty imposed under this subparagraph in the
same manner as such provisions apply to a civil monetary
penalty imposed under subsection (a) of such section.
“(iv) No authority to waive or reduce penalty.—The
Secretary shall not grant or extend any waiver, delay,
tolling, or other mitigation of a civil monetary penalty for
failing to comply with the requirements of this subsection
except where the Secretary determines that imposing the
maximum civil monetary penalty will disrupt specified imaging
service provider operations in a manner that impacts patient
care. The Secretary may request documentation in such form
and manner as the Secretary may require in order to evaluate
impact on specified imaging service provider operations.
“(7) Provision of technical assistance.—The Secretary
shall, to the extent practicable, provide technical
assistance relating to compliance with the provisions of this
subsection to providers of services and suppliers requesting
such assistance.
“(8) Rulemaking.—
“(A) In general.—The Secretary shall implement this
subsection through notice and comment rulemaking in
accordance with section 553 of title 5, United States Code.
“(B) Ownership information.—In promulgating regulations
under this paragraph, the Secretary shall define the
individuals and organizations that must be disclosed under
paragraph (1)(C) in a manner that harmonizes disclosure
requirements with requirements established under section 1124
of the Social Security Act and prioritizes the disclosure of
individuals and organizations who's ownership or management
relationship with a hospital impacts operational, financial,
or clinical decision making for such hospital.”.
SEC. _05. AMBULATORY SURGICAL CENTER PRICE TRANSPARENCY.
Section 2718A of the Public Health Service Act, as amended
by section _04, is further amended by adding at the end the
following:
“(e) Ambulatory Surgical Center Price Transparency.—
“(1) In general.—Beginning January 1 of the year that
begins on or after the date that is 1 year after the date of
enactment of the Patients Deserve Price Tags Act, each
specified ambulatory surgical center shall, on a quarterly
basis (if there have been any changes to the standard charges
described in paragraph (2)), compile and make publicly
available on an internet website (without subscription and
free of charge)—
“(A) the standard charges described in paragraph (2) with
respect to each specified service furnished by such surgical
center; and
“(B) the name and business address for each person or
entity that, with respect to the ambulatory surgical center—
“(i) has an ownership or investment interest;
“(ii) has a controlling interest;
“(iii) is a management services organization; or
“(iv) is a significant equity investor.
“(2) Standard charges defined.—For purposes of paragraph
(1), the term `standard charges' with respect to standard
charges and prices made public by a specified ambulatory
surgical center means the following:
“(A) A plain language description of each item or service,
accompanied by any applicable billing codes (including
modifiers that materially change the price for insurers or
providers, and that materially change out-of-pocket costs for
consumers) using commonly recognized billing code sets,
including—
“(i) the Healthcare Common Procedure Coding System code;
“(ii) the National Drug Code; or
“(iii) other applicable identifier as determined by the
Secretary (or successor code sets).
“(B) The gross charge, expressed as a dollar amount, for
each such item or service.
“(C) The discounted cash price.
“(D) The payer-specific negotiated charges, expressed as a
dollar amount and clearly associated with the name of the
applicable third party payer and name of each plan, that
apply to each such item or service. If the charges are based
on an algorithm, percentage of another amount, or other
formula or criteria, the ambulatory surgical center also
shall disclose such algorithm, percentage, formula, or
criteria as set forth in its contract and any other
information necessary to determine the negotiated charge as a
dollar amount.
“(E) The de-identified maximum and minimum negotiated
charges for each such item or service, expressed as a non-
zero dollar amount.
“(F) Any other additional information the Secretary may
require for the purpose of improving the accuracy of, or
enabling consumers to easily understand and compare, standard
charges and prices for an item or service. In the case of
standard charges for an item or service included as part of a
bundled, per diem, episodic, or other similar arrangement,
the information described in this subparagraph shall be made
available as determined appropriate by the Secretary.
“(3) Uniform method and format.—The Secretary shall
establish a standard, uniform method and format for specified
ambulatory surgical centers to use in compiling and making
public information pursuant to paragraph (1). Such method and
format shall—
“(A) include a machine-readable format (or a successor
technology specified by the Secretary) containing the
information described in paragraph (2) for all specified
services furnished by each ambulatory surgical center and for
the ownership information described in paragraph (1)(B);
“(B) meet such standards as determined appropriate by the
Secretary in order to ensure the accessibility and usability
of such charges; and
“(C) be updated as determined appropriate by the
Secretary, in consultation with stakeholders.
“(4) Monitoring compliance.—The Secretary shall, in
consultation with the Inspector General of the Department of
Health and Human Services, establish a process to monitor
compliance with this subsection. Such process shall ensure
that each specified ambulatory surgical center's compliance
with this subsection is reviewed not less frequently than
once every year.
“(5) Attestation.—A senior official from each specified
ambulatory surgical center (the Chief Executive Officer,
Chief Financial Officer, or an official of equivalent
seniority) shall attest to the accuracy and completeness of
the disclosures, and any other attestations as required by
the Secretary, made in accordance with the ambulatory center
price transparency requirements based on criteria established
by the Secretary.
“(6) Enforcement.—
“(A) In general.—In the case of a specified ambulatory
surgical center that fails to comply with the requirements of
this subsection—
“(i) the Secretary shall notify such ambulatory surgical
center of such failure not later than 30 days after the date
on which the Secretary determines such failure exists; and
“(ii) upon request of the Secretary, such ambulatory
surgical center shall submit to the Secretary, not later than
45 days after the date of such request, a corrective action
plan to comply with such requirements.
“(B) Civil monetary penalty.—
“(i) In general.—A specified ambulatory surgical center
that has received a notification under subparagraph (A)(i)
and fails to comply with the requirements of this subsection
by the date that is 90 days after such notification (or, in
the case of a specified ambulatory surgical center that has
submitted a corrective action plan described in subparagraph
(A)(ii) in response to a request so described, by the date
that is 90 days after such submission) shall be subject to a
civil monetary penalty of an amount specified by the
Secretary for each day (beginning with the day on which the
Secretary first determined that such ambulatory surgical
center was not complying with such requirements) during which
such failure is ongoing (not to exceed $300 per day).
“(ii) Increase authority.—In applying this subparagraph
with respect to a specified ambulatory surgical center that
fails to comply with the requirements of this subsection in
2028 or a subsequent year, the Secretary may through notice
and comment rulemaking increase the limitation on the per day
amount of any penalty applicable to a specified ambulatory
surgical center under clause (i).
“(iii) Application of certain provisions.—The provisions
of section 1128A of the Social Security Act (other than
subsections (a) and (b) of such section) shall apply to a
civil monetary penalty imposed under this subparagraph in the
same manner as such provisions apply to a civil monetary
penalty imposed under subsection (a) of such section.
“(iv) No authority to waive or reduce penalty.—The
Secretary shall not grant or extend any waiver, delay,
tolling, or other mitigation of a civil monetary penalty for
failing to comply with the requirements of this subsection
except where the Secretary determines that imposing the
maximum civil monetary penalty will disrupt specified
ambulatory surgical center operations in a manner that
impacts patient care. The Secretary may request documentation
in such form and manner as the Secretary may require in order
to evaluate impact on specified ambulatory surgical center
operations.
“(7) Provision of technical assistance.—The Secretary
shall, to the extent practicable, provide technical
assistance relating to compliance with the provisions of this
subsection to specified ambulatory surgical centers
requesting such assistance.
“(8) Rulemaking.—
“(A) In general.—The Secretary shall implement this
subsection through notice and comment rulemaking in
accordance with section 553 of title 5, United States Code.
“(B) Ownership information.—In promulgating regulations
under this paragraph, the Secretary shall define the
individuals and organizations that must be disclosed under
paragraph (1)(C) in a manner that harmonizes disclosure
requirements with requirements established under section 1124
of the Social Security Act and prioritizes the disclosure of
individuals and organizations who's ownership or management
relationship with a hospital impacts operational, financial,
or clinical decision making for such hospital.
“(f) Continued Applicability of State Law.—The provisions
of this section shall not supersede any provision of State
law that establishes, implements, or continues in effect any
requirement or prohibition related to health care price
transparency, except to the extent that such requirement or
prohibition prevents the application of a requirement or
prohibition of this section.”.
SEC. _06. STRENGTHENING HEALTH COVERAGE TRANSPARENCY
REQUIREMENTS.
(a) Transparency in Coverage.—Section 2715A of the Public
Health Service Act (42 U.S.C. 300gg-15a) is amended—
(1) by striking “A Group health” and inserting the
following:
“(a) In General.—A group health”; and
(2) by ending at the end the following:
“(b) Additional Transparency Requirements.—
“(1) Specified information required.—
“(A) In general.—A group health plan or health insurance
issuer offering coverage in the individual or group market
shall provide to each participant, beneficiary, or enrollee,
at the time of enrollment in the plan or coverage, the
information described in subparagraph (B).
“(B) Information required.—For purposes of subparagraph
(A), the information specified in this subparagraph is, with
respect to benefits available under the plan or coverage for
an item or service furnished by a health care provider, the
following (or other information as determined appropriate by
the Secretary):
“(i) If such provider is an in-network provider with
respect to such item or service, the in-network rate (as
defined in paragraph (5)) for such item or service.
“(ii) If such provider is not described in clause (i), the
out-of-network allowed amount (as such term is defined for
purposes of section 147.210(a)(2)(xvii) of title 45, Code of
Federal Regulation) for such item or service that the plan or
coverage will pay without regard to the amount in clause
(iii).
“(iii) The amount of cost-sharing liability (including
deductibles, copayments, and coinsurance) that the individual
will incur for such item or service based on the information
available to the plan or coverage at the time the request is
made (which, in the case such item or service is to be
furnished by a provider described in clause (ii), shall be
calculated using the maximum amount described in such
clause).
“(iv) The accumulated amounts with respect to any
deductible or out-of-pocket maximum under the plan or
coverage reflected in the plan's or coverage's records at the
time the request is made (broken down, in the case separate
deductibles or maximums apply to separate individuals
enrolled in the plan or coverage, by such separate
deductibles or maximums, in addition to any cumulative
deductible or maximum).
“(v) In the case such plan or coverage imposes any
frequency or volume limitations with respect to such item or
service (excluding medical necessity determinations), the
amount that such individual has accrued towards such
limitation with respect to such item or service reflected in
the plan's or coverage's records at the time the request is
made.
“(vi) Information about any utilization management
requirements, such as prior authorization, concurrent review,
step therapy, fail first, or similar requirements applicable
to coverage of such item or service under such plan or
coverage, including information regarding utilization
management practices and determinations, including aggregate
information related to approval and denial rates, associated
timelines, and appeals, as determined appropriate by the
Secretary.
“(C) Self-service tool .—For purposes of subparagraph
(A), a self-service tool established by a health plan meets
the requirements of this subparagraph if such tool—
“(i) is based on an internet website;
“(ii) provides for real-time responses to requests
described in such subparagraph;
“(iii) is updated in a manner such that the information is
accurate based on the information available to the plan or
coverage at the time the request is made;
“(iv) allows such a request to be made for information
with respect to an item or service furnished by—
“(I) a specific provider that is an in-network provider
with respect to such item or service; or
“(II) all providers that are in-network providers with
respect to such plan or coverage and such item or service;
“(v) provides that such a request may be made for
information with respect to an item or service through use
of—
“(I) the billing code for such item or service; or
“(II) through use of a descriptive term for such item or
service; and
“(vi) is made available in plain language, without
subscription or other fee.
“(D) Nonduplication.—A group health plan or health
insurance issuers shall be deemed to be in compliance with
this paragraph if such plan or issuer has a tool in place
under section 2799A-4.
“(2) Rate and payment information.—
“(A) In general.—Beginning January 1 of the year that
begins on or after the date that is 1 year after the date of
enactment of the Patients Deserve Price Tags Act, and every
quarter thereafter (if there have been any changes to the
rate and payment information described in subparagraphs (B)
and (C), each group health plan or health insurance issuer
offering coverage in the group or individual market shall
make available to the public, the rate and payment
information described in subparagraph (B) in accordance with
subparagraph (C).
“(B) Rate and payment information described.—For purposes
of subparagraph (A), the rate and payment information
described in this subparagraph is, with respect to a plan or
coverage, the following:
“(i) With respect to each item or service for which
benefits are available under such plan or coverage, excluding
those included in clause (ii), identified by CPT, HCPCS, DRG,
or other applicable nationally recognized identifier,
including any applicable code modifiers, and accompanied by a
plain language description of the item or service, the in-
network rate (expressed as a dollar amount or percentage of
charges, unless otherwise specified by the Secretary),
including the individual and total amounts for any bundled
rates, in effect as of the date of the submission of such
information with each provider (identified by national
provider identifier) that is an in-network provider with
respect to such item or service, other than such a rate in
effect with a provider that an issuer has determined based on
factors determined by the Secretary (such as medical
specialty) that it is unlikely that the provider would be
reimbursed for the item or service.
“(ii) With respect to each drug and biologic (identified
by National Drug Code, J-code, or other commonly recognized
billing code used for drugs) for which benefits are available
under such plan or coverage, the in-network rate (expressed
as a dollar amount or percentage of charges, unless otherwise
specified by the Secretary) in effect as of the first day of
the quarter in which such information is made public with
each pharmacy or other prescription drug dispenser that is an
in-network pharmacy or other prescription drug dispenser with
respect to such drug.
“(iii) With respect to each item or service for which
benefits are available under such plan or coverage (expressed
as a dollar amount), identified by CPT, DRG, HCPCS, or other
applicable nationally recognized identifier, including any
applicable code modifiers, and accompanied by a brief
description of the item or service, the amount billed or
charged by the provider, and the amount allowed by the plan
or coverage, for each such item or service furnished during a
representative lookback window established by the Secretary
by each provider that was an out-of-network provider with
respect to such item or service, broken down by each such
provider (identified by national provider identifier), other
than items and services with respect to which not fewer than
11 claims for such item or service were submitted to such
plan during such period.
“(C) Manner of submission.—Rate and payment information
required to be submitted and made available under this
paragraph shall be so submitted and so made available as
follows:
“(i) Information shall be contained in at least 3 separate
machine-readable files corresponding to the information
described in each of clauses (i) through (iii) of
subparagraph (B) that meet such requirements as specified by
the Secretary through rulemaking, in consultation with the
Secretaries of Labor and the Treasury, to apply comparable
requirements to group health plans and health insurance
coverage and to entities providing benefit management or
other third-party administration services on a contractual
basis with a group health plan or coverage.
“(ii) Requirements specified by the Secretary through
rulemaking (or subregulatory guidance) shall ensure the
following:
“(I) Such files are made available in a widely available
format that allows for information contained in such files to
be compared across plans and coverage and are freely
accessible to individuals at no cost and without the need to
establish a user account or provide other credentials.
“(II) Each such file includes each of the following data
elements:
“(aa) A numerical identifier for the group health plan or
health insurance issuer (such as a Health Insurance Oversight
System identifier).
“(bb) A plain-language description of the item or service
(including, for drugs, the proprietary and nonproprietary
name assigned).
“(cc) The billing code, including any applicable
modifiers, associated with such item or service, including
the Healthcare Common Procedure Coding System code,
diagnosis-related group, national drug code, or other
commonly recognized code set.
“(dd) The place of service code.
“(ee) The National Provider Identifier and provider Tax
Identification Number.
“(iii) The rate and payment information disclosed under
clauses (i) through (iii) of subparagraph (B) shall be
separately delineated for each item or service, regardless of
whether such item or service is reimbursed as a part of a
bundle, episode, or other grouping of items and services.
“(iv) An officer or executive of competent authority shall
attest to the accuracy and completeness of information
submitted and made available under this subparagraph. In the
case of a plan or coverage that relies on a third-party
administrator or other service provider to compile the
information submitted and made available under this
subparagraph, such plan or coverage may satisfy the
requirement under this clause by obtaining such an
attestation from the third-party administrator or other
service provider. Such attestation shall be subject to
enforcement under paragraph (6).
“(3) Ownership information.—Beginning January 1 of the
year that begins on or after the date that is 1 year after
the date of enactment of the Patients Deserve Price Tags Act,
and every quarter thereafter (if there have been any changes
in the required information), each group health plan or
health insurance issuer offering coverage in the individual
or group market shall submit to the Secretary, the applicable
State authority, and make available to the public, the name
and business address of each person or entity that, with
respect to such plan or coverage—
“(A) has an ownership or investment interest;
“(B) has a controlling interest;
“(C) is a management services organization; or
“(D) is a significant equity investor.
“(4) Enforcement.—
“(A) In general.—Each year, the Secretary shall audit the
machine-readable files required by paragraph (2)(B) posted by
not fewer than 50 group health plans or health insurance
issuers for compliance with format and accessibility
standards.
“(B) Notification and request for corrective action.—In
the case of a group health plan or health insurance issuer
that fails to comply with the requirements of this paragraph,
not later than 30 days after the date on which the Secretary
determines such failure exists, the Secretary shall submit to
such plan or issuer a notification of such determination,
which shall include a request for a corrective action plan to
comply with such requirements.
“(C) Civil monetary penalty.—A plan or issuer that has
received a request for a corrective action plan under
subparagraph (B) and fails to comply with the requirements of
this paragraph by the date that is 30 days after such request
is made shall be subject to a civil monetary penalty of an
amount specified by the Secretary for each day (beginning
with the day on which such health plan or health insurance
issuer was failing to comply with such paragraph) during
which such failure was ongoing. Such amount shall not exceed
$300 per participant, beneficiary, or covered individual per
day or $10,000,000, whichever is lesser.
“(5) Definitions.—In this subsection:
“(A) In-network provider.—The term `in-network provider'
has the meaning given such term in section 54.9815-
2715A1(a)(2)(xii) of title 26, Code of Federal Regulations.
“(B) In-network rate.—The term `in-network rate' means,
with respect to a health plan and an item or service
furnished by a provider that is a participating provider with
respect to such plan and item or service, the contracted rate
in effect between such plan and such provider for such item
or service. If the rate is based on an algorithm, percentage
of another amount, or other formula or criteria, the health
plan also shall disclose such algorithm, percentage, formula,
or criteria as set forth in its contract and any other terms,
schedules, exhibits, data, or other information referenced in
any such contract as shall be required to determine and
disclose the negotiated rate.
“(6) Rulemaking.—
“(A) In general.—The Secretary shall implement this
subsection through notice and comment rulemaking in
accordance with section 553 of title 5, United States Code.
The Secretary may implement the manner of submission of data
described in paragraph (2)(C) through subregulatory guidance.
“(B) Regulations.—Regulations promulgated pursuant to
this subsection shall provide the following:
“(i) The Secretary shall annually audit the machine-
readable files required by paragraph (2)(B) posted by not
fewer than 50 group health plans or health insurance issuers
for compliance with format and accessibility standards.
“(ii) The Secretary of Labor shall annually audit the
machine-readable files required by paragraph (2)(B) posted by
not fewer than 250 group health plans or service providers
furnishing third-party administrator services to a group
health plan for compliance with format and accessibility
standards.
“(iii) The Secretary of Health and Human Services, in
conjunction with the Secretary of Labor and the Secretary of
the Treasury, shall annually issue a report to Congress that
includes findings, conclusions, and enforcement actions taken
based on audits of the machine-readable files. Such report
shall be provided no later than July 1 following the calendar
year during which the audits were completed. The Secretary of
Health and Human Services shall make such report to Congress
accessible to the public.”.
(b) Effective Date.—
(1) In general.—The amendments made by subsections (a) and
(b) shall apply beginning January 1 of the year that begins
on or after the date that is 1 year after the date of
enactment of the Patients Deserve Price Tags Act.
(2) Continued applicability of rules for previous years.—
Nothing in the amendments made by this section may be
construed as affecting the applicability of the rule entitled
“Transparency in Coverage” published by the Department of
the Treasury, the Department of Labor, and the Department of
Health and Human Services on November 12, 2020 (85 Fed. Reg.
72158), or amendments made to such rule that are applicable
before the date of enactment of the Patients Deserve Price
Tags Act.
SEC. _07. INCREASING GROUP HEALTH PLAN ACCESS TO HEALTH DATA.
(a) Group Health Plan Access to Information.—
(1) In general.—Section 2799A-9 of the Public Health
Service Act (42 U.S.C. 300gg-119) is amended by adding at the
end the following:
“(1) Group health plan access to information.—
“(A) In general.—No contract or arrangement for services,
and no extension or renewal of such contract or arrangement,
between a group health plan that is offered by a specified
large employer or that is a specified large plan (as such
terms are defined in subparagraph (F)) and a health care
provider (which for purposes of this subparagraph, includes a
health care facility), network or association of providers,
service provider offering access to a network of providers,
third-party administrator, health insurance issuer offering
group or individual health insurance coverage, or pharmacy
benefit manager, or any entity acting as an intermediary
between the group health plan and the health care provider,
network association of providers, service provider offering
access to a network or association of providers (including a
licensed health insurance issuer or third-party
administrator), or pharmacy benefit manager (collectively
referred to in this subsection as `Covered Service
Providers'), is reasonable within the meaning of this
subsection unless such contract or arrangement—
“(i) allows the responsible plan fiduciary (as that term
is defined in section 408(b)(2)(B)(ii)(I)(ee)) access to all
claims and encounter information or data, and any
documentation supporting claim payments, including, but not
limited to, medical records and policy documents, or
information or data described in subsection (a)(1)(B) to—
“(I) comply with applicable law; and
“(II) determine the accuracy or reasonableness of claims
payment; and
“(ii) does not—
“(I) unreasonably limit or delay access, as determined by
the Secretary but in any event not longer than 15 days, after
a request for access by a plan fiduciary to such information
or data;
“(II) limit the volume of claims and encounter information
or data that the group health plan, the plan sponsor, the
plan administrator, or a business associate of such plan may
access during an audit or pursuant to any request for such
information or data;
“(III) limit the disclosure of pricing terms for value-
based payment arrangements or capitated payment arrangements,
including—
“(aa) payment calculations and formulas;
“(bb) quality measures;
“(cc) contract terms;
“(dd) payment amounts;
“(ee) measurement periods for all incentives; and
“(ff) other payment methodologies used by an entity,
including a health care provider (including a health care
facility), network or association of providers, service
provider offering access to a network of providers, third-
party administrator, or pharmacy benefit manager;
“(IV) limit the disclosure of overpayments and overpayment
recovery terms;
“(V) limit the right of the group health plan, the plan
sponsor, or the plan administrator of such plan to select an
auditor or define audit scope or frequency;
“(VI) otherwise limit or unduly delay the group health
plan, the plan sponsor, the plan administrator, or a business
associate of such plan from accessing claims and encounter
information or data;
“(VII) limit the disclosure of fees charged to the group
health plan related to plan administration and claims
processing, including renegotiation fees, access fees,
repricing fees, or enhanced review fees;
“(VIII) limit the right of the group health plan, the plan
sponsor, or the plan administrator to request action on any
suspect claim payments;
“(IX) limit public disclosure of de-identified or
aggregate information;
“(X) limit the disclosure of, with respect to a provider
that files claims under such plan, whether a Covered Service
Provider—
“(aa) has an ownership or investment interest;
“(bb) has a controlling interest;
“(cc) is a management services organization; or
“(dd) is a significant equity investor; or
“(XI) limit the disclosure of the name and address of each
person or entity that, with respect to the health plan
service provider—
“(aa) has an ownership or investment interest;
“(bb) has a controlling interest; or
“(cc) is a significant equity investor.
“(B) Manner of providing information or data.—
“(i) In general.—A Covered Service Provider shall provide
information or data under this subsection in a manner
consistent with
the privacy regulations promulgated under section 13402(a) of
the Health Information Technology for Economic and Clinical
Health Act (42 U.S.C. 17932(a)) and consistent with the
privacy regulations promulgated under the Health Insurance
Portability and Accountability Act of 1996 in part 160 and
subparts A and E of part 164 of title 45, Code of Federal
Regulations (or successor regulations) (referred to in this
paragraph as the `HIPAA privacy regulations') and shall
restrict the use and disclosure of such information according
to such privacy regulations and such HIPAA privacy
regulations. A Covered Service Provider shall not be required
to disclose information or data under this subsection that
could reasonably identify a participant or beneficiary
through individually identifiable health information (as such
term is defined under HIPAA privacy regulations).
“(ii) Additional requirements.—In carrying out this
subsection, a Covered Service Provider shall comply with
section 164.504(f) of title 45, Code of Federal Regulations
(or a successor regulation).
“(iii) Rule of construction.—
“(I) In general.—Nothing in this subsection shall be
construed to modify the requirements for the creation,
receipt, maintenance, or transmission of protected health
information under the HIPAA privacy regulations.
“(II) Civil rights laws.—Nothing in this subsection shall
be construed to affect the application of any Federal or
State privacy or civil rights law, including the HIPAA
privacy regulations, the Genetic Information
Nondiscrimination Act of 2008 (Public Law 110-233) (including
the amendments made by such Act), the Americans with
Disabilities Act of 1990 (42 U.S.C. 12101 et seq.), section
504 of the Rehabilitation Act of 1973 (29 U.S.C. 794),
section 1557 of the Patient Protection and Affordable Care
Act (42 U.S.C. 18116), title VI of the Civil Rights Act of
1964 (42 U.S.C. 2000d), and title VII of the Civil Rights Act
of 1964 (42 U.S.C. 2000e).
“(iv) Written notice.—Each plan year, a Covered Service
Provider shall provide to each participant or beneficiary
written notice informing the participant or beneficiary of
the requirement that Covered Service Providers respond to
requests to submit information or data under paragraph (1),
as applicable, which may include incorporating such
notification in plan documents provided to the participant or
beneficiary, or providing individual notification.
“(v) Clarification regarding public disclosure of
information.—Nothing in this subsection shall prevent a
Covered Service Provider from placing reasonable restrictions
on the public disclosure of the information or data described
in paragraph (1), except that such Provider may not restrict
disclosure of such report to the Department of Health and
Human Services, the Department of Labor, or the Department of
the Treasury.
“(vi) Limitation.—This paragraph shall not be construed
to abridge or limit the disclosure requirements under this
subsection or to impose additional privacy or security
requirements on Covered Service Providers or plan sponsors.
“(C) Limitation on disclosure.—A group health plan
receiving information or data under this subsection may
disclose such information only in a manner that is consistent
with HIPAA and the privacy and security regulations
promulgated thereunder, regardless of their direct or
indirect applicability to the plan or any entities that could
be or are business associates. A group health plan (and any
business associate or other entity acting on behalf of such
plan) may use such information or data only for purposes of
plan administration and may not sell, license, or otherwise
commercially exploit such information or data or provide such
information or data to any third party that may take such
action.
“(D) Requirements of information.—Information made
available under this subsection shall conform to the
following standards:
“(i) All claims from a healthcare provider shall be made
to the group health plan in accordance with transaction
standards adopted by regulation under HIPAA, as follows:
“(I) Institutional, professional, and dental claims shall
be in ASC X12N 837D format or any subsequent standard as
established by the Secretary.
“(II) Pharmacy claims shall be in the National Council for
Prescription Drug Programs (NCPDP) format or any subsequent
standard as established by the Secretary.
“(III) The files shall be unmodified copies of the files
sent from the provider, or, upon request, delivered in a
machine readable format. In the event that paper claims are
sent by the provider, they shall be converted to the
appropriate standard electronic format. Files shall be
accessible to the plan at no cost to the group health plan.
“(ii) All claim payment (or EFT, electronic funds
transfer) and electronic remittance advice (ERA) notices sent
by a Covered Service Provider shall be made available to the
group health plan as ASC X12N 835 files (or any other format
as identified by the Secretary) in accordance with standards
adopted by regulation under HIPAA. The files shall be
unmodified copies of the files sent by the Covered Service
Provider to the healthcare provider. Files shall be
accessible at no cost to the group health plan.
“(iii) The contractual terms containing payment
calculations and formulas, pricing methodologies, and other
information used to determine the dollar value of
reimbursement, in a format as specified by the Secretary.
“(iv) All non-claim costs shall be itemized and made
available to the group health plan as requested through a
web-based portal, through an application program interface
(API), through a downloadable Comma-Separated Value (CSV)
file, and, as appropriate, through other downloadable
machine-readable file types.
“(E) Implementation.—The Secretary shall implement this
subsection through notice and comment rulemaking in
accordance with section 553 of title 5, United States Code.
“(F) Definitions.—
“(i) In general.—The provisions of sections 408 and 410
of the Employee Retirement Income Security Act of 1974 shall
apply with respect to terms used under this subsection.
“(ii) Specified large employer.—In this subsection, the
term `specified large employer' means, in connection with a
group health plan (including group health insurance coverage
offered in connection with such a plan) established or
maintained by a single employer, with respect to a calendar
year or a plan year, as applicable, an employer who employed
an average of at least 50 employees on business days during
the preceding calendar year or plan year and who employs at
least 1 employee on the first day of the calendar year or
plan year.
“(iii) Specified large plan.—In this subsection, the term
`specified large plan' means a group health plan (including
group health insurance coverage offered in connection with
such a plan) established or maintained by a plan sponsor
described in clause (ii) or (iii) of section 3(16)(B) of the
Employee Retirement Income Security Act of 1974 that had an
average of at least 50 participants on business days during
the preceding calendar year or plan year, as applicable.”.
(2) Civil enforcement.—
(A) Civil enforcement.—Subsection (c) of section 502 of
such Act (29 U.S.C. 1132) is amended by adding at the end the
following new paragraph:
“(13)(A) In the case of an agreement between a group
health plan (as defined in section 733(a)), the plan sponsor
of such plan (as defined in section 3(16)(B)), or the plan
administrator of such plan (as defined in section 3(16)(A))
and a health care provider (which, for purposes of this
paragraph, includes a health care facility), network or
association of providers, service provider offering access to
a network or association of providers, third-party
administrator, or pharmacy benefit manager, that violates the
provisions of section 724(b), the Secretary may assess a
civil penalty against such provider, network or association,
service provider offering access to a network or association
of providers, third-party administrator, pharmacy benefit
manager, or other service provider in the amount of up to
$10,000 for each day during which such violation continues.
Such penalty shall be in addition to other penalties as may
be prescribed by law.
“(B) Nothing in subparagraph (A) shall be construed to
permit the Secretary to regulate health care providers acting
in their capacity as medical organizations furnishing items
and services to patients.”.
(B) Existing provisions void.—Section 410 of such Act (29
U.S.C. 1110) is amended by adding at the end the following:
“(c) Any provision in an agreement or instrument shall be
void as against public policy if such provision—
“(1) unduly delays or limits a group health plan (as
defined in section 733(a)), the plan sponsor of such plan (as
defined in section 3(16)(B)), or the plan administrator of
such plan (as defined in section 3(16)(A)) from accessing the
claims and encounter information or data described in section
724(b)(1)(B); or
“(2) violates the requirements of section 408(b)(2)(C).”.
(C) Technical amendments.—Section 408(b)(2)(B) of such Act
(29 U.S.C. 1108(b)(2)) is amended—
(i) in clause (i), by striking “this clause” and
inserting “this paragraph”; and
(ii) by adding at the end the following:
“(xi) A contract or arrangement shall not be reasonable
under this subparagraph if it fails to comply with section
724(b).”.
(b) Updated Attestation for Price and Quality
Information.—Section 2799A-9(a)(4) of the Public Health
Service Act (42 U.S.C. 300gg-119(a)(4)) is amended to read as
follows:
“(4) Attestation.—
“(A) In general.—Subject to subparagraph (C), a group
health plan or health insurance issuer offering group health
insurance coverage shall annually submit to the Secretary an
attestation that such plan or issuer of such coverage is in
compliance with the requirements of this subsection. Such
attestation shall also include a statement verifying that—
“(i) the information or data described under subparagraphs
(A) and (B) of paragraph (1) is available upon request and
provided to the group health plan, the plan sponsor, the plan
administrator, or the business associate of such plan, or the
issuer, as applicable, in a timely manner; and
“(ii) there are no terms in the agreement under such
paragraph (1) that directly or indirectly restrict or unduly
delay a group health plan, the plan sponsor, the plan
administrator, a business associate of such plan, or the
issuer from auditing, reviewing, or otherwise accessing such
information.
“(B) Limitation on submission.—A group health plan or
issuer offering group health insurance coverage may not enter
into an
agreement with a third-party administrator or other service
provider to submit the attestation required under
subparagraph (A).
“(C) Exception.—In the case of a group health plan or
health insurance issuer offering group health insurance
coverage that is unable to obtain the information or data
needed to submit the attestation required under subparagraph
(A), such plan or issuer may submit a written statement in
lieu of such attestation that includes—
“(i) an explanation of why such plan or issuer was
unsuccessful in obtaining such information or data, including
whether such plan, the plan sponsor, or the plan
administrator or issuer was limited or prevented from
auditing, reviewing, or otherwise accessing such information
or data;
“(ii) a description of the efforts made by the group
health plan, the plan sponsor, or the plan administrator to
remove any gag clause provisions from the agreement under
paragraph (1); and
“(iii) a description of any response by the third-party
administrator or other service provider with respect to
efforts to comply with the attestation requirement under
subparagraph (A), including the name of the third-party
administrator or other service provider.”.
(c) Effective Date.—The amendments made by subsections (a)
and (b) shall apply with respect to a plan beginning with the
first plan year that begins on or after the date that is 1
year after the date of enactment of this Act.
SEC. _08. OVERSIGHT OF ADMINISTRATIVE SERVICE PROVIDERS.
(a) PHSA Amendment.—Part D of title XXVII of the Public
Health Service Act (42 U.S.C. 300gg-111 et seq.), as amended
by section 6701(a) of the Consolidated Appropriations Act,
2026, is amended by adding at the end the following:
“SEC. 2799A-12. OVERSIGHT OF ADMINISTRATIVE SERVICE
PROVIDERS.
“(a) In General.—For plan years beginning on or after
January 1 of the year that begins on or after the date that
is 1 year after the date of enactment of the Patients Deserve
Price Tags Act, no agreement between a group health plan that
is offered by a specified large employer or that is a
specified large plan (as such terms are defined in section
2799A-11(f)) or a health insurance issuer offering individual
or group health coverage (that makes an election subject to
subsection (b)(5)) and a health insurance issuer that is
operating as a third-party administrator, a health care
provider, network or association of providers, third-party
administrator, service provider offering access to a network
of providers, pharmacy benefit managers, or any other third
party (each referred to in this section as a `health plan
service provider') is permissible if such agreement limits
(or delays beyond the applicable reporting period described
in subsection (b)(1)) the disclosure of information to such
group health plans and health insurance issuers in a manner
that prevents any health plan service provider from providing
the information described in subsection (b)).
“(b) Required Disclosures.—
“(1) Contents and frequency.—With respect to plan years
beginning on or after the date that is 1 year after the date
of enactment of this section, not less frequently than
quarterly, a health plan service provider shall provide to
the group health or the health insurance issuer offering
individual or group health insurance coverage the following
information at no cost to the plan or issuer:
“(A) The information described in section 2799A-9(a)(1)(B)
(42 U.S.C. 300gg-119(a)(1)(B)).
“(B) Any contractual and subcontractual calculation
methodologies, pricing or fee schedules, or other formulae
used to determine reimbursement amounts to providers and
subcontractors, including methodologies, schedules, fee
structures, and any applied adjustments or modifiers, with
such information provided in a manner sufficiently detailed
to enable the group health plan or issuer to accurately
assess, verify, and ensure compliance with the terms of any
contractual and subcontractual agreement governing the
reimbursement amounts.
“(C) The total amount received or expected to be received
by the health plan service provider or its subcontractors in
provider or supplier rebates, fees, alternative discounts,
and all other remuneration including amounts held in escrow
or variance accounts that has been paid or is to be paid for
claims incurred and administrative services including data
sales or network payments.
“(D) The total amount paid or expected to be paid by the
health plan service provider to its subcontractors in
rebates, fees, contractual arrangements, and all other
remuneration for administrative and other services.
“(E) All payment data, calculation methodologies, and
reconciliation information related to alternative
compensation arrangements, including accountable care
organizations, value-based programs, shared savings programs,
incentive compensation, bundled payments, capitation
arrangements, performance payments, and any other
reimbursement or payment models, where the group health plan
paid fees, incurred obligations, or made payments in
connection with the group health plan or issuer related to
such arrangements.
“(F) Whether, with respect to a provider that files claims
under such plan or coverage, the health plan service
provider—
“(i) has an ownership or investment interest;
“(ii) has a controlling interest;
“(iii) is a management services organization; or
“(iv) is a significant equity investor.
“(G) The name and business address for each person or
entity that, with respect to the health plan service
provider—
“(i) has an ownership or investment interest;
“(ii) has a controlling interest; or
“(iii) is a significant equity investor.
“(2) Manner of providing information or data.—
“(A) In general.—A health plan service provider shall
provide information or data under paragraph (1) in a manner
consistent with the privacy regulations promulgated under
section 13402(a) of the Health Information Technology for
Economic and Clinical Health Act (42 U.S.C. 17932(a)) and
consistent with the privacy regulations promulgated under the
Health Insurance Portability and Accountability Act of 1996
in part 160 and subparts A and E of part 164 of title 45,
Code of Federal Regulations (or successor regulations)
(referred to in this paragraph as the `HIPAA privacy
regulations') and shall restrict the use and disclosure of
such information according to such privacy regulations and
such HIPAA privacy regulations.
“(B) Additional requirements.—In carrying out this
subsection, a health plan service provider shall comply with
section 164.504(f) of title 45, Code of Federal Regulations
(or a successor regulation).
“(C) Rule of construction.—
“(i) In general.—Nothing in this subsection shall be
construed to modify the requirements for the creation,
receipt, maintenance, or transmission of protected health
information under the HIPAA privacy regulations.
“(ii) Civil rights laws.—Nothing in this subsection shall
be construed to affect the application of any Federal or
State privacy or civil rights law, including the HIPAA
privacy regulations, the Genetic Information
Nondiscrimination Act of 2008 (Public Law 110-233) (including
the amendments made by such Act), the Americans with
Disabilities Act of 1990 (42 U.S.C. 12101 et seq.), section
504 of the Rehabilitation Act of 1973 (29 U.S.C. 794),
section 1557 of the Patient Protection and Affordable Care
Act (42 U.S.C. 18116), title VI of the Civil Rights Act of
1964 (42 U.S.C. 2000d), and title VII of the Civil Rights Act
of 1964 (42 U.S.C. 2000e).
“(D) Written notice.—Each plan year, a health plan
service provider shall provide to each participant or
beneficiary written notice informing the participant or
beneficiary of the requirement for health plan service
providers to submit information or data under paragraph (1),
as applicable, which may include incorporating such
notification in plan documents provided to the participant or
beneficiary, or providing individual notification.
“(E) Clarification regarding public disclosure of
information.—Nothing in this subsection shall prevent a
health plan service provider from placing reasonable
restrictions on the public disclosure of the information or
data described in paragraph (1), except that such provider
may not restrict disclosures under subsection (b)(1) to the
Department of Health and Human Services, the Department of
Labor, or the Department of the Treasury.
“(F) Limitation.—This paragraph shall not be construed to
abridge or limit the disclosure requirements under this
subsection or to impose additional privacy or security
requirements on health plan service providers or plan
sponsors.
“(3) Disclosure and redisclosure.—
“(A) In general.—A group health plan or health insurance
issuer offering individual or group coverage receiving
information under paragraph (1) may disclose such information
only—
“(i) to the entity from which the information was received
or to that entity's business associates as defined in section
160.103 of title 45, Code of Federal Regulations (or
successor regulations); or
“(ii) as permitted by the HIPAA Privacy Rule (45 C.F.R.
part 160 and subparts A and E of part 164).
“(B) Availability of information.—To the extent the
information required by this subsection is made available to
the health insurance issuer offering group health insurance
coverage, the health insurance issuer shall make such
information available, at the same time, in the same format,
and at no cost, to the group health plan.
“(C) Limitation on use of information.—A group health
plan or health insurance issuer (and any business associate
or other entity acting on behalf of such plan) may use
information or data under this paragraph only for purposes of
plan administration and may not sell, license, or otherwise
commercially exploit such information or data or provide such
information or data to any third party that may take such
action.
“(D) Rule of construction.—Nothing in this section shall
be construed to prevent a group health plan, a health
insurance issuer, or a health plan service provider providing
services with respect to such a plan, from placing reasonable
restrictions on the public disclosure of the information
described in paragraph (1), except that such plan or entity
may not restrict disclosure of such information to the
Department of Health and Human Services, the Department of
Labor, the Department of the Treasury, or the Comptroller
General of the United States.
“(E) Failure to provide.—The obligation to provide
information pursuant to this subsection shall exist
notwithstanding the presence of any formal data-sharing
agreement between the parties. Failure to provide the
required information as specified shall constitute a
violation of this Act and the Secretary shall initiate
enforcement action under section 2723(b) (42 U.S.C. 300gg-
22(b)) within 90 days of becoming aware of a violation of
this section, except that nothing in this section shall be
construed to limit the Secretary's existing authority under
this Act.
“(4) Data format standards.—All data and information
provided pursuant to this subsection shall comply with the
following standards:
“(A) All claims from a healthcare provider shall be made
to the group health plan in accordance with standards adopted
under HIPAA as described in subpart K of part 162 of title
45, Code of Federal Regulations, as follows:
“(i) Institutional, professional, and dental claims and
adjustments to these claims shall be provided to the group
health plan or health insurance issuer in the ASC X12N 837
format.
“(ii) Prescription drug claims shall be in the National
Council for Prescription Drug Programs (NCPDP) format.
“(iii) The files shall be unmodified copies of the files
sent from the provider. In the event that paper claims are
sent by the provider, they shall be converted to the
appropriate standard electronic format. Such data shall be
provided at no cost to the group health plan.
“(B) All claim payment (or EFT, electronic funds transfer)
and electronic remittance advice (ERA) information sent by a
health plan service provider shall be provided to the group
health plan or health insurance issuer in the ASC X12N 835
format, in accordance with standards and operating rules
adopted under HIPAA at subpart P of part 162 of title 45,
Code of Federal Regulations, unmodified from the form in
which it was transmitted to the healthcare provider. Such
information shall be provided at no cost to the group health
plan.
“(C) The Secretary may modify the standards set forth in
this paragraph as necessary to align with any changes adopted
by the Secretary pursuant to the authority provided under
section 1173 of the Social Security Act ( 42 U.S.C. 1320d-2).
“(5) Opt-in for health insurance coverage.—In the case of
a health insurance issuer offering coverage in the individual
or group market, such issuer may, on an annual basis, for
plan years beginning on or after the effective date of this
section, elect to require a health plan service provider to
submit to such issuer a report that includes all of the
information described in paragraph (1).
“(c) Prohibited Contractual Provisions.—Any provision in
an agreement that unduly delays or limits a group health plan
or issuer's access to information described in this section
or that restricts the format or timing of the provision of
such information in a manner that is inconsistent with the
requirements of this section shall be prohibited and, if a
group health plan or issuer enters into such agreement, shall
be deemed void as against public policy.
“(d) Regulations.—The Secretary shall implement this
section through notice and comment rulemaking in accordance
with section 553 of title 5, United States Code.”.
(b) Penalty.—Section 2723(b) of the Public Health Service
Act (42 U.S.C. 300gg-22(b)) is amended by adding at the end
the following:
“(4) Enforcement authority relating to health plan service
providers.—Notwithstanding any provisions to the contrary,
the Secretary may assess a penalty against a health plan
service provider, as defined in section 2799A-12(a) (42
U.S.C. 300gg-121(a)), of $100,000 per day for each violation
of such section, pursuant to substantially similar processes
and procedures as those set forth in section 2723(b)(2)(D)
through (G) (42 U.S.C. 300gg-121(b)(2)(D) through (G)).”.
(c) ERISA Amendments.—
(1) In general.—Section 502(c) of the Employee Retirement
Income Security Act of 1974 (29 U.S.C. 1132(c)) is amended by
adding at the end the following new paragraph:
“(14) The Secretary may assess a civil penalty against any
person of $100,000 per day for each violation by any person
of section 727.”.
(2) Technical amendment.—Paragraph (6) of section 502(a)
of the Employee Retirement Income Security Act of 1974 (29
U.S.C. 1132(a)) is amended by striking “or (9)” and
inserting “(9), (13), or (14)”.
SEC. _09. STATE PREEMPTION ONLY IN EVENT OF CONFLICT.
The provisions of section 2718A of the Public Health
Service Act (as added and amended by this title) shall not be
construed to supersede any provision of State law which
establishes, implements, or continues in effect any
requirement or prohibition related to health care price
transparency, including for hospitals, clinical diagnostic
laboratories, provider of specified imaging services, and
ambulatory surgical centers (as such terms are defined in
section 2718A(a) of the Public Health Service Act), except to
the extent that such requirement or prohibition prevents the
application of a requirement or prohibition of such sections
(or such amendments). Nothing in this section shall be
construed to affect group health plans established under the
Employee Retirement Income Security Act of 1974, or alter the
application of section 514 of such Act (29 U.S.C. 1144).
SEC. _10. REQUIREMENT FOR EXPLANATION OF BENEFITS.
(a) Advanced Explanation of Benefits.—Section 2799A-1(f)
of the Public Health Service Act (42 U.S.C. 300gg-111(f)) is
amended—
(1) in paragraph (1)—
(A) by striking subparagraph (C) and inserting the
following:
“(C) A good faith estimate of the amount the plan or
coverage is responsible for paying for items and services
included in the estimate described in subparagraph (B),
including a plain language description of each item or
service and all applicable billing codes for each item or
service, including modifiers, using standard and commonly
recognized billing code sets that are clearly identified.”;
and
(B) by adding at the end the following
“(I) A notification that the recipient may be held
harmless, in certain circumstances, if the information in the
advanced explanation of benefits does not match the amount
the recipient is billed.”; and
(2) by adding at the end the following
“(3) Hold harmless.—
“(A) In general.—For plan years beginning on or after the
date that is 1 year after the date on which the Secretary
implements this section, a participant, beneficiary, or
enrollee shall be held harmless for any amount that is
substantially in excess (as defined by the Secretary in a
manner consistent with the process described in section
2799B-7) of the estimate generated by the advanced
explanation of benefits.
“(B) No patient responsibility for excess charges.—A
group health plan or a health insurance issuer in the group
or individual market shall not hold a participant,
beneficiary, or enrollee responsible for excess charges
described in this paragraph if such excess is the result of
coverage or payment determinations that differ from
projections made in the advanced explanation of benefits at
the time such explanation was generated.
“(C) Substantial excess.—A participant, beneficiary, or
enrollee shall not be held harmless for excess amounts if
such amounts reflect the cost of medically necessary items or
services furnished based on unforeseen circumstances that
could not have reasonably been anticipated by the provider or
facility at the time the good faith estimate was generated or
by the plan or issuer at the time the advanced explanation of
benefits was generated.”.
(b) Good Faith Estimates.—Section 2799B-6 of the Public
Health Service Act (42 U.S.C. 300gg-136) is amended—
(1) by striking “Each health care” and inserting the
following:
“(a) In General.—Each health care”; and
(2) by adding at the end the following:
“(b) Hold Harmless.—
“(1) In general.—For plan years beginning on or after the
date that is 1 year after the date on which the Secretary
implements section 2799A-1(f), if an individual enrolled in a
group health plan or health insurance coverage (and seeks to
have a claim for an item or service submitted to such plan or
coverage) is responsible for any amount that is substantially
in excess (as defined by the Secretary in a manner consistent
the process described in section 2799B-7) of the estimate
generated in the advanced explanation of benefits described
in section 2799A-1(f) because the final charges for items and
services were substantially in excess of the good faith
estimate provided to the plan or coverage under this section,
a provider shall not bill the patient for amounts
substantially in excess of the advanced explanation of
benefits.
“(2) Substantial excess.—An individual seeking to have a
claim for an item or service covered by a group health plan
or health insurance coverage shall not be held harmless for
excess amounts if such amounts reflect the cost of medically
necessary items or services furnished based on unforeseen
circumstances that could not have reasonably been anticipated
by the provider or facility at the time the good faith
estimate was generated or by the plan or issuer at the time
the advanced explanation of benefits was generated.”.
(c) Explanation of Benefits.—Section 2799A-1 of the Public
Health Service Act (42 U.S.C. 300gg-111) is amended by adding
at the end the following:
“(g) Explanation of Benefits.—
“(1) In general.—For plan years beginning on January 1 of
the year that begins on or after the date that is 1 year
after the date of enactment of the Patients Deserve Price
Tags Act, each group health plan, or a health insurance
issuer offering group or individual health insurance coverage
shall, within 45 days of receiving the information necessary
to decide a claim for payment (as defined by the Secretary)
for an item or service under the plan or coverage for which
liability under the plan or coverage has been determined,
provide to the participant, beneficiary, or enrollee (through
mail or electronic means, as requested by the participant,
beneficiary, or enrollee) a notification (in clear and
understandable language and utilizing substantially the same
format as the advanced explanation of benefits required by
subsection (f) to enable comparison when an advanced
explanation of benefits is provided) including the following:
“(A) Whether or not the provider or facility is a
participating provider or a participating facility with
respect to the plan or
coverage with respect to the furnishing of such item or
service.
“(B) An itemized explanation of benefits that includes the
following:
“(i) A plain language description of each item or service.
“(ii) All applicable billing codes for each item or
service, including modifiers, using standard and commonly
recognized billing code sets that are clearly identified.
“(iii) The amount the plan or coverage is responsible for
paying for each item or service.
“(iv) The amount of any cost-sharing for which the
participant, beneficiary, or enrollee is responsible for each
item or service (as of the date of such notification).
“(v) The amount that the participant, beneficiary, or
enrollee has incurred toward meeting the limit of the
financial responsibility (including with respect to
deductibles and out-of-pocket maximums) under the plan or
coverage (as of the date of such notification).
“(vi) The type of site of each item or service, including
office, facility, or emergency room.
“(vii) If applicable, a description of any discrepancies
that exist between the services outlined in a patient's
advanced explanation of benefits and the explanation of
benefits.
“(viii) The amount of any facility fee or other patient
charges that were added to the final payment amount, together
with a plain language explanation of the fee, if applicable.
“(C) If the provider or facility is a participating
provider or facility with respect to the plan or coverage
with respect to the furnishing of such item or service, the
contracted rate under such plan or coverage for such item or
service.
“(D) The charges submitted by the provider or facility for
each item or service.
“(E) Information pertaining to plan type, as defined the
Secretary.
“(2) Format.—If applicable, the notification described in
paragraph (1) may be provided in conjunction with, or as part
of, a notice of a claim determination or other communication
required by section 2719(a) (42 U.S.C. 300gg-19(a)), or
regulations thereunder.
“(h) Regulations.—The Secretary shall implement this
section through notice and comment rulemaking in accordance
with section 553 of title 5, United States Code.”.
SEC. _11. TRANSPARENCY IN BILLING.
(a) In General.—Part E of title XXVII of the Public Health
Service Act (42 U.S.C. 300gg-131 et seq.) is amended by
adding at the end the following:
“SEC. 2799B-10. PATIENT ACCESS TO COMPLETE BILLING
INFORMATION.
“(a) Requirements.—
“(1) Notice of right of access to itemized bills; in
general.—A health care provider or health care facility that
requests payment from an individual for providing a health
care item or service to the patient shall include with such
request a written notice of the individual's right to request
an itemized bill as part of the individual's designated
record set under section 164,524 of title 45, Code of Federal
Regulations (or a successor regulation).
“(2) Required information.—A notice under paragraph (1)
shall provide—
“(A) a phone number and internet website where an
individual can make a request for access to their itemized
bill;
“(B) information about the availability of language-
assistance services for individuals with limited English
proficiency (LEP); and
“(C) information about the health care provider's or
health care facility's charity care policies and instructions
on how to apply for charity care.
“(3) Collections actions.—
“(A) In general.—A health care provider or health care
facility shall not bill or take any collections actions
against an individual—
“(i) for any provided health care item or service unless
the health care provider or health care facility has complied
with paragraph (1) or section 13405(e)(4) of the HITECH Act;
or
“(ii) with respect to any items or services for which the
amount appearing on an itemized bill described above in
paragraph (1) exceeds the amount disclosed pursuant to
Federal health care price transparency regulations, including
part 180 of title 45, Code of Federal Regulations, or
provided in a good faith estimate that complies with section
2799B-6 of this Act and section 149.610 of title 45, Code of
Federal Regulations, or another good faith estimate provided
by a health care entity covered under this section but not
otherwise covered under such section 2799B-6, unless the
provider or facility documents that the additional items or
services were medically necessary due to unforeseen
complications or a patient-initiated change, and could not
reasonably have been anticipated.
“(B) Provider requirement.—If a provider fails to provide
a documentation as required under subparagraph (A)(ii) in the
case of items or services, the good faith estimate described
in such subparagraph with respect to such items or services
shall be binding.
“(b) Failure To Comply.—
“(1) Penalties.—The Secretary shall impose penalties on
any health care provider or health care facility that fails
to comply with the requirements of this section in an amount
not to exceed $10,000 for each instance of failure to comply.
“(2) Presumption in favor of individual.—If a health care
provider or health care facility fails to comply with the
requirements of this section, the presumption shall be that
charges were substantially in excess of the good faith
estimate, as set forth in section 2799B-6, for the purpose of
any patient-provider dispute, including in accordance with
section 2799B-7 and regulations promulgated thereunder.
“(c) Regulations.—The Secretary shall implement this
section through notice and comment rulemaking in accordance
with section 553 of title 5, United States Code.”.
(b) Standards for Accessing Itemized Bills.—Section
13405(e) of the HITECH Act (42 U.S.C. 17935(e)) is amended—
(1) in paragraph (2), by striking “and” at the end;
(2) in paragraph (3), by striking the period and inserting
“; and”; and
(3) by adding at the end, the following:
“(4) if the individual makes a request only for an
itemized copy of a bill for services provided, the covered
entity or business associate shall—
“(A) make such protected health information available
within 30 days of such request;
“(B) not impose any fee for providing such individual a
copy of their information; and
“(C) include in such itemized bill, a plain language
description of each distinct health care item or service, all
applicable billing codes for each distinct item or service,
including modifiers, using standard and commonly recognized
billing code sets, the price and billed amount, if different,
of each distinct item or service.”.
SEC. _12. TECHNICAL AMENDMENTS.
(a) ERISA.—Section 715(a)(1) of the Employee Retirement
Income Security Act of 1974 (29 U.S.C. 1185d(a)(1)) is
amended by inserting “and parts D and E of the Public Health
Service Act (as amended by the Patients Deserve Price Tags
Act)” after “Affordable Care Act)”.
(b) Internal Revenue Code.—Section 9815(a)(1) of the
Internal Revenue Code of 1986 is amended by inserting “and
parts D and E of the Public Health Service Act (as amended by
the Patients Deserve Price Tags Act)” after “Affordable
Care Act)”.
SEC. _13. IMPLEMENTATION AND ENFORCEMENT FUNDING.
(a) Appropriation for Secretary of Labor.—There are
authorized to be appropriated, such sums as may be necessary
for fiscal year 2026, and each subsequent fiscal year, to
enable the Secretary of Labor to carry out this title and the
amendments made by this title, including enforcement
activities.
(b) Appropriation for the Secretary of Health and Human
Services.—There are authorized to be appropriated, such sums
as may be necessary for fiscal year 2026, and each subsequent
fiscal year, to enable the Secretary of Health and Human
Services to carry out the amendments made by this title,
including implementation and enforcement activities.
SA 6907. Mr. MARSHALL (for himself, Mr. Durbin, and Mr. Welch) submitted an amendment intended to be proposed by him to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place, insert the following:
SEC. . COMPETITION IN CREDIT CARD TRANSACTIONS.
(a) Short Title.—This section may be cited as the “Credit
Card Competition Act of 2026”.
(b) Amendments to Electronic Fund Transfer Act.—Section
921 of the Electronic Fund Transfer Act (15 U.S.C. 1693o-2)
is amended—
(1) in subsection (b)—
(A) by redesignating paragraphs (2), (3), and (4) as
paragraphs (3), (4), and (5), respectively; and
(B) by inserting after paragraph (1) the following:
“(2) Competition in credit card transactions.—
“(A) No exclusive network.—
“(i) In general.—Not later than 1 year after the date of
enactment of the Credit Card Competition Act of 2026, the
Board shall prescribe regulations providing that a covered
card issuer or payment card network shall not directly or
through any agent, processor, or licensed member of a payment
card network, by contract, requirement, condition, penalty,
technological specification, or otherwise, restrict, on any
credit card issued by a covered card issuer, the number of
payment card networks on which an electronic credit
transaction may be processed to—
“(I) 1 such network;
“(II) 2 or more such networks, if—
“(aa) each such network is owned, controlled, or otherwise
operated by—
“(AA) affiliated persons; or
“(BB) networks affiliated with such issuer; or
“(bb) any such network is identified on the list
established and updated under subparagraph (D); or
“(III) subject to clause (ii), the 2 such networks that
hold the 2 largest market shares with respect to the number
of credit cards issued in the United States by licensed
members of such networks (and enabled to be
processed through such networks), as determined by the Board
on the date on which the Board prescribes the regulations.
“(ii) Determinations by board.—
“(I) In general.—The Board, not later than 3 years after
the date on which the regulations prescribed under clause (i)
take effect, and not less frequently than once every 3 years
thereafter, shall determine whether the 2 networks identified
under clause (i)(III) have changed, as compared with the most
recent such determination by the Board.
“(II) Effect of determination.—If the Board, under
subclause (I), determines that the 2 networks described in
clause (i)(III) have changed (as compared with the most
recent such determination by the Board), clause (i)(III)
shall no longer have any force or effect.
“(B) No routing restrictions.—Not later than 1 year after
the date of enactment of the Credit Card Competition Act of
2026, the Board shall prescribe regulations providing that a
covered card issuer or payment card network shall not—
“(i) directly or through any agent, processor, or licensed
member of the network, by contract, requirement, condition,
penalty, or otherwise—
“(I) inhibit the ability of any person who accepts credit
cards for payments to direct the routing of electronic credit
transactions for processing over any payment card network
that—
“(aa) may process such transactions; and
“(bb) is not on the list established and updated by the
Board under subparagraph (D);
“(II) require any person who accepts credit cards for
payments to exclusively use, for transactions associated with
a particular credit card, an authentication, tokenization, or
other security technology that cannot be used by all of the
payment card networks that may process electronic credit
transactions for that particular credit card; or
“(III) inhibit the ability of another payment card network
to handle or process electronic credit transactions using an
authentication, tokenization, or other security technology
for the processing of those electronic credit transactions;
or
“(ii) impose any penalty or disadvantage, financial or
otherwise, on any person for—
“(I) choosing to direct the routing of an electronic
credit transaction over any payment card network on which the
electronic credit transaction may be processed; or
“(II) failing to ensure that a certain number, or
aggregate dollar amount, of electronic credit transactions
are handled by a particular payment card network.
“(C) Applicability.—The regulations prescribed under
subparagraphs (A) and (B) shall not apply to a credit card
issued in a 3-party payment system model.
“(D) Designation of national security risks.—
“(i) In general.—Not later than 1 year after the date of
enactment of the Credit Card Competition Act of 2026, the
Board, in consultation with the Secretary of the Treasury,
shall prescribe regulations to establish a public list of any
payment card network—
“(I) the processing of electronic credit transactions by
which is determined by the Board to pose a risk to the
national security of the United States; or
“(II) that is owned, operated, or sponsored by a foreign
state entity.
“(ii) Updating of list.—Not less frequently than once
every 2 years after the date on which the Board establishes
the public list required under clause (i), the Board, in
consultation with the Secretary of the Treasury, shall update
that list.
“(E) Definitions.—In this paragraph—
“(i) the terms `card issuer' and `creditor' have the
meanings given the terms in section 103 of the Truth in
Lending Act (15 U.S.C. 1602);
“(ii) the term `covered card issuer' means a card issuer
that, together with the affiliates of the card issuer, has
assets of more than $100,000,000,000;
“(iii) the term `credit card issued in a 3-party payment
system model' means a credit card issued by a card issuer
that is—
“(I) the payment card network with respect to the credit
card; or
“(II) under common ownership with the payment card network
with respect to the credit card;
“(iv) the term `electronic credit transaction'—
“(I) means a transaction in which a person uses a credit
card; and
“(II) includes a transaction in which a person does not
physically present a credit card for payment, including a
transaction involving the entry of credit card information
onto, or use of credit card information in conjunction with,
a website interface or a mobile telephone application; and
“(v) the term `licensed member' includes, with respect to
a payment card network—
“(I) a creditor or card issuer that is authorized to issue
credit cards bearing any logo of the payment card network;
and
“(II) any person, including any financial institution and
any person that may be referred to as an `acquirer', that is
authorized to—
“(aa) screen and accept any person into any program under
which that person may accept, for payment for goods or
services, a credit card bearing any logo of the payment card
network;
“(bb) process transactions on behalf of any person who
accepts credit cards for payments; and
“(cc) complete financial settlement of any transaction on
behalf of a person who accepts credit cards for payments.”;
and
(2) in subsection (d)(1), by inserting “, except that the
Bureau shall not have authority to enforce the requirements
of this section or any regulations prescribed by the Board
under this section” after “section 918”.
(c) Effective Date.—Each set of regulations prescribed by
the Board of Governors of the Federal Reserve System under
paragraph (2) of section 921(b) of the Electronic Fund
Transfer Act (15 U.S.C. 1693o-2(b)), as amended by subsection
(b) of this section, shall take effect on the date that is
180 days after the date on which the Board prescribes the
final version of that set of regulations.
SA 6908. Mr. HAGERTY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 249, strike lines 5 through 17 and insert the
following:
“(1) ERCOT and tva.—This section shall not apply within—
“(A) the area referred to in section 212(k)(2)(A); or
“(B) the area described in section 15d(a) of the Tennessee
Valley Authority Act of 1933 (16 U.S.C. 831n-4(a)).
“(2) Other utilities.—
“(A) In general.—For the purposes of this section, the
Commission shall have jurisdiction over all transmitting
utilities, including transmitting utilities described in
section 201(f), but excluding any ERCOT utility (as defined
in section 212(k)(2)(B)), the Tennessee Valley Authority
(within the area described in section 15d(a) of the Tennessee
Valley Authority Act of 1933 (16 U.S.C. 831n-4(a))), and any
exempt transmitting utility (as defined in section 225(a))
that does not voluntarily subject itself to Commission
jurisdiction for the purposes of this section.
Beginning on page 261, strike line 10 and all that follows
through age 262, line 2, and insert the following:
“(B) Exclusions.—The term `transmission planning region'
does not include—
“(i) the Electric Reliability Council of Texas or the
region served by members of the Electric Reliability Council
of Texas; or
“(ii) the Tennessee Valley Authority or the area described
in section 15d(a) of the Tennessee Valley Authority Act of
1933 (16 U.S.C. 831n-4(a)).
“(b) Jurisdiction.—
“(1) ERCOT and tva.—This section shall not apply within—
“(A) the area referred to in section 212(k)(2)(A); or
“(B) the area described in section 15d(a) of the Tennessee
Valley Authority Act of 1933 (16 U.S.C. 831n-4(a)).
“(2) Other utilities.—
“(A) In general.—For the purposes of this section, the
Commission shall have jurisdiction over all transmitting
utilities, including transmitting utilities described in
section 201(f), but excluding any ERCOT utility (as defined
in section 212(k)(2)(B)), the Tennessee Valley Authority
(within the area described in section 15d(a) of the Tennessee
Valley Authority Act of 1933 (16 U.S.C. 831n-4(a))), and any
exempt transmitting utility that does not voluntarily subject
itself to Commission jurisdiction for the purposes of this
section.
SA 6909. Mr. BARRASSO (for Mr. Cornyn (for himself and Mr. Padilla)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place in title I of division B, insert
the following:
SEC. 21__. REAUTHORIZATION.
Section 40101 of the Infrastructure Investment and Jobs Act
(42 U.S.C. 18711) is amended—
(1) in subsection (i)(1), by striking “2026” and
inserting “2031”; and
(2) in subsection (j), by striking “2022 through 2026”
and inserting “2027 through 2031”.
SA 6910. Ms. MURKOWSKI submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
In section 2252, strike subsection (b) and insert the
following:
(b) Identification of Preferred Routes.—
(1) In general.—
(A) Initial identification.—Not later than 2 years after
the date of enactment of this Act, the Secretary and the
Secretary of Energy (referred to in this subsection as the
“Secretaries”), in coordination with relevant Federal
agencies involved in the permitting of offshore generation
facilities and offshore transmission facilities, and in
consultation with the entities described in paragraph (3),
shall identify preferred routes on the outer Continental
Shelf for transmission cables and sub-seabed infrastructure
(where such routes have not yet been identified), including—
(i) between offshore generation facilities; and
(ii) between offshore generation facilities and optimal
points of interconnection with onshore electric grids.
(B) Periodic review.—Not less frequently than once every 3
years after the initial identification of preferred routes in
accordance with subparagraph (A), the Secretaries, in
coordination with relevant Federal agencies involved in the
permitting of offshore generation facilities and offshore
transmission facilities, and in consultation with the
entities described in paragraph (3), shall—
(i) determine whether additional preferred routes are
needed; and
(ii) if applicable, identify any additional preferred
routes.
(2) Considerations.—In identifying preferred routes under
paragraph (1), the Secretaries shall take into account—
(A) existing rights-of-way and existing sub-seabed
infrastructure;
(B) the optimal points of interconnection between offshore
generation facilities and onshore electric grids;
(C) impacts on the marine environment, including critical
habitats or protected areas, marine organisms, including
protected or endangered species, and other ocean users,
including fisheries; and
(D) the best available data on fishing effort, landings
value, and vessel transit, including vessel monitoring system
and vessel trip report data maintained by the National Marine
Fisheries Service.
(3) Consultation.—In identifying preferred routes under
paragraph (1), the Secretaries shall consult with—
(A) each Regional Fishery Management Council established
under section 302 of the Magnuson-Stevens Fishery
Conservation and Management Act (16 U.S.C. 1852) with
authority over a fishery that may be affected by a preferred
route;
(B) the Governor of each State that may be affected by a
preferred route;
(C) each Indian Tribe that may be affected by a preferred
route; and
(D) to the extent practicable, representatives of
commercial, recreational, and subsistence fishing interests
that may be affected by a preferred route.
SA 6911. Mr. PAUL submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place in title II of division A, insert
the following:
SEC. 12__. DEFENSE OF ENVIRONMENT AND PROPERTY.
(a) Navigable Waters.—
(1) In general.—Section 502 of the Federal Water Pollution
Control Act (33 U.S.C. 1362) is amended by striking paragraph
(7) and inserting the following:
“(7) Navigable waters.—
“(A) In general.—The term `navigable waters' means the
waters of the United States, including the territorial seas,
that are—
“(i) navigable-in-fact; or
“(ii) permanent, standing, or continuously flowing bodies
of water that form geographical features commonly known as
streams, oceans, rivers, and lakes that are connected to
waters that are navigable-in-fact.
“(B) Exclusions.—The term `navigable waters' does not
include (including by regulation)—
“(i) waters that—
“(I) do not physically abut waters described in
subparagraph (A); and
“(II) lack a continuous surface water connection to
navigable waters;
“(ii) man-made or natural structures or channels—
“(I) through which water flows intermittently or
ephemerally; or
“(II) that periodically provide drainage for rainfall; or
“(iii) wetlands without a continuous surface connection to
bodies of water that are waters of the United States.”.
(2) Jurisdiction of epa and corps of engineers.—Title V of
the Federal Water Pollution Control Act (33 U.S.C. 1361 et
seq.) is amended—
(A) by redesignating section 520 as section 521; and
(B) by inserting after section 519 the following:
“SEC. 520. JURISDICTION OF THE ADMINISTRATOR AND SECRETARY
OF THE ARMY.
“(a) EPA and Corps Activities.—An activity carried out by
the Administrator or the Corps of Engineers shall not,
without explicit State authorization, impinge upon the
traditional and primary power of States over land and water
use.
“(b) Aggregation; Wetlands.—
“(1) Aggregation.—Aggregation of wetlands or waters not
described in clauses (i) through (iii) of section 502(7)(B)
shall not be used to determine or assert Federal
jurisdiction.
“(2) Wetlands.—Wetlands described in section
502(7)(B)(iii) shall not be considered to be under Federal
jurisdiction.
“(c) Judicial Review.—If a jurisdictional determination
by the Administrator or the Secretary of the Army would
affect the ability of a State or individual property owner to
plan the development and use (including restoration,
preservation, and enhancement) of land and water resources,
the State or individual property owner may obtain expedited
judicial review not later than 30 days after the date on
which the determination is made in a district court of the
United States, of appropriate jurisdiction and venue, that is
located within the State seeking the review.
“(d) Treatment of Ground Water.—Ground water shall—
“(1) be considered to be State water; and
“(2) not be considered in determining or asserting Federal
jurisdiction over isolated or other waters, including
intermittent or ephemeral water bodies.
“(e) Prohibition on Use of Significant Nexus Test.—
“(1) Definition of significant nexus test.—In this
subsection, the term `significant nexus test' means an
analysis to determine whether a water has a significant nexus
(as defined in subsection (c) of section 328.3 of title 33,
Code of Federal Regulations (as in effect on August 29,
2015)) to a water described in paragraphs (1) through (3) of
subsection (a) of that section (as in effect on that date),
or any similar analysis.
“(2) Prohibition.—Notwithstanding any other provision of
law, the Administrator may not use a significant nexus test
to determine Federal jurisdiction over navigable waters and
waters of the United States.”.
(3) Applicability.—Nothing in this subsection or the
amendments made by this subsection affects or alters any
exemption under—
(A) section 402(l) of the Federal Water Pollution Control
Act (33 U.S.C. 1342(l)); or
(B) section 404(f) of the Federal Water Pollution Control
Act (33 U.S.C. 1344(f)).
(b) Applicability of Agency Regulations and Guidance.—
(1) In general.—The following regulations and guidance
shall have no force or effect:
(A) The final rule of the Corps of Engineers entitled
“Final Rule for Regulatory Programs of the Corps of
Engineers” (51 Fed. Reg. 41206 (November 13, 1986)).
(B) The guidance document entitled “Clean Water Act
Jurisdiction Following the U.S. Supreme Court's Decision in
`Rapanos v. United States' & `Carabell v. United States' ”
and dated December 2, 2008 (relating to the definition of
waters under the jurisdiction of the Federal Water Pollution
Control Act (33 U.S.C. 1251 et seq.)).
(C) Any subsequent regulation of or guidance issued by any
Federal agency that defines or interprets the terms
“navigable waters” or “waters of the United States”.
(2) Prohibition.—The Secretary of the Army, acting through
the Chief of Engineers, and the Administrator of the
Environmental Protection Agency shall not promulgate any
rules or issue any guidance that expands or interprets the
definition of navigable waters unless expressly authorized by
Congress.
(c) State Regulation of Water.—Nothing in this section or
the amendments made by this section affects, amends, or
supersedes—
(1) the right of a State to regulate waters in the State;
or
(2) the duty of a landowner to adhere to any State nuisance
laws (including regulations) relating to waters in the State.
(d) Consent for Entry by Federal Representatives.—Section
308 of the Federal Water Pollution Control Act (33 U.S.C.
1318) is amended by striking subsection (a) and inserting the
following:
“(a) In General.—
“(1) Entry by federal agency.—A representative of a
Federal agency shall only enter private property to collect
information about navigable waters if the owner of that
property—
“(A) has consented to the entry in writing;
“(B) is notified regarding the date of the entry; and
“(C) is given access to any data collected from the entry.
“(2) Access.—If a landowner consents to entry under
paragraph (1), the landowner shall have the right to be
present at the time any data collection on the property of
the landowner is carried out.”.
(e) Compensation for Regulatory Taking.—
(1) In general.—If a Federal regulation relating to the
definition of “navigable waters” or “waters of the United
States” diminishes the fair market value or economic
viability of a property, as determined by an independent
appraiser, the Federal agency issuing the regulation shall
pay the affected property owner an amount equal to twice the
value of the loss.
(2) Administration.—Any payment provided under paragraph
(1) shall be made from
the amounts made available to the relevant agency head for
general operations of the Federal agency.
(3) Applicability.—A Federal regulation described in
paragraph (1) shall have no force or effect until the date on
which each landowner with a claim under this subsection
relating to that regulation has been compensated in
accordance with this subsection.
SA 6912. Mr. KIM submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 198, between lines 18 and 19, insert the following:
(d) Disclosures.—Notwithstanding any other provision of
law, a developer of, or applicant for a permit for, a
specific type of covered project shall not be eligible to
receive from the Federal Government, in an action under
subsection (c) or otherwise, any damages relating to a
Federal permitting decision relating to that project unless
the developer or applicant first discloses to the public and,
if applicable, to the court—
(1) the ultimate beneficial owners of the developer or
applicant;
(2) all financial stakeholders in the developer or
applicant;
(3) all third-party payment arrangements relating to,
contingent on, or that may be affected by the outcome of the
permitting decision or any action relating to the permitting
decision, including the payment or receipt of such damages;
and
(4) any known financial interests involving Federal
officials connected to the permitting decision or any action
(including any settlement) relating to the permitting
decision in—
(A) the developer or applicant; or
(B) the outcome of the permitting decision or any action
(including any settlement) relating to the permitting
decision.
SA 6913. Mr. KIM (for himself, Mr. Booker, and Ms. Alsobrooks) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 71 of the amendment, strike line 22 and
all that follows through page 72, line 4, and insert the
following:
“(1) is filed on or after the date of enactment of the
Bipartisan American Affordability and Jobs Act of 2026;
“(2) seeks judicial review under any provision of Federal
law of an authorization based on a claim that an
environmental review failed to be properly conducted pursuant
to the requirements of this Act; and
“(3) is not asserted in an amended pleading in an action
that was originally filed prior to the date of enactment of
the Bipartisan American Affordability and Jobs Act of 2026.
SA 6914. Mr. KIM submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
In section 2107, add at the end the following:
(c) Electric Bill Transparency.—Each electric utility (as
defined in section 3 of the Public Utility Regulatory
Policies Act of 1978 (16 U.S.C. 2602)) shall include on each
incremental bill statement provided to any customer of the
electric utility a clear breakdown of the costs and other
charges included in that statement, which shall separately
identify—
(1) costs attributable to supply;
(2) costs attributable to transmission;
(3) costs attributable to distribution; and
(4) other charges.
SA 6915. Mr. KIM (for himself, Mr. Booker, and Ms. Alsobrooks) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 17 of the amendment, between lines 4 and 5, insert
the following:
“(B) Inclusion.—The term `major Federal action' includes
any proposed agency action that involves retrofitting a
facility or building a facility for detention purposes.
On page 17, line 5 of the amendment, strike “(B)” and
insert “(C)”.
On page 23, line 4 of the amendment, strike “(C)” and
insert “(D)”.
On page 23, line 6 of the amendment, strike “(B)” and
insert “(C)”.
Beginning on page 71 of the amendment, strike line 20 and
all that follows through page 72, line 4, and insert the
following:
“(a) Definition of Claim.—
“(1) In general.—In this section, the term `claim' means
a claim that—
“(A) is filed on or after the date of enactment of the
Bipartisan American Affordability and Jobs Act of 2026; and
“(B) seeks judicial review under any provision of Federal
law of an authorization based on a claim that an
environmental review failed to be properly conducted pursuant
to the requirements of this Act.
“(2) Exclusion.—In this section, the term `claim' does
not include a claim that seeks review of a proposed agency
action that involves retrofitting a facility or building a
facility to be used by the Department of Homeland Security
for immigration detention or immigration processing purposes.
SA 6916. Mr. MERKLEY (for himself, Mr. Markey, Mr. Schiff, Ms. Duckworth, and Mr. Wyden) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place, insert the following:
SEC. __. PROHIBITION TO CARRY OUT CERTAIN PROJECTS.
(a) In General.—Nothing in this Act provides the
authorization of Congress, including the issuance of any
permit or regulatory approval, to carry out any project
described in subsection (b) and no Federal funds or private
donations may be used for such projects absent express
authorization of Congress after the date of enactment of this
Act.
(b) Projects Described.—The projects referred to in
subsection (a) are each project that relates to the
following:
(1) The East Wing Modernization.
(2) The Triumphal Arch at Memorial Circle.
(3) The East Potomac Golf Links.
SA 6917. Mr. MERKLEY (for himself, Mrs. Murray, and Ms. Duckworth) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of title IV of division A, add the following:
SEC. 1404. TERMINATED FEDERAL AWARDS.
(a) Requirement.—No agency or entity may terminate a
Federal award in whole or in part, require a renegotiation or
rescoping of the Federal award, decide not to fund a budget
period of a Federal award, or fail to approve a no cost time
extension on the basis that the Federal award no longer
effectuates the program goals or agency priorities, including
pursuant to section 200.340(a)(4) of title 2, Code of Federal
Regulations.
(b) Reinstatement.—Any Federal award that was terminated
by any agency or entity after September 30, 2024, for no
longer effectuating the program goals or agency priorities,
including pursuant to section 200.340(a)(4) of title 2, Code
of Federal Regulations, shall be reinstated by such agency or
entity under its previous terms and conditions.
SA 6918. Mr. MERKLEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of title IV of division A, add the following:
SEC. 1404. PROHIBITION ON DUTIES AND TARIFF-RATE QUOTAS ON
WIND TURBINES.
(a) In General.—The President may not impose any duty or
tariff-rate quota on any wind turbines, or parts or
components for such turbines, unless—
(1) the President transmits to Congress a request to impose
the duty or quota; and
(2) there is enacted into law a joint resolution of
approval under subsection (b) with respect to the imposition
of the duty or quota.
(b) Joint Resolutions of Approval.—
(1) Joint resolution of approval defined.—In this
subsection, the term “joint resolution of approval” means a
joint resolution the sole matter after the resolving clause
of which is as follows: “That Congress approves the
imposition of the duty or tariff-rate quota with respect to
, request for which was submitted to Congress on
.”, with the first blank space being filled with a
description of the article and the second blank space being
filled with the date the request under subsection (a)(1) was
submitted to Congress.
(2) Introduction.—A joint resolution of approval with
respect to the imposition of a duty or tariff-rate quota may
be introduced in either House of Congress by any Member of
that House during the 45-day period beginning on the date on
which the President submitted a request under subsection
(a)(1) with respect to the duty or quota.
(3) Expedited procedures.—The provisions of subsections
(b) through (f) of section 152 of the Trade Act of 1974 (19
U.S.C. 2192) apply to a joint resolution of approval to the
same extent that such subsections apply to joint resolutions
under such section 152.
(4) Rules of the senate and the house of representatives.—
This subsection is enacted by Congress—
(A) as an exercise of the rulemaking power of the Senate
and the House of Representatives, respectively, and as such
is deemed a part of the rules of each House, respectively,
but applicable only with respect to the procedure to be
followed in that House in the case of a joint resolution of
approval, and supersedes other rules only to the extent that
it is inconsistent with such rules; and
(B) with full recognition of the constitutional right of
either House to change the rules (so far as relating to the
procedure of that House) at any time, in the same manner, and
to the same extent as in the case of any other rule of that
House.
SA 6919. Mr. MERKLEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Strike title IV of division A.
SA 6920. Mr. MERKLEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 170 of the amendment, line 5, strike “an” and
insert “a final and publicly disclosed”.
On page 170 of the amendment, between lines 14 and 15,
insert the following:
(3) Project or action.—The term “project or action”
means an instance of a specific type of covered project under
section 1402(b)(4).
On page 172 of the amendment, line 1, insert “, including
application of new rulemaking,” after “such action”.
On page 181 of the amendment, between lines 7 and 8, insert
the following:
(d) Prohibition on Permit Payoffs.—Notwithstanding any
other provision of law, no funds shall be available to pay
compromise settlements of claims alleging unlawful
termination of a Federal authorization or permit.
On page 188 of the amendment, line 13, insert “, based on
the date a Federal department or agency determines an
application is complete,” after “deadline”.
On page 188 of the amendment, line 17, insert “, if
determined applicable by a Federal department or agency”
before the semicolon.
On page 188 of the amendment, line 20, insert “, if
determined applicable by a Federal department or agency”
before the semicolon.
On page 199 of the amendment, between lines 12 and 13,
insert the following:
(3) Project.—The term “project” means an instance of a
specific type of covered project under section 1402(b)(4).
SA 6921. Mr. MERKLEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 18, line 7, insert “, excluding financial
assistance provided for the construction of a data center”
after “action”.
On page 20, line 25, insert “(excluding lifeline
infrastructure that directly ties to a data center)” after
“20 percent”.
On page 136, between lines 2 and 3, insert the following:
(c) Permits for Dredged or Fill Material.—Notwithstanding
paragraph (3)(B) of section 404(e) of the Federal Water
Pollution Control Act (33 U.S.C. 1344(e)) (as added by
subsection (b)(3)), the Secretary of the Army, acting through
the Chief of Engineers, may only consider a discharge of
dredged or fill material with respect to a data center to be
a minimal adverse environmental effect if the discharge is
into less than \1/2\ acre of navigable waters.
On page 202, between lines 19 and 20, insert the following:
SEC. 1404. DATA CENTER AND ASSOCIATED INFRASTRUCTURE
EXCLUSION.
Sections 1401 through 1403, and section 3(18)(B) of the
National Environmental Policy Act of 1969 (as amended by
section 1102(a)), shall not apply to—
(1) any Federal authorization or permit, lease, or other
Federal approval for a data center or associated
infrastructure; or
(2) any action by a Federal department or agency with
respect to a data center or associated infrastructure.
On page 235, between lines 3 and 4, insert the following:
SEC. 1603. CLEAN AIR ACT REGULATION.
Notwithstanding any other provision of law, a gas turbine
used as a power source for a data center shall be considered
a stationary source under the Clean Air Act (42 U.S.C. 7401
et seq.).
Beginning on page 298, strike line 14 and all that follows
through page 299, line 21, and insert the following:
“(30) Qualifying behind-the-meter distributed energy
system facility; qualifying BTM DES facility.—
“(A) In general.—The term `qualifying behind-the-meter
distributed energy system facility' or `qualifying BTM DES
facility' means a facility that—
“(i) is an energy storage system (including a battery
energy storage system), a fuel cell system, a generator, or
other resource—
“(I) that can produce electricity within 15 minutes; and
“(II) the output of which can be responsive to the signal
of the system operator;
“(ii) is located behind the meter of a retail customer of
a distribution utility (as defined in section 217(a));
“(iii) has a rated capacity of not less than 5 kilowatts
and not more than 5 megawatts; and
“(iv) maintains metering and telemetry capabilities that—
“(I) are sufficient to dispatch the facility, account for
withdrawals from and injections to the grid, and communicate
all relevant operational data from the facility; and
“(II) are not required to include equipment owned or
installed by the distribution utility (as so defined), and
may include the use of device-level equipment, including
inverters.
“(B) Gas generators.—For purposes of subparagraph
(A)(iii), all gas generators located behind the meter of a
single retail customer described in subparagraph (A)(ii)
shall be considered to be a single resource the rated
capacity of which consists of the total aggregated rated
capacity of those generators.
On page 302, strike lines 21 and 22 and insert the
following:
“(D) Restricting a proposed aggregation of qualifying BTM
DES facilities that meets the definition of `qualifying BTM
DES aggregation' in section 3 to any single point of origin
or node on the electric grid, unless the applicable
Transmission Organization demonstrates a specific reliability
problem associated with the proposed configuration of the
aggregation.
“(E) Any other practice otherwise described in subsection
(b).
On page 311, strike line 10 and insert the following:
“(2) Aggregations.—A distribution utility may not
restrict a proposed aggregation of qualifying BTM DES
facilities that meets the definition of `qualifying BTM DES
aggregation' in section 3 to any single point of origin or
node on the electric grid, unless the distribution utility
demonstrates a specific reliability problem associated with
the proposed configuration of the aggregation.
“(3) Savings provision.—Nothing in this sub-
SA 6922. Mr. MERKLEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of title IV of division A, add the following:
SEC. 1404. PREVENTION OF EXECUTIVE ACTIONS AND REPEAL OF
EXECUTIVE DOCUMENTS.
(a) Prevention and Repeal.—
(1) In general.—Effective beginning on the date of
enactment of this Act—
(A) the Secretary of Commerce shall discontinue the
investigation into imports of wind turbines and their parts
and components initiated under section 232 of the Trade
Expansion Act of 1962 (19 U.S.C. 1862), as described in the
notice of the Bureau of Industry and Security entitled
“Notice of Request for Public Comments on Section 232
National Security Investigation of Imports of Wind Turbines
and Their Parts and Components” (90 Fed. Reg 41380 (August
25, 2025));
(B) notwithstanding any other provision of law, the
Secretary of Health and Human Services shall not take any
action that hinders any wind, solar, or geothermal
development; and
(C) the Executive documents described in paragraph (2)
(referred to in this subsection as the “Executive
documents”) shall have no force or effect and no Federal
funds may be used to implement, administer, enforce, or carry
out the Executive documents.
(2) Executive documents described.—The Executive documents
referred to in paragraph (1)(C) are the following:
(A) Executive Order 14315 (90 Fed. Reg. 30821; relating to
ending market distorting subsidies for unreliable, foreign-
controlled energy sources).
(B) The Presidential memorandum entitled “Temporary
Withdrawal of All Areas on the Outer Continental Shelf from
Offshore Wind Leasing and Review of the Federal Government's
Leasing and Permitting Practices for Wind Projects” issued
on January 20, 2025 (90 Fed. Reg. 8363).
(C) Secretarial Order 3417, issued by the Secretary of the
Interior on February 3, 2025 (relating to addressing the
national energy emergency).
(D) Secretarial Order 3418, issued by the Secretary of the
Interior on February 3, 2025 (relating to unleashing American
energy).
(E) Secretarial Order 3437, issued by the Secretary of the
Interior on July 29, 2025 (relating to ending preferential
treatment for unreliable, foreign-controlled energy sources
in Department decision making).
(F) Secretarial Order 3438, issued by the Secretary of the
Interior on August 1, 2025 (relating to managing Federal
energy resources and protecting the environment).
(G) The memorandum of the Secretary of the Interior issued
on July 15, 2025, entitled “Departmental Review Procedures
for Decisions, Actions, Consultations, and Other Undertakings
Related to Wind and Solar Energy Facilities”.
(H) The memorandum of the Secretary of Agriculture issued
on August 21, 2025, numbered 1078-016 and entitled
“Efficiency Screening Criteria for Proposals Concerning
Power Generation on National Forest System Lands”.
(I) Internal Revenue Service Notice 2025-42 (relating to
beginning of construction requirements for purposes of the
termination of clean electricity production credits and clean
electricity investment credits for applicable wind and solar
facilities).
(J) The guidance of the Assistant Secretary of the Army for
Civil Works, described in the news release published on the
website of the Corps of Engineers on September 22, 2025,
entitled “Army Corps of Engineers begins implementing policy
to increase America's energy generation efficiency”.
(3) Substantially similar documents.—The President or the
head of the applicable Federal department or agency may not
reissue an Executive document in substantially the same form,
and a new order, memorandum, notice, or guidance document
that is substantially the same as an Executive document may
not be issued, unless the order, memorandum, notice, or
guidance document is specifically authorized by an Act of
Congress enacted after the date of enactment of this Act.
(4) Required action by secretary of defense.—Not later
than 30 days after the date of enactment of this Act, the
Secretary of Defense shall approve and sign any mitigation
agreement relating to a wind energy facility, solar energy
facility, transmission line, or distribution line that was
initiated before January 1, 2026.
(b) IPaC Portal.—Notwithstanding any other provision of
law, the Director of the United States Fish and Wildlife
Service shall not prohibit any person requesting a permit for
a wind, solar, geothermal, or storage project from using the
Information for Planning and Consultation Portal (commonly
known as the “IPaC Portal”) of the United States Fish and
Wildlife Service to process the project.
(c) Financial Assistance.—
(1) Definition of continuation application.—In this
subsection, the term “continuation application” means an
application to secure continuing distribution of a Federal
financial assistance award that was designated to be
distributed over multiple fiscal years.
(2) Continuation application.—
(A) In general.—Not later than 60 days after the date on
which a continuation application is submitted by an
applicant, the head of the applicable Federal department or
agency shall—
(i) grant or deny that continuation application; and
(ii) notify the applicant of the determination made under
clause (i).
(B) Continuation application.—A continuation application
submitted under subparagraph (A) shall be in such form and
contain such information as the head of the applicable
Federal department or agency may require.
(C) Terms and conditions.—A continuation application
granted under subparagraph (A) shall contain the same terms
and conditions as the original application, as applicable.
(D) Deadline.—A continuation application that is not
responded to by the deadline required under subparagraph (A)
shall be considered granted.
(d) Rescission Limitation.—No amounts may be rescinded
from amounts provided under any appropriation Act (as defined
in section 3 of the Congressional Budget and Impoundment
Control Act of 1974 (2 U.S.C. 622)) for fiscal years 2026 or
2027, unless the rescission is made through an appropriation
Act.
SA 6923. Mr. BENNET (for Mr. Lujan (for himself and Mr. Bennet)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 170, line 13, insert “but excluding a lease,”
after “necessary,”.
On page 182, line 7, insert “but excluding a lease,”
after “necessary,”.
SA 6924. Mr. BENNET (for Mr. Lujan (for himself and Mr. Bennet)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 460, line 23, insert “before establishing the area
of potential effects, identifying any historic properties, or
determining any adverse effects under clause (i),” after
“subparagraph (A)(i),”.
SA 6925. Mr. BENNET (for Mr. Lujan (for himself and Mr. Bennet)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 490, strike line 22 and all that follows
through page 491, line 6, and insert the following:
of this subsection that is brought by a party described in
subparagraph (A).”.
SA 6926. Mr. BENNET (for Mr. Lujan (for himself and Mr. Bennet)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 456, strike lines 1 through 6 and insert the
following:
“(i) any visual, atmospheric, or audible element, unless
the visual, atmospheric, or audible element would have—
“(I) a direct impact on a historic property that would
significantly diminish the eligible characteristics of the
historic property; or
“(II) an indirect impact on a historic property identified
by an Indian tribe under subsection (c)(2)(B)(ii);
SA 6927. Mr. BENNET (for Mr. Lujan (for himself and Mr. Bennet)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 466, strike line 1 and all that follows
through page 468, line 25, and insert the following:
“(BB) document any adverse effects of the undertaking, or
determine that the proposed project, activity, or program is
an undertaking for which there are no adverse effects of the
undertaking; and
“(CC) identify prudent and feasible measures within the
area of potential effects to avoid, minimize, or mitigate any
adverse effects of the undertaking; and
“(dd) shall not identify measures described in item
(cc)(CC) that are not prudent or
would occur outside the area of potential effects, unless the
project, activity, or program applicant has submitted a
written request for alternative mitigation measures.
“(3) Determination.—
“(A) In general.—Not later than 90 days after the date of
submission of a report under paragraph (2)(B)(iii)(I), unless
a shorter timeline is agreed to by the State Historic
Preservation Officer or Tribal Historic Preservation Officer
and each applicable Indian tribe, Native Hawaiian
organization, and local government, the applicable Federal
official, in consultation with the applicable State Historic
Preservation Officer and Tribal Historic Preservation
Officer, Indian tribe, Native Hawaiian organization, and
local government under this division, shall—
“(i) determine, based on the report, that—
“(I)(aa) historic properties are not present; and
“(bb) the obligations of the applicable Federal official
under this section shall be satisfied;
“(II)(aa) the adverse effects of the undertaking would not
so diminish the integrity of the historic property to the
extent that the historic property would be made ineligible
for listing on the National Register; and
“(bb) the obligations of the Federal official under this
section shall be satisfied; or
“(III)(aa) in the sole discretion of the Federal official,
as otherwise allowed by law, and after incorporating the
information required under paragraph (2)(B)(ii), other
considerations outweigh the consideration of historic
preservation as to any or all adverse effects of the
undertaking; and
SA 6928. Mr. BENNET (for Mr. Lujan (for himself and Mr. Bennet)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Starting on page 374 of the amendment, strike line 16 and
all that follows through page 375, line 13, and insert the
following:
“(B) Plan of operations.—The term `plan of operations'
means a plan of operations that an operator must submit and
the Secretary of the Interior or the Secretary of
Agriculture, as applicable, must approve before an operator
may begin operations, in accordance with, as applicable—
“(i) subpart 3809 of part 3800 of title 43, Code of
Federal Regulations (or successor regulations establishing
application and approval requirements); and
“(ii) part 228 of title 36, Code of Federal Regulations
(or successor regulations establishing application and
approval requirements).
“(C) Public land.—The term `public land' means land owned
by the United States
SA 6929. Mr. BENNET (for Mr. Lujan (for himself and Mr. Bennet)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Starting on page 379 of the amendment, strike line 16 and
all that follows through page 384, line 18, and insert the
following:
(c) Abandoned Hardrock Mine Fund.—
(1) Establishment.—There is established in the Treasury of
the United States a separate account, to be known as the
“Abandoned Hardrock Mine Fund” (referred to in this
subsection as the “Fund”).
(2) Source of deposits.—
(A) In general.—Any amounts collected by the Secretary of
the Interior pursuant to the claim maintenance fee under
section 10101(a)(1) of the Omnibus Budget Reconciliation Act
of 1993 (30 U.S.C. 28f(a)(1)) on mill sites located under
subsection (c) of section 2337 of the Revised Statutes (30
U.S.C. 42) shall be deposited into the Fund.
(B) Hardrock minerals.—Section 6(a) of the Mineral Leasing
Act for Acquired Lands (30 U.S.C. 355(a)) is amended by
adding at the end the following: “Beginning on the date of
enactment of the Bipartisan American Affordability and Jobs
Act of 2026, any receipts derived from leases of hardrock
minerals pursuant to section 3 that would otherwise be paid
into the Treasury shall be deposited into the Abandoned
Hardrock Mine Fund established by section 2215(c) of the
Bipartisan American Affordability and Jobs Act of 2026.”.
(3) Use.—The Secretary of the Interior may make
expenditures from amounts available in the Fund, without
further appropriations or fiscal year limitation, only to
carry out section 40704 of the Infrastructure Investment and
Jobs Act (30 U.S.C. 1245).
(4) Allocation of funds.—Amounts made available under
paragraph (3)—
(A) shall be allocated in accordance with section
40704(e)(1) of the Infrastructure Investment and Jobs Act (30
U.S.C. 1245(e)(1));
(B) may be transferred in accordance with section
40704(e)(2) of that Act (30 U.S.C. 1245(e)(2)); and
(C) may be used for the administration of the Fund and
section 40704 of the Infrastructure Investment and Jobs Act
(30 U.S.C. 1245) in amounts not to exceed 5 percent of
amounts deposited into the Fund.
(d) Clerical Amendments.—Section 10101 of the
SA 6930. Mr. BENNET (for Mr. Lujan (for himself and Mr. Bennet)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 376 of the amendment, line 10, strike “as many”
and insert “not more than 3”.
SA 6931. Mr. BOOKER submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
In section 1401(b)(4), strike subparagraph (F) and insert
the following:
(F) Source of funds.—
(i) In general.—Amounts awarded under subparagraph (D)—
(I) shall be paid from the fund described in section 1304
of title 31, United States Code; and
(II) shall not be subject to the availability of
appropriations.
(ii) Prohibition of use of federal funds.—No Federal
funds, including amounts from the fund described in section
1304 of title 31, United States Code, may be used to pay for
a settlement of a claim brought under this paragraph.
SA 6932. Mr. BOOKER (for himself and Ms. Alsobrooks) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 181 of the amendment, between lines 4 and 5, insert
the following:
(5) Exclusion.—Paragraph (1) does not apply to a Federal
authorization or permit that was issued—
(A) in violation of applicable Federal law in effect at the
time of issuance; or
(B) under emergency procedures.
SA 6933. Mr. VAN HOLLEN (for himself, Ms. Alsobrooks, Mr. Coons, and Ms. Blunt Rochester) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 181 of the amendment, between lines 4 and 5, insert
the following:
(5) Voluntary remand.—
(A) In general.—For a project that has a Federal
authorization or permit on the date of enactment of this Act,
notwithstanding any outstanding authorizations or permits, a
court shall only grant a remand requested by a Federal
department or agency that is pending as of November 11, 2026,
or is substantially similar to a remand request pending on
November 11, 2026, for the same project, if the court finds
that the Federal department or agency has established grounds
for action under subparagraph (B), (C), or (D) of that
paragraph.
(B) Clarification.—An order granting a remand under
subparagraph (A) shall not, by itself, constitute a court
order requiring action under paragraph (1)(A).
SA 6934. Mr. VAN HOLLEN submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages,
received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
In section 2107, add at the end the following:
(c) Curtailment of Computational Loads.—
(1) Definitions.—In this subsection:
(A) Commission.—The term “Commission” means the Federal
Energy Regulatory Commission.
(B) Computational load.—The term “computational load”
means the load of a computational load site.
(C) Computational load operator; computational load owner;
computational load site.—The terms “computational load
operator”, “computational load owner”, and “computational
load site” have the meanings given those terms in subsection
(a)(2).
(D) Independent system operator; regional transmission
organization.—The terms “Independent System Operator” and
“Regional Transmission Organization” have the meanings
given those terms in section 3 of the Federal Power Act (16
U.S.C. 796).
(2) Curtailment.—Not later than 90 days after the date of
enactment of this Act, the Commission shall initiate
investigations under section 206 of the Federal Power Act (16
U.S.C. 824e) to ensure that Regional Transmission
Organizations and Independent System Operators have processes
and procedures in their open access transmission tariffs to
curtail computational loads before reasonably foreseeable
energy or operating reserve shortages trigger shortage or
scarcity pricing under the applicable tariff, and not later
than the commencement of an energy emergency alert level EEA
1 (as defined by the North American Electric Reliability
Corporation) or a higher energy emergency alert level event
applicable to the affected area, if the computational load
has failed to bring sufficient new generation to the grid to
meet its peak demand, plus a reserve margin, to address
reliability and affordability impacts on other grid users.
(3) Resource adequacy procurements.—A Regional
Transmission Organization or Independent System Operator
shall not include a computational load subject to curtailment
under paragraph (2) in any Commission-jurisdictional resource
adequacy procurement, including a capacity market, beyond the
quantity of energy demanded by the computational load that
can be met by new supply brought to the procurement on behalf
of that computational load.
(4) Compensation.—
(A) In general.—The Commission shall determine whether to
compensate, and if so, set the level of compensation for, any
computational load owner or computational load operator for
computational load curtailed under paragraph (2), to ensure
just and reasonable rates.
(B) Limitation.—No compensation provided under
subparagraph (A) may be derived from ratepayers other than
computational load owners and computational load operators.
(5) Application of certain requirements.—Any tariff
approved under this subsection is subject to the requirements
of sections 205 and 206 of the Federal Power Act (16 U.S.C.
824d, 824e) that all rates, charges, terms, and conditions be
just and reasonable and not unduly discriminatory or
preferential.
(6) Requirement.—As soon as practicable, and not later
than 270 days after the date of enactment of this Act, the
Commission shall establish replacement rates, terms, and
conditions that are consistent with the requirements of
paragraphs (2) through (5).
SA 6935. Mr. VAN HOLLEN submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 109, strike line 9 and all that follows
through page 133, line 7, and insert the following:
SEC. 1201. WATER QUALITY CRITERIA.
(a) Public Participation and Peer Review.—Section 304(a)
of the Federal Water Pollution Control Act (33 U.S.C.
1314(a)) is amended by adding at the end the following:
“(10) Public participation and peer review.—
“(A) In general.—In developing or revising any criterion
under paragraph (1) or (9), the Administrator shall—
“(i) publish in the Federal Register a notice of the
availability of the draft criterion and the supporting
scientific and technical documentation;
“(ii) provide a period of not less than 60 days for public
comment on the draft criterion;
“(iii)(I) ensure that the draft criterion has undergone
independent, external scientific peer review; and
“(II) make the charge to the peer reviewers and the
comments of the peer reviewers publicly available; and
“(iv) on finalizing the criterion—
“(I) publish in the Federal Register a notice of
availability of the final criterion; and
“(II) make publicly available a response to significant
comments received under clause (ii).
“(B) State and tribal engagement.—Before publishing a
notice under subparagraph (A)(i), the Administrator shall
provide to States and authorized Indian tribes an opportunity
to review and provide input on the draft criterion.
“(C) Nature of criteria.—A criterion published pursuant
to this subsection—
“(i) shall reflect the latest scientific knowledge, as
described in paragraph (1);
“(ii) is a scientific recommendation for consideration by
States and Indian tribes in adopting water quality standards
under section 303, and is not a regulation or a legally
binding requirement; and
“(iii) is not subject to section 553 of title 5, United
States Code.”.
(b) Judicial Review.—Section 509(b)(1) of the Federal
Water Pollution Control Act (33 U.S.C. 1369(b)(1)) is
amended, in the first sentence—
(1) by striking “402, and (G)” and inserting “402,
(G)”; and
(2) by inserting “and (H) in defining the scope of the
term `waters of the United States' for purposes of this
Act,” after “section 304(l),”.
SEC. 1202. CLEAN WATER ACT PERMITTING AND STATE
CERTIFICATION.
Section 401 of the Federal Water Pollution Control Act (33
U.S.C. 1341) is amended by adding at the end the following:
“(e) Certification Procedures, Requirements, and
Limitations.—
“(1) Effect of certain certification actions.—
“(A) Certification or waiver.—If a certifying authority
grants a certification application or if a certifying
authority waives the certification requirement for a
certification application, the agency with jurisdiction over
the Federal license or permit for which the certification
application was made shall consider water quality
requirements satisfied for the purpose of considering the
application for the Federal license or permit.
“(B) Certification with conditions.—
“(i) In general.—If a certifying authority grants a
certification application with conditions, the agency with
jurisdiction over the Federal license or permit for which the
certification application was made shall consider water
quality requirements satisfied for the purpose of considering
the application for the Federal license or permit, subject to
the conditions included in the certification.
“(ii) Savings clause.—Nothing in this subparagraph
affects paragraph (2)(B).
“(2) Scope of certification.—
“(A) In general.—The scope of a certification provided
under this section shall be limited to ensuring compliance
with water quality requirements.
“(B) Prohibition.—In reviewing a certification
application, no certifying authority may—
“(i) deny certification for any reason other than making a
determination that—
“(I) no modification to or reasonable condition on the
certification would make it possible to grant the
certification without violating water quality requirements;
or
“(II) after the certifying authority has sent the
communication described in clause (v)(II) of paragraph (3)(C)
and given the applicant a reasonable opportunity to provide
the additional materials or information described in that
communication, the application continues to lack the
information required under clause (ii) and, if applicable,
clause (iii) of that paragraph; or
“(ii) grant certification with conditions, except for
conditions that the certifying authority determines are
necessary to ensure compliance with water quality
requirements.
“(C) Savings provision.—Nothing in this paragraph allows
a Federal licensing or permitting agency to refuse to include
conditions from a certifying authority in a Federal license
or permit if the certifying authority determines the
conditions are necessary to ensure compliance with water
quality requirements.
“(3) Required procedures.—
“(A) Notice and hearings.—Taking into account State or
Tribal law, as appropriate, and the review period described
in paragraph (4), each certifying authority shall establish
procedures for—
“(i) public notice in the case of all certification
applications;
“(ii) to the extent the certifying authority determines to
be appropriate, public hearings in connection with specific
certification applications; and
“(iii) a prefiling meeting as described in subparagraph
(B).
“(B) Prefiling meeting.—
“(i) Request.—Before submitting a certification
application, the prospective applicant may request a
prefiling meeting with the certifying authority—
“(I) to ensure that the certifying authority receives
early notification of projects for which a certification
under subsection (a) is necessary; and
“(II) to discuss informational needs with the certifying
authority before submitting the application.
“(ii) Response required.—If a prospective applicant
requests a prefiling meeting with a certifying authority
pursuant to clause (i), the certifying authority shall—
“(I) respond to the request not later than 30 days after
the date on which the request is received; and
“(II) hold the prefiling meeting with the prospective
applicant not later than 60 days
after the date on which the request is received.
“(C) Certification applications.—
“(i) Application in writing.—A certification application
shall be made in writing to the applicable certifying
authority.
“(ii) Requirements for complete application.—A complete
certification application shall consist of the following:
“(I) Identification of each applicant for the Federal
license or permit with respect to which the certification
application is made.
“(II) A statement that information included in the
certification application is truthful, accurate, and
complete, to the best knowledge of each such applicant.
“(III) In the case of a certification application with
respect to an individual permit or license—
“(aa) identification of the Federal license or permit that
is the subject of the certification application with respect
to which the certification is requested;
“(bb) identification of any activity the conduct of which
is subject to the Federal license or permit;
“(cc) identification of the location and nature of any
discharge that may result from the activity, and the location
of the receiving waters;
“(dd) a description of means that may be used to monitor,
control, or manage any such discharge; and
“(ee) a list of all other Federal, interstate, Tribal,
State, or local agency authorizations related to the
requirement for a certification under subsection (a), and any
approval or denial of such an authorization already received.
“(IV) Any additional materials required by the applicable
certifying authority pursuant to clause (iii), subject to the
condition that the additional materials shall only be
required with respect to certification applications submitted
after the date on which the regulation described in that
clause has been promulgated.
“(iii) Additional materials.—
“(I) In general.—A certifying authority may promulgate
regulations establishing materials to be required in
completed certification applications in addition to the
materials described in subclauses (I) through (III) of clause
(ii) that the certifying authority determines are necessary
to demonstrate to the certifying authority compliance with
water quality requirements.
“(II) Effect of failure to promulgate.—Beginning on or
after December 31, 2027, if a certifying authority fails to
promulgate regulations under subclause (I), a certification
application to that certifying authority shall be considered
complete if the certification application includes all of the
items described in subclauses (I) through (III) of clause
(ii).
“(III) Transition.—Prior to December 31, 2027, a
certifying authority may require materials beyond the
materials described in subclauses (I) through (III) of clause
(ii) without promulgating regulations under subclause (I)
through a single written notice applicable to all applicants
submitting certification applications if the certifying
authority determines that those additional materials are
necessary to demonstrate to the certifying authority
compliance with water quality requirements and the additional
materials are those that can be reasonably expected of an
applicant at the time at which a certification application is
submitted.
“(iv) Acknowledgment of receipt.—Not later than 3 days
after the date on which an applicant submits to a certifying
authority a certification application for an individual
Federal license or permit, the certifying authority shall
acknowledge receipt of the certification application in
writing.
“(v) Notification of complete application or
identification of missing materials.—Not later than 90 days
after the date on which a certifying authority acknowledges
receipt of a certification application under clause (iv), the
certifying authority shall—
“(I) provide the applicant a written notification that the
certification application is complete; or
“(II) identify to the applicant in writing all specific
additional materials or information described in clauses (ii)
and, if applicable, (iii) necessary for the certification
application to be considered complete, including, for each
such additional piece of material or information, a
description of the water quality requirement for which the
additional material or information is needed in order to
evaluate compliance with that water quality requirement.
“(vi) Petition to court.—
“(I) Right to petition.—An applicant may petition for
judicial review of an alleged failure by a certifying
authority to act in accordance with clauses (ii) through (v)
by filing a written petition in a court of competent
jurisdiction.
“(II) Considerations.—In reviewing a petition under this
subclause, a reviewing court shall consider—
“(aa) the administrative record, which shall consist of
the materials required to be submitted under clause (ii);
“(bb) any materials or information identified by
certifying authority as missing pursuant to a notification
under clause (v)(II);
“(cc) the information submitted by the applicant to the
certifying authority; and
“(dd) any evidence presented to the court by the applicant
that suggests that the defense of the certifying authority to
the petition is pretextual.
“(III) Court order.—If a court, in reviewing a petition
under this clause, finds that a certifying authority has
failed to act in accordance with any of clauses (ii), (iv),
and (v), the court shall provide injunctive relief, as
appropriate, to give effect to this section.
“(D) Denials of certification for individual license or
permit.—If a certifying authority denies a certification
application for an individual license or permit, the
certifying authority shall provide to the applicant and the
applicable Federal licensing or permitting agency—
“(i) the specific water quality requirements that the
certifying authority determined will be violated if
certification were granted;
“(ii) a statement explaining why the certifying authority
determined the identified water quality requirements will be
violated; and
“(iii) if the denial is due to insufficient information, a
description of the specific water quality data or
information, if any, that would be needed to evaluate whether
granting certification will comply with water quality
requirements.
“(4) Review period.—
“(A) In general.—Subject to subparagraph (D) and in
consultation with each certifying authority, a licensing or
permitting agency shall, categorically or on a case-by-case
basis for each certification application, establish a
reasonable period of time (subject to subparagraph (B) but
not to exceed 1 year from the date of receipt of the
certification application) within which a certifying
authority shall issue a final action on the certification
application, which shall account for time required under
applicable State or Tribal law for public notice and comment
periods, if any.
“(B) Limitation.—If a certifying authority and licensing
or permitting agency are unable to agree to a reasonable
period of time for purposes of subparagraph (A), the
reasonable period of time shall be 180 days from the date of
receipt of the certification application.
“(C) Failure to act.—If a certifying authority fails or
refuses to issue a final action as described in paragraph (6)
on a certification application by the end of the reasonable
period of time established under subparagraph (A) and the
reasonable period of time has not been extended in accordance
with subparagraph (D), the requirement for a certification
under subsection (a) shall be waived, except that the
reasonable period of time shall restart in the event that the
certification application is voluntarily withdrawn by the
applicant and the applicant submits a new certification
application.
“(D) Requirement for extension.—With respect to a
certification application, the reasonable period of time
established under subparagraph (A) may only be extended if—
“(i) the extension is requested, in writing, by the
applicant; and
“(ii) the certifying authority concurs, in writing, with
the extension.
“(5) Waiver of certification requirement.—A certifying
authority may, at any time during the reasonable period of
time described in paragraph (4), affirmatively waive the
requirement for a certification under subsection (a).
“(6) Final action.—Not later than the date on which the
reasonable period of time established under paragraph (4) for
a certification application ends or on the date of a waiver
pursuant to paragraph (5), as applicable, the certifying
authority shall apply only 1 of the following final actions
to the certification application:
“(A) The certification application is granted.
“(B) The certification application is granted with
conditions.
“(C) The certification application is denied.
“(D) The certification requirements under subsection (a)
have been waived in accordance with paragraph (4) or (5) with
respect to the certification application.
“(f) Special Rule for Certain Certifications.—
“(1) Definition of interstate transmission line project.—
In this subsection, the term `interstate transmission line
project' means a project for the construction, modification,
or upgrade of a transmission facility that is part of the
bulk-power system (as defined in section 215(a) of the
Federal Power Act (16 U.S.C. 824o(a))).
“(2) Limitation on certification requirements for certain
interstate linear infrastructure.—Notwithstanding the first
sentence of subsection (a)(1), any applicant for a
certificate of public convenience and necessity for a project
under section 7 of the Natural Gas Act (15 U.S.C. 717f) or a
Federal authorization or permit required to construct,
modify, or operate an interstate transmission line project
that may result in a direct point source discharge into the
waters of the United States shall provide to the Federal
licensing or permitting agency a certification from a
certifying authority that such direct point source discharge
complies with water quality requirements or a waiver pursuant
to this section.
“(3) Certification of no limitation and standard.—In the
case of any direct point source discharge described in this
subsection for which there is not an applicable effluent
limitation or other limitation under sections 301(b) and 302
and for which there is not an applicable standard under
sections 306 and 307, the certifying authority shall so
certify, except that such a certification shall not satisfy
section 511(c).
“(4) Review for compliance.—Notwithstanding subsection
(a)(4)—
“(A) prior to the initial operation of any federally
licensed or permitted facility or activity that may result in
a direct point source discharge into the waters of the United
States and with respect to which a certification has been
obtained pursuant to this subsection, which facility or
activity is not subject to a Federal operating license or
permit, the licensee or permittee shall provide an
opportunity for the certifying authority to review the manner
in which the facility or activity shall be operated or
conducted for the purposes of assuring that applicable
effluent limitations or other limitations or other applicable
water quality requirements will not be violated;
“(B) on notification by the certifying authority that the
operation of any federally licensed or permitted facility or
activity described in subparagraph (A) will violate
applicable effluent limitations or other limitations or other
water quality requirements, the applicable Federal agency
may, after public hearing, suspend the Federal license or
permit; and
“(C) if a Federal license or permit is suspended pursuant
to subparagraph (B), the Federal license or permit shall
remain suspended until notification is received from the
certifying authority that there is reasonable assurance that
the facility or activity will not violate the applicable
provisions of sections 301, 302, 303, 306, and 307.
“(5) Limitation and monitoring requirements of certain
linear infrastructure certifications.—Notwithstanding
subsection (d)—
“(A) any certification provided under this subsection
shall set forth any effluent limitations and other
limitations and monitoring requirements necessary to assure
that any direct point source discharge subject to this
subsection will comply with the applicable provisions of
sections 301, 302, 303, 306, and 307; and
“(B) any limitations and requirements set forth pursuant
to subparagraph (A) shall be imposed by the licensing or
permitting agency as a condition on any Federal license or
permit subject to the provisions of this section.
“(6) Reasonable period of time.—Notwithstanding the
periods of time in subsections (a)(1) and (e)(4), a licensing
or permitting agency shall, categorically or on a case-by-
case basis for each certification application, establish a
reasonable period of time (not to exceed 9 months from the
date of receipt of the certification application) within
which a certifying authority shall issue a final action on
the certification application under this subsection, which
shall account for the time required under applicable State or
Tribal law for public notice and comment periods.
“(g) Definitions.—In this section:
“(1) Certification application.—The term `certification
application' means a request from an applicant for a
certification described in subsection (a).
“(2) Certifying authority.—The term `certifying
authority', with respect to a certification application,
means, as applicable—
“(A) the State or interstate agency to which the
certification application was submitted, including an Indian
Tribe that is treated as a State for purposes of this section
pursuant to section 131.8 of title 40, Code of Federal
Regulations; or
“(B) if no State or interstate agency has the authority to
provide the certification described in subsection (a), the
Administrator.
“(3) Water quality requirements.—The term `water quality
requirements' means—
“(A) the applicable provisions of sections 301, 302, 303,
306, and 307;
“(B) any Federal and State or Tribal laws (including
regulations) that are applicable to discharges into waters of
the United States; and
“(C) State or Tribal laws (including regulations)
applicable to maintaining the chemical, physical, and
biological integrity of State or Tribal waters, as determined
by the certifying authority.”.
SEC. 1203. PERMIT TERM FOR NPDES PERMITS.
Section 402(b)(1)(B) of the Federal Water Pollution Control
Act (33 U.S.C. 1342(b)(1)(B)) is amended by striking “five
years” and inserting “10 years”.
SEC. 1204. PERMITS FOR DREDGED OR FILL MATERIAL.
(a) Reducing Permitting Uncertainty.—
(1) In general.—Section 404(c) of the Federal Water
Pollution Control Act (33 U.S.C. 1344(c)) is amended—
(A) by striking “(c) The Administrator” and inserting the
following:
“(c) Specification or Use of Defined Area.—
“(1) In general.—The Administrator”;
(B) in paragraph (1) (as so designated), by inserting
“during the period described in paragraph (2) and” before
“after notice and opportunity for public hearings”; and
(C) by adding at the end the following:
“(2) Period of prohibition.—The Administrator may act
pursuant to paragraph (1) only during the period that—
“(A) begins on the date on which an applicant submits a
complete application under this section; and
“(B) ends on the date on which the Secretary issues the
permit.”.
(2) Applicability.—The amendments made by paragraph (1)
shall apply to a permit application submitted under section
404 of the Federal Water Pollution Control Act (33 U.S.C.
1344) after the date of enactment of this Act.
(b) Nationwide Permitting Improvement.—Section 404(e) of
the Federal Water Pollution Control Act (33 U.S.C. 1344(e))
is amended—
(1) by striking “(e)(1) In carrying” and inserting the
following:
“(e) General Permits on State, Regional, or Nationwide
Basis.—
“(1) Permits authorized.—In carrying”;
(2) in paragraph (2)—
(A) by striking “(2) No general” and inserting the
following:
“(2) Term.—
“(A) In general.—No general”;
(B) in subparagraph (A) (as so designated), by striking
“five years” and inserting “10 years”; and
(C) by adding at the end the following:
“(B) Timing of modification.—The Secretary may modify a
general permit pursuant to subparagraph (A) during the term
of the general permit or during the renewal of the general
permit.”; and
(3) by adding at the end the following:
“(3) Considerations.—In determining the environmental
effects of an activity under paragraph (1) or (2), the
Secretary shall consider only the effects on compliance with
water quality requirements (as defined in section 401(g)) of
any discharge of dredged or fill material resulting from the
activity.
SA 6936. Mr. PADILLA (for himself, Mr. Gallego, Mr. Markey, Ms. Alsobrooks, Mr. Schiff, and Mr. Kelly) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 172 of the amendment, line 2, insert “, including
the discretionary or nondiscretionary issuance, application,
or enforcement of those laws or regulations” after
“regulation”.
SA 6937. Mr. PADILLA (for Mr. Schiff) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 141 of the amendment, strike line 12 and
all that follows through page 142, line 2, and insert the
following:
“(A) mean all relevant scientific and commercial
information, including traditional Tribal ecological
knowledge, available at the time of the agency action; and
“(B) include data, analyses, conceptual and numerical
models, and model results that—
“(i) account for known or potential sources of error; and
“(ii) are applied—
“(I) using accepted principles, methods, tools, and
professional standards of practice; and
“(II) consistent with the goals and purposes of this
Act.”; and
SA 6938. Mr. PADILLA (for Mr. Schiff) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of section 1401, add the following:
(d) Applicability.—This section does not apply to any
project for which the Federal Government has been found by a
Federal court to have violated applicable law when the
Federal Government provided a Federal authorization or permit
for the project.
SA 6939. Mr. PADILLA (for Mr. Schiff) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of section 1402, add the following:
(d) Applicability.—This section does not apply to any
specific type of covered project
for which the Federal Government has been found by a Federal
court to have violated applicable law when the Federal
Government provided a Federal authorization or permit for the
specific type of covered project.
SA 6940. Mr. PADILLA (for Mr. Schiff) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Strike section 2251 of the amendment and insert the
following:
SEC. 2251. OFFSHORE ENERGY.
(a) Leases, Easements, and Rights-of-way.—Section 8 of the
Outer Continental Shelf Lands Act (43 U.S.C. 1337) is
amended—
(1) in subsection (m)—
(A) by striking “of this Act”;
(B) by striking “(m) All” and inserting the following:
“(m) Disposition of Revenues.—
“(1) In general.—All”; and
(C) by adding at the end the following:
“(2) No refund.—Except as otherwise provided in this Act,
the Secretary may not refund any amounts deposited in the
Treasury at any time under paragraph (1).”; and
(2) in subsection (p)—
(A) in paragraph (4)—
(i) in subparagraph (H), by inserting “, including any
decision of the Secretary regarding such a lease, easement,
or right-of-way” after “subsection”;
(ii) in subparagraph (I), by striking “prevention of
interference with reasonable uses” and inserting
“prevention of unreasonable interference with other uses”;
and
(iii) in subparagraph (J)—
(I) in clause (i), by striking “and” at the end;
(II) in clause (ii), by adding “and” after the semicolon
at the end; and
(III) by adding at the end the following:
“(iii) the interests of affected States in energy
produced, transported, stored, or transmitted as a result of
activities on the outer Continental Shelf;”;
(B) by striking paragraph (7) and inserting the following:
“(7) Coordination and consultation with affected state and
local governments.—The Secretary shall provide for ongoing
coordination and consultation with the Governor of any State
or the executive of any local government that may be affected
by—
“(A) a lease, easement, or right-of-way under this
subsection; or
“(B) any decision of the Secretary regarding such a lease,
easement, or right-of-way.”;
(C) by striking paragraph (10) and inserting the following:
“(10) Applicability.—
“(A) In general.—Except as provided in subparagraph (B),
this subsection does not apply to any area on the outer
Continental Shelf within the exterior boundaries of any unit
of the National Park System, the National Wildlife Refuge
System, the National Marine Sanctuary System, or any National
Monument.
“(B) Exception.—Notwithstanding subparagraph (A), the
Secretary, in consultation with the Secretary of Commerce
under section 304(d) of the National Marine Sanctuaries Act
(16 U.S.C. 1434(d)), may grant rights-of-way on the outer
Continental Shelf within units of the National Marine
Sanctuary System for the transmission of electricity.”; and
(D) by adding at the end the following:
“(11) Duration of permits in marine sanctuaries.—
Notwithstanding section 310(c)(2) of the National Marine
Sanctuaries Act (16 U.S.C. 1441(c)(2)), any permit or
authorization granted under that Act that authorizes the
installation, operation, or maintenance of electric
transmission cables on a right-of-way granted by the
Secretary described in paragraph (10)(B) shall be issued for
a term equal to the duration of the right-of-way granted by
the Secretary.”.
(b) Clarification of Remedies.—Section 23 of the Outer
Continental Shelf Lands Act ( 43 U.S.C. 1349) is amended—
(1) in subsection (a), by striking paragraph (5) and
inserting the following:
“(5) Remedies.—
“(A) In general.—In issuing a final order in any action
brought pursuant to subsection (a)(1) or (c), a court may
grant such relief, including compensatory damages,
declaratory or injunctive relief, disgorgement of excess
payments, and restitution, as the court determines to be
necessary—
“(i) to compel compliance with this Act;
“(ii) to preserve the rights of affected persons;
“(iii) to restore affected persons to the status in
existence before the applicable violation; and
“(iv) to deter additional violations of this Act.
“(B) Costs.—A court described in subparagraph (A) may
award costs of litigation, including reasonable attorney and
expert witness fees, to any party, as the court determines to
be appropriate.
“(C) Bonds and securities.—In any case in which a
temporary restraining order or preliminary injunction is
sought in an action brought pursuant to subsection (a)(1) or
(c), a court may require the filing of a bond or equivalent
security in an amount sufficient to compensate for any loss
or damage suffered, in accordance with the Federal Rules of
Civil Procedure.”; and
(2) in subsection (c)(1), by striking “Appeal” and
inserting “Appeals”.
(c) Clarification of Purpose.—Section 3(4) of the Outer
Continental Shelf Lands Act (43 U.S.C. 1332(4)) is amended by
striking subparagraph (C) and inserting the following:
“(C) such States, and affected units of local government
within those States, are entitled to an ongoing opportunity
to participate, to the extent consistent with the national
interest, in the policy, planning, and operational decisions
made by the Federal Government relating to—
“(i) exploration for, and development and production of,
minerals of the outer Continental Shelf; or
“(ii) production, transportation, storage, or transmission
of energy from activities on the outer Continental Shelf;”.
(d) Administration of Leasing.—Section 5 of the Outer
Continental Shelf Lands Act (43 U.S.C. 1334) is amended—
(1) in subsection (a)(2)—
(A) in subparagraph (A), by striking the subparagraph
designation and all that follows through “that—” in the
matter preceding clause (i) and inserting the following:
“(A) that such a cancellation may occur at any time, if,
after a hearing at which all affected parties, including all
lessees and all affected States, have an opportunity to
participate, the Secretary determines that—”; and
(B) in subparagraph (B), by striking “lessee;” and
inserting “lessee, if appropriate; and”;
(2) in subsection (h)—
(A) by striking “(h) The” and inserting the following:
“(h) Notification.—
“(1) In general.—The”; and
(B) in paragraph (1) (as so designated), by striking “of
such action” and all that follows through “recommend” and
inserting the following: “of that action.
“(2) Action by secretary.—After receiving a notification
under paragraph (1), the Secretary—
“(A) shall notify, and continue to consult with, the
Governor of each affected State; and
“(B) may recommend”; and
(3) by adding at the end the following:
“(k) Cancellations or Suspensions on Threat of Harm.—Any
cancellation or suspension ordered by the Secretary that is
predicated on a threat of serious irreparable or immediate
harm or damage, or on an imminent threat of serious or
irreparable harm or damage, requires a finding by the
Secretary of particularized harm that can only be feasibly
averted by suspension of on-lease activities.”.
(e) Savings Clause.—Nothing in this section or an
amendment made by this section modifies the limitations
described in section 50265(b)(2) of Public Law 117-169 (43
U.S.C. 3006(b)(2)).
SA 6941. Mr. PADILLA (for Mr. Schiff) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of title IV of division A, add the following:
SEC. 1404. TERMINATED FEDERAL AWARDS.
(a) Requirement.—The Secretary of Energy, the
Administrator of the Environmental Protection Agency, and the
Secretary of Transportation may not terminate a Federal award
in whole or in part, require a renegotiation or rescoping of
the Federal award, or decide not to fund a future budget
period of a Federal award on the basis that the Federal award
no longer effectuates the program goals or agency priorities,
including pursuant to section 200.340(a)(4) of title 2, Code
of Federal Regulations.
(b) Reinstatement.—Any Federal award that was terminated,
renegotiated, rescoped, or not progressed to future budget
periods by the Secretary of Energy, the Administrator of the
Environmental Protection Agency, or the Secretary of
Transportation after January 19, 2025, for no longer
effectuating the program goals or agency priorities,
including pursuant to section 200.340(a)(4) of title 2, Code
of Federal Regulations, shall be reinstated by the applicable
Secretary or Administrator under the previous terms and
conditions of that Federal award.
SA 6942. Mr. PADILLA (for himself, Mr. Gallego, Mr. Lujan, Mr. Hickenlooper, and Ms. Rosen) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts
or sexual contact; which was ordered to lie on the table; as follows:
On page 483, line 23, strike “clause (ii)” and insert
“clauses (ii) and (iii)”.
On page 484, line 17, insert “and clause (iii)” after
“(II)”.
On page 485, between lines 18 and 19, insert the following:
“(iii) Application.—Clauses (i) and (ii) shall not apply
to a claim that is brought by an Indian tribe or Native
Hawaiian Organization based on harm to 1 or more properties
of traditional religious or cultural importance.
SA 6943. Mr. PADILLA submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 17, line 20 of the amendment, insert “, and
assistance described in subparagraph (D)” after “Code”.
On page 23 of the amendment, between lines 13 and 14,
insert the following:
“(D) Anti-circumvention for immigration enforcement and
border agencies.—
“(i) Definition of covered agency.—In this subparagraph,
the term `covered agency' means—
“(I) U.S. Immigration and Customs Enforcement, or any
successor office or agency;
“(II) U.S. Customs and Border Protection, or any successor
office or agency; and
“(III) the Department of Homeland Security or any other
Federal agency, to the extent that the agency—
“(aa) acts on behalf of an agency described in subclause
(I) or (II); or
“(bb) provides funding or assistance for the benefit of
such an agency.
“(ii) Inclusion.—Notwithstanding subparagraph
(B)(i)(III), the term `major Federal action' includes a
proposed agency action of a covered agency to provide
funding, a grant, a loan, a loan guarantee, a contract, a
cooperative agreement, an intergovernmental agreement, a
lease, or any other form of Federal assistance or arrangement
to a State, Tribal, or local government or a private entity
for a project or undertaking if any of the following applies:
“(I) Congressionally directed funds.—The funds are
appropriated or otherwise made available by an Act of
Congress that specifically designates the funds for—
“(aa) that project or undertaking; or
“(bb) a specific category of facilities, operations, or
activities of a covered agency.
“(II) Substitute for direct agency action.—The project or
undertaking will carry out a function, mission, or activity
that a covered agency is authorized or required by law to
perform and would otherwise carry out directly, including
through a facility owned or operated by a covered agency.
“(III) Covered agency use or benefit.—The primary
intended use, occupant, or beneficiary of the completed
project or undertaking, or of its ongoing operation, is a
covered agency or a program administered by a covered agency.
“(IV) Covered agency direction.—A covered agency—
“(aa) selects, approves, or directs the location, design,
scope, capacity, or operating requirements of the project or
undertaking; or
“(bb) retains authority to approve, condition, or
terminate its operation.
“(iii) Prohibition on structuring to avoid review.—A
covered agency may not structure, divide, delegate, or
characterize a proposed agency action for the purpose or with
the effect of avoiding the requirements of this Act for an
action that would otherwise be a major Federal action,
including by transferring funds or responsibility to a non-
Federal entity or contracting with a private entity.
“(iv) Renewals, extensions, and modifications.—This
subparagraph applies to a proposed agency action of a covered
agency to renew, extend, expand, or materially modify a
contract, agreement, or form of assistance described in
clause (ii), including an arrangement entered into before the
date of enactment of this subparagraph, if the renewal,
extension, expansion, or modification would meet any of the
conditions described in subclauses (I) through (IV) of that
clause.
“(v) Written determination.—
“(I) In general.—With respect to a proposed agency action
of a covered agency, the determination under subparagraph (A)
shall be consistent with this subparagraph.
“(II) Requirement.—A determination by a covered agency
under subparagraph (A) that a proposed action of a covered
agency is not a major Federal action described in clause (ii)
shall—
“(aa) be made in writing;
“(bb) state the basis for the determination with reference
to each of subclauses (I) through (IV) of clause (ii); and
“(cc) be made publicly available before the covered agency
takes the action.
Beginning on page 71 of the amendment, strike line 20 and
all that follows through page 72, line 4, and insert the
following:
“(a) Definition of Claim.—
“(1) In general.—In this section, the term `claim' means
a claim that—
“(A) is filed on or after the date of enactment of the
Bipartisan American Affordability and Jobs Act of 2026; and
“(B) seeks judicial review under any provision of Federal
law of an authorization based on a claim that an
environmental review failed to be properly conducted pursuant
to the requirements of this Act.
“(2) Exclusion.—In this section, the term `claim' does
not include a claim that seeks judicial review of a project,
action, or facility proposed, funded, operated, approved,
permitted, or contracted by or on behalf of U.S. Immigration
and Customs Enforcement or U.S. Customs and Border Protection
for immigration enforcement or detention purposes.
SA 6944. Mr. PADILLA (for himself and Mr. Schiff) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 170, between lines 14 and 15, insert the following:
(3) New action; any other action.—The terms “new action”
and “any other action” do not include an action taken
pursuant to any applicable law (including regulations),
including the discretionary or nondiscretionary issuance,
application, or enforcement of statutes or regulations.
On page 171, line 20, insert “or” after the semicolon.
On page 171, line 24, strike “; or” and insert a period.
On page 172, strike lines 1 and 2.
On page 173, line 24, strike “(F)” and insert “(E)”.
SA 6945. Mr. PADILLA submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
In section 1401(b)(4)(F) of the amendment, add at the end
the following:
(iii) Applicability of limitation.—Notwithstanding any
other provision of law, the limitation on payments described
in clause (ii) shall apply to any claim brought pursuant to
applicable law that—
(I) the United States Court of Federal Claims would have
jurisdiction; and
(II) arises from the termination of—
(aa) a Federal authorization or permit; or
(bb) a Federal lease.
SA 6946. Mr. PADILLA submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of subtitle F of title II of division B, add
the following:
SEC. 2253. PROHIBITION OF OIL AND GAS EXPLORATION,
DEVELOPMENT, AND PRODUCTION ON THE OUTER
CONTINENTAL SHELF OFF THE COAST OF CALIFORNIA,
OREGON, AND WASHINGTON.
Section 8 of the Outer Continental Shelf Lands Act (43
U.S.C. 1337) is amended by adding at the end the following:
“(q) Prohibition of Oil and Gas Exploration, Development,
and Production in Certain Areas of the Outer Continental
Shelf.—
“(1) In general.—Notwithstanding any other provision of
this section or any other law, the Secretary shall not issue
a lease or any other authorization for the exploration,
development, or production of oil or natural gas in the
planning areas described in paragraph (2).
“(2) Planning areas.—The planning areas referred to in
paragraph (1) are the following, as depicted in the 2024-2029
National Outer Continental Shelf Oil and Gas Leasing Proposed
Final Program published on September 29, 2023, by the Bureau
of Ocean Energy Management (as announced in the notice of
availability of the Bureau of Ocean Energy Management
entitled `Notice of Availability of the 2024-2029 National
Outer Continental Shelf Oil and Gas Leasing Proposed Final
Program and Final Programmatic Environmental Impact
Statement' (88 Fed. Reg. 67798 (October 2, 2023))):
“(A) The Washington/Oregon Planning Area.
“(B) The Northern California Planning Area.
“(C) The Central California Planning Area.
“(D) The Southern California Planning Area.”.
SA 6947. Mr. BENNET submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Strike section 2211.
SA 6948. Mr. BENNET (for himself and Mr. Lujan) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Strike section 2215.
SA 6949. Mr. BENNET submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 376, strike lines 3 through 14 and insert the
following:
“(2) Authorization.—Notwithstanding subsections (a) and
(b), where public land is needed by the proprietor of a lode
or placer claim for operations in connection with any lode or
placer claim within the proposed plan of operations, the
proprietor may locate and include within the plan of
operations as many valid mill site claims under this
subsection as are reasonably necessary for its operations.
SA 6950. Mr. BENNET submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of division B, add the following:
TITLE IV—MINING REFORM
SEC. 2401. DEFINITIONS.
In this title:
(1) Applicant.—The term “applicant” means any person
that applies for—
(A) a permit under this title; or
(B) a modification to, or a renewal of, a permit issued
under this title.
(2) Beneficiation.—The term “beneficiation” means—
(A) the crushing and grinding of locatable mineral ore; and
(B) any processes that are employed to free the mineral
from other constituents, including physical and chemical
separation techniques.
(3) Casual use.—
(A) In general.—The term “casual use” means mineral
activities that ordinarily result in no or negligible
disturbance of Federal land or resources.
(B) Inclusions.—The term “casual use” includes the
collection of geochemical, rock, soil, or mineral specimens
using hand tools, hand panning, or nonmotorized sluicing.
(C) Exclusions.—The term “casual use” does not include—
(i) the use of mechanized earth-moving equipment, suction
dredging, or explosives;
(ii) the use of motor vehicles in areas closed to off-road
vehicles;
(iii) the construction of roads or drill pads; or
(iv) the use of toxic or hazardous materials or explosives.
(4) Claim holder.—The term “claim holder” means a person
holding a mining claim, millsite, or tunnel site that is—
(A) located under the general mining laws; and
(B) maintained in compliance with the general mining laws
and this title.
(5) Control.—The term “control” means having the ability
to determine the manner in which an entity conducts mineral
activities.
(6) Exploration.—
(A) In general.—The term “exploration” means creating a
surface disturbance (other than casual use) to evaluate the
type, extent, quantity, or quality of minerals present.
(B) Inclusions.—The term “exploration” includes mineral
activities associated with sampling, drilling, or developing
surface or underground workings to evaluate locatable mineral
values.
(C) Exclusions.—The term “exploration” does not include
the extraction of mineral material for commercial use or
sale.
(7) Federal land.—The term “Federal land” means any land
and any interest in land that is—
(A) owned by the United States; and
(B) open to location of mining claims under the general
mining laws and this Act.
(8) Hardrock mineral.—The term “hardrock mineral” has
the meaning given the term “locatable mineral” except
that—
(A) legal and beneficial title to the mineral need not be
held by the United States; and
(B) paragraph (12)(B) does not apply to this paragraph.
(9) Indian country.—The term “Indian country” has the
meaning given the term in section 1151 of title 18, United
States Code.
(10) Indian land.—The term “Indian land” means land that
is—
(A) held in trust for the benefit of an Indian Tribe or
member of an Indian Tribe; or
(B) held by an Indian Tribe or member of an Indian Tribe,
subject to a restriction by the United States against
alienation.
(11) Indian tribe.—The term “Indian Tribe” has the
meaning given the term in section 4 of the Indian Self-
Determination and Education Assistance Act (25 U.S.C. 5304).
(12) Locatable mineral.—
(A) In general.—The term “locatable mineral” means any
mineral—
(i) the legal and beneficial title to which remains in the
United States; and
(ii) that is not subject to disposition under—
(I) the Mineral Leasing Act (30 U.S.C. 181 et seq.);
(II) the Geothermal Steam Act of 1970 (30 U.S.C. 1001 et
seq.);
(III) the Act of July 31, 1947 (commonly known as the
“Materials Act of 1947”) (30 U.S.C. 601 et seq.); or
(IV) Mineral Leasing Act for Acquired Lands (30 U.S.C. 351
et seq.).
(B) Exclusions.—The term “locatable mineral” does not
include any mineral that is—
(i) subject to a restriction against alienation imposed by
the United States; and
(ii) held in trust by the United States for, or owned by,
any Indian Tribe or member of an Indian Tribe.
(13) Mineral activity.—The term “mineral activity” means
any activity on a mining claim, millsite, or tunnel site, or
Federal land used in conjunction with the activity, for,
relating to, or incidental to, mineral exploration, mining,
beneficiation, processing, or reclamation activities for any
locatable mineral.
(14) Operator.—The term “operator” means—
(A) any person proposing, or authorized by a permit, to
conduct mineral activities under this title; and
(B) any agent of a person described in subparagraph (A).
(15) Person.—The term “person” means—
(A) an individual, Indian Tribe, partnership, association,
society, joint venture, joint stock company, firm, company,
corporation, cooperative, trust, consortium, or other
organization; and
(B) any instrumentality of a State or local government,
including any publicly owned utility or publicly owned
corporation of a State or local government.
(16) Processing.—
(A) In general.—The term “processing” means processes
downstream of beneficiation used to prepare locatable mineral
ore into the final marketable product.
(B) Inclusions.—The term “processing” includes smelting
and electrolytic refining.
(17) Secretary.—The term “Secretary” means the Secretary
of the Interior.
(18) Secretary concerned.—The term “Secretary concerned”
means—
(A) with respect to National Forest System land, the
Secretary of Agriculture, acting through the Chief of the
Forest Service; and
(B) with respect to land managed by the Bureau of Land
Management or other Federal land, the Secretary, acting
through the Director of the Bureau of Land Management.
(19) Temporary cessation.—The term “temporary cessation”
means a halt in mine related production activities for a
continuous period of not longer than 5 years.
(20) Undue degradation.—The term “undue degradation”
means substantial irreparable harm to significant scientific,
cultural, or environmental resources on public land.
Subtitle A—Locatable Mineral Deposits
SEC. 2411. LIMITATION ON PATENTS.
(a) Determinations Required.—Notwithstanding section 2215
(or the amendments made by that section), no patent shall be
issued by the United States for any mining claim, millsite,
or tunnel site located under the general mining laws unless
the Secretary determines that—
(1) a patent application was filed with the Secretary with
respect to the claim not later than September 30, 1994; and
(2) all requirements applicable to the patent application
under law were fully complied with by the date described in
paragraph (1).
(b) Right To Patent.—
(1) In general.—Subject to paragraph (2) and
notwithstanding subsection (c), if the Secretary makes the
determinations under paragraphs (1) and (2) of subsection (a)
with respect to a mining claim, millsite, or tunnel site, the
claim holder shall be entitled to the issuance of a patent in
the same manner and degree to which the claim holder would
have been entitled to a patent before the date of enactment
of this Act.
(2) Withdrawal.—The claim holder shall not be entitled to
the issuance of a patent if the determinations under
paragraphs (1) and (2) of subsection (a) are withdrawn or
invalidated by the Secretary or, on review, by a court of the
United States.
(c) Repeal.—Section 2325 of the Revised Statutes (30
U.S.C. 29) is repealed.
SEC. 2412. FEES.
(a) Claim Maintenance Fees.—
(1) In general.—Not later than August 31, 2027, and each
August 31 thereafter, the holder of each unpatented mining
claim, millsite, or tunnel site shall pay to the Secretary a
maintenance fee of $400 for each claim, millsite, or tunnel
site.
(2) Requirements.—The maintenance fees required under
paragraph (1) shall be in lieu of—
(A) the assessment work requirements under the general
mining laws; and
(B) the related filing requirements under subsections (a)
and (c) of section 314 of the Federal Land Policy and
Management Act of 1976 (43 U.S.C. 1744).
(3) Timing of initial payment.—Notwithstanding paragraph
(1), the maintenance fee payable for the initial assessment
year in which the location is made shall be paid at the time
the location notice is recorded with the Bureau of Land
Management.
(4) Claim relocation.—
(A) Definition of related party.—In this paragraph, the
term “related party” means—
(i) the spouse and qualifying child (as defined in section
152 of the Internal Revenue Code of 1986) of the claim
holder; and
(ii) a person affiliated with the claim holder, including—
(I) a person controlled by, controlling, or under common
control with, the claim holder; or
(II) a subsidiary, parent company, partner, director, or
officer of the claim holder.
(B) Limits on relocation.—
(i) In general.—No claim, millsite, or tunnel site, or
portion of a claim or site, may be relocated by a person or
related party if the person or related party held the claim
or site and subsequently relinquished the claim or site or
allowed the claim or site to become null and void.
(ii) Duration.—The prohibition on relocation shall extend
for a period of 10 years beginning on the date the claim or
site was relinquished or became null and void.
(5) Adjustment.—
(A) In general.—Subject to subparagraph (B), beginning on
the date that is 5 years after the date of enactment of this
Act and every 5 years thereafter, the Secretary shall adjust
the amount of maintenance fees required under paragraph (1)
to reflect changes in the Consumer Price Index for all urban
consumers published by the Department of Labor.
(B) More frequent adjustments.—The Secretary may adjust
the amount of the maintenance fees more frequently than
specified in subparagraph (A) to reflect changes in the
Consumer Price Index for all urban consumers published by the
Department of Labor if the Secretary determines an adjustment
to be reasonable.
(C) Notice.—Not later than July 1 of any year in which an
adjustment is made under this paragraph, the Secretary shall
provide claim holders notice of the adjustment.
(D) Application.—An adjustment under this paragraph shall
apply beginning in the first calendar year after the calendar
year in which the adjustment is made.
(6) Applicable law.—The co-ownership provisions of section
2324 of the Revised Statutes (30 U.S.C. 28) shall remain in
effect, except that the annual maintenance fee, as
applicable, shall replace applicable assessment requirements
and expenditures.
(7) Use and occupancy of claims.—Timely performance of
required assessment work or payment of the maintenance fee
under this subsection satisfies any obligation the claim
holder has under the pedis possessio doctrine for any claim
properly located in accordance with the general mining laws
and applicable State law.
(b) Location Fees.—
(1) In general.—Subject to paragraph (2) and
notwithstanding any other provision of law, for each
unpatented mining claim, millsite, or tunnel site located
after the date of enactment of this Act, the locator shall,
at the time the location notice is recorded with the Bureau
of Land Management, pay to the Secretary a location fee of
$50 for each claim for each location notice recorded with the
Bureau of Land Management.
(2) Adjustment.—
(A) In general.—Subject to subparagraph (B), beginning on
the date that is 5 years after the date of enactment of this
Act and every 5 years thereafter, the Secretary shall adjust
the amount of location fees required under paragraph (1) to
reflect changes in the Consumer Price Index for all Urban
Consumers published by the Bureau of Labor Statistics of the
Department of Labor.
(B) More frequent adjustments.—The Secretary may adjust
the amount of the location fees more frequently than
specified in subparagraph (A) to reflect changes in the
Consumer Price Index for all Urban Consumers published by the
Bureau of Labor Statistics of the Department of Labor if the
Secretary determines an adjustment to be reasonable.
(C) Notice.—Not later than July 1 of any year in which an
adjustment is made under this paragraph, the Secretary shall
provide claim holders notice of the adjustment.
(D) Application.—An adjustment under this paragraph shall
apply beginning in the first calendar year after the calendar
year in which the adjustment is made.
(3) Effect on maintenance fee.—The location fee required
under paragraph (1) shall be in addition to the maintenance
fee required under subsection (a).
(c) Disposition of Funds.—
(1) In general.—Any amounts received under this section
shall be used to pay the costs of administering program
operations under sections 2318 through 2352 of the Revised
Statutes (commonly known as the “Mining Law of 1872”) (30
U.S.C. 21 et seq.) and this title, without further
appropriation.
(2) Excess amounts.—Any amounts in excess of the costs
described in paragraph (1) for any fiscal year shall be
deposited in the Abandoned Hardrock Mine Fund established by
section 2215(d)(1).
(d) Effect of Section.—Nothing in this section changes or
modifies—
(1) section 314(b) of the Federal Land Policy and
Management Act of 1976 (43 U.S.C. 1744(b)); or
(2) the provisions of subsection (c) of section 314 of the
Federal Land Policy and Management Act of 1976 (43 U.S.C.
1744) relating to filings required by subsection (b) of that
section.
SEC. 2413. LIMITATIONS.
(a) Failure To Comply.—
(1) In general.—The failure of the claim holder to perform
assessment work or to pay a maintenance fee if required under
section 2412(a), to pay a location fee under section 2412(b),
or to file a timely notice of location shall—
(A) conclusively constitute a forfeiture of the mining
claim, millsite, or tunnel site; and
(B) make the claim or site null and void by operation of
law.
(2) Effect.—Forfeiture under paragraph (1) shall not
relieve any person of any obligation under this title and
applicable regulations, including reclamation, and other
applicable law.
(b) Relinquishment.—
(1) In general.—A claim holder deciding not to pursue
mineral activities on a mining claim, millsite, or tunnel
site, may relinquish the claim or site by notifying the
Secretary of the intent to relinquish the claim or site.
(2) Effect.—A claim holder relinquishing a claim,
millsite, or tunnel site under paragraph (1) shall be
responsible for any obligation under this title and
applicable regulations, including reclamation, and other
applicable law.
(c) Use of Mining Claim.—
(1) In general.—The continued use, occupancy, and
retention of any mining claim, millsite, or tunnel site
subject to this title shall be exclusively for mineral
activities as authorized under this title.
(2) Failure to use for mineral activities.—If the claim
holder cannot demonstrate to the Secretary that the mining
claim, millsite, or tunnel site has been used exclusively for
mineral activities, the Secretary shall declare the claim,
millsite, or tunnel site null and void.
Subtitle B—Royalties
SEC. 2421. ROYALTY.
(a) In General.—Subject to subsection (c), production of
all locatable minerals from any mining claim located under
the general mining laws and maintained in compliance with
this Act shall be subject to a royalty established by the
Secretary by regulation of not less than 5 percent, and not
more than 8 percent, of the gross income from mining for
production of all locatable minerals.
(b) Royalty Rate.—The regulation shall establish a
reasonable royalty rate for each locatable mineral subject to
a royalty under this section that may vary based on the
locatable mineral concerned.
(c) No Royalty for Federal Land Subject to Existing
Permit.—No royalty under subsection (a) shall be required
for production on Federal land that—
(1) is subject to an approved plan of operations or an
operations permit on the date of the enactment of this Act;
and
(2) produces valuable locatable minerals in commercial
quantities on the date of enactment of this Act.
(d) Federal Land Not Subject to Existing Operations
Permit.—Production from any Federal land not specifically
approved for mineral extraction under a plan of operations or
an operations permit in existence on the date of enactment of
this Act shall be subject to the royalty described in
subsection (a).
(e) Deposit.—Amounts received by the United States as
royalties under this section shall be deposited in the
Abandoned Hardrock Mine Fund established by section
2215(d)(1) .
SEC. 2422. ENFORCEMENT.
(a) Duties of the Secretary.—
(1) In general.—The Secretary shall establish a
comprehensive inspection, collection, fiscal, and production
accounting and auditing system—
(A) to accurately determine royalties, interest, fines,
penalties, fees, deposits, and other payments owed under this
subtitle; and
(B) to collect and account for such payments in a timely
manner.
(2) Inspections.—The Secretary shall establish procedures
to ensure that authorized and properly identified
representatives of the Secretary will inspect at least once
annually each mining claim that—
(A) is producing or expected to produce a significant
quantity of locatable minerals in any year; or
(B) has a history of noncompliance with this subtitle.
(b) Duties of Claim Holders, Operators, and Transporters.—
(1) Payment of royalties.—
(A) In general.—A person who is required to make any
royalty or other payment under this subtitle shall make
payment to the United States at such times and in such manner
as the Secretary may by rule prescribe.
(B) Liability for payments.—
(i) Designees.—Any person who pays, offsets, or credits
funds, makes adjustments, requests and receives refunds, or
submits reports with respect to payments another person is
required to make shall be considered the designee of the
other person under this subtitle.
(ii) Liability.—A designee shall be liable for any payment
obligation under this subtitle of any person on whose behalf
the designee undertakes the activities described in clause
(i).
(iii) Pro rata share.—The person owning an interest in a
claim, millsite, or tunnel site, or production from the claim
or site, shall be liable for the pro rata share of the person
of payment obligations under this subtitle.
(2) Site security.—
(A) In general.—A person conducting mineral activities
shall develop and comply with the site security provisions in
the mining permit designed to protect from theft the
locatable minerals that are produced or stored on a mining
claim.
(B) Minimum standards.—The provisions shall conform with
such minimum standards as the Secretary may prescribe by
rule, taking into account the variety of circumstances on
mining claims.
(C) Notification of commencement or resumption of
production.—Not later than the fifth business day after
production begins in any place on a mining claim or
production resumes after more than 90 days after production
ceased or was suspended, the person conducting mineral
activities shall notify the Secretary, in the manner
prescribed by the Secretary, of the date on which the
production has begun or resumed.
(c) Recordkeeping and Reporting Requirements.—
(1) In general.—A claim holder, operator, or other person
directly or indirectly involved in developing, producing,
processing, transporting, purchasing, or selling locatable or
hardrock minerals, subject to this Act, through the point of
first sale, the point of royalty or fee computation, or the
point of smelting or other processing, whichever is later,
shall establish and maintain any records, make any reports,
and provide any information that the Secretary may reasonably
require for the purposes of implementing this subtitle or
determining compliance with rules or orders under this
subtitle.
(2) Access.—On the request of any officer or employee duly
designated by the Secretary conducting an audit or
investigation pursuant to this section, the appropriate
records, reports, or information that may be required by this
section shall be made available for inspection and
duplication by the officer or employee.
(3) Duration of recordkeeping requirement.—
(A) In general.—Records required by the Secretary under
this section shall be maintained for 7 years after the
records are generated or amended unless the Secretary
notifies the claim holder, operator, other person referred to
in paragraph (1), or record holder that the Secretary has
initiated an audit or investigation involving the records and
that the records must be maintained for a longer period.
(B) Ongoing audit or investigation.—In any case in which
an audit or investigation is underway, records shall be
maintained until the Secretary releases the claim holder,
operator, other person referred to in paragraph (1), or
record holder subject to the recordkeeping and requirements
of this Act of the obligation to maintain the records.
(d) Audits.—The Secretary may conduct such audits of all
claim holders, operators, producers, transporters,
purchasers, processors, or other persons directly or
indirectly involved in the production or sales of locatable
or hardrock minerals covered by this Act, as the Secretary
considers necessary for the purposes of ensuring compliance
with the requirements of this subtitle.
(e) Cooperative Agreements.—
(1) In general.—The Secretary may enter into cooperative
agreements with the Secretary of Agriculture—
(A) to share information concerning the royalty management
of locatable minerals;
(B) to carry out inspection, auditing, investigation, or
enforcement (not including the collection of royalties, civil
or criminal penalties, or other payments) activities under
this section in cooperation with the Secretary; and
(C) to carry out any other activity described in this
section.
(2) Access.—Subject to paragraph (3) and pursuant to a
cooperative agreement, the Secretary of Agriculture shall, on
request, have access to all royalty or fee accounting
information in the possession of the Secretary relating to
the production, removal, or sale of locatable minerals from
claims on Federal land.
(3) Confidential information.—
(A) In general.—Trade secrets, proprietary information,
and other confidential information protected from disclosure
under section 552 of title 5, United States Code, shall be
made available by the Secretary to other Federal agencies as
necessary to ensure compliance with this title and other
Federal laws.
(B) Protection by other federal officials.—The Secretary,
the Secretary of Agriculture, and other Federal officials
shall ensure that information described in subparagraph (A)
is provided protection in accordance with section 552 of
title 5, United States Code.
(f) Interest.—
(1) Definition of underpayment.—In this subsection, the
term “underpayment” means the difference between the
royalty on the value of the production that should have been
received by the Secretary and the royalty on the value of the
production that was received by the Secretary, if the royalty
that should have been received is greater than the royalty
that was received.
(2) Nonpayment and underpayment.—
(A) Nonpayment.—In the case of mining claims or operations
with respect to which royalty payments are not received by
the Secretary by the date that the payments are due, the
Secretary shall charge interest on the nonpayment at the rate
specified under subparagraph (C).
(B) Underpayment.—In the case of an underpayment, interest
shall be computed and charged only on the amount of the
deficiency and not on the total amount, at the rate specified
under subparagraph (C).
(C) Interest rate.—In the case of nonpayment or
underpayment, interest shall be charged at the rate
applicable under section 6621(a)(2) of the Internal Revenue
Code of 1986.
(g) Expanded Royalty Obligations.—Each person liable for
royalty payments under this section shall be jointly and
severally liable for royalty on all locatable minerals lost
or wasted from a mining claim located under the general
mining laws and maintained in compliance with this Act if the
loss or waste is due to negligence on the part of any such
person or due to the failure to comply with any rule,
regulation, or order issued under this section.
(h) Hearings and Investigations.—In carrying out this
subtitle, the Secretary may—
(1) conduct any investigation or other inquiry necessary
and appropriate;
(2) conduct, after notice, any necessary and appropriate
hearing or audit under rules prescribed by the Secretary; and
(3) administer oaths and issue subpoenas in conducting such
proceedings.
(i) Civil Penalties.—
(1) Failure to comply with applicable law, rules or
regulations, or to permit inspection.—
(A) In general.—Except as provided in subparagraph (B), a
person shall be liable for a penalty of up to $500 per
violation for each day the violation continues, dating from
the date of the notice or report, if the person—
(i) after due notice of violation or after the violation
has been reported under subparagraph (B)(i), fails or refuses
to comply with any requirement of this subtitle or any rule
or regulation under this subtitle; or
(ii) fails or refuses to permit inspection authorized under
this subtitle.
(B) Exceptions.—A penalty under this paragraph may not be
applied to any person who is otherwise liable for a violation
of subparagraph (A) if—
(i) the violation was discovered and reported to the
Secretary or the authorized representative of the Secretary
by the liable person and corrected within 20 days after the
report (or such longer period to which the Secretary may
agree); or
(ii) after the due notice of violation required under
subparagraph (A)(i) has been given to the person by the
Secretary or the authorized representative of the Secretary,
the person has corrected the violation within 20 days of the
notification (or such longer period to which the Secretary
may agree).
(2) Failure to take corrective action.—If corrective
action is not taken within 40 days (or a longer period to
which the Secretary may agree), after due notice or
submission of a report referred to in paragraph (1)(A)(i),
the person shall be liable for a civil penalty of not more
than $5,000 per violation for each day the violation
continues, dating from the date of the notice or report.
(3) Failure to make payment or to permit lawful entry,
inspection, or audit.—A person shall be liable for a penalty
of up to $10,000 per violation for each day the violation
continues if the person—
(A) knowingly or willfully fails to make any payment of any
royalty under this subtitle by the date as specified by law
(including regulation or order);
(B) fails or refuses to permit lawful entry, inspection, or
audit; or
(C) knowingly or willfully fails to comply with subsection
(b)(2)(C).
(4) False information; unauthorized removal of locatable
mineral.—A person shall be liable for a penalty of up to
$25,000 per violation for each day the violation continues in
any case in which the person, in violation of this subtitle—
(A) knowingly or willfully prepares, maintains, or submits
false, inaccurate, or misleading reports, notices,
affidavits, records, data, or other written information;
(B) knowingly or willfully takes or removes, transports,
uses or diverts any locatable mineral from any land covered
by a mining claim without having valid legal authority to do
so; or
(C) purchases, accepts, sells, transports, or conveys to
another, any locatable mineral knowing or having reason to
know that the
locatable mineral was stolen or unlawfully removed or
diverted.
(5) Hearing.—No penalty under this subsection shall be
assessed until the person charged with a violation has been
given the opportunity for a hearing on the record.
(6) Deduction of penalty from sums owed by united states.—
The amount of any penalty under this subsection, as finally
determined, may be deducted from any sums owed by the United
States to the person charged.
(7) Compromise or reduction of penalties.—On a case-by-
case basis, the Secretary may compromise or reduce civil
penalties under this subsection.
(8) Notice.—
(A) In general.—Notice under this subsection shall be by
personal service by an authorized representative of the
Secretary or by registered mail.
(B) Designee for receipt of notice.—Any person may, in the
manner prescribed by the Secretary, designate a
representative to receive any notice under this subsection.
(9) Reasons on record for amount of penalty.—In
determining the amount of the penalty under this subsection,
whether the penalty should be remitted or reduced, and by
what amount, the Secretary shall state on the record the
reasons for the determinations of the Secretary.
(10) Review.—
(A) In general.—Any person who has requested a hearing in
accordance with paragraph (5) within the time the Secretary
has prescribed for such a hearing and who is aggrieved by a
final order of the Secretary under this subsection may seek
review of the order in the United States district court for
the judicial district in which the violation allegedly took
place.
(B) Basis for review.—Review by the district court shall
be only on the administrative record and not de novo.
(C) Deadline.—An action under this paragraph shall be
barred unless the action is filed not later than the date
that is 90 days after the date of issuance of the final order
of the Secretary.
(11) Failure to pay penalty.—
(A) In general.—Subject to subparagraphs (B) and (C), if
any person fails to pay an assessment of a civil penalty
under this title, the court shall have jurisdiction to award
the amount assessed plus interest from the date of the
expiration of the 90-day period referred to in paragraph
(10)(C).
(B) Application.—Subparagraph (A) applies—
(i) after the order making the assessment has become a
final order and if the person does not file a petition for
judicial review of the order in accordance with paragraph
(10); or
(ii) after a court in an action brought under paragraph
(10) has entered a final judgment in favor of the Secretary.
(C) Order to pay.—Judgment by the court shall include an
order to pay.
(j) Criminal Penalties.—Any person who commits an act for
which a civil penalty is provided under subsection (i)(4)
shall, on conviction, be punished by a fine of not more than
$50,000 or by imprisonment for not more than 2 years, or
both.
(k) Effective Date.—
(1) In general.—Except as provided in section 2421(b) with
respect to the payment of royalties, the royalty required
under section 2421 shall take effect with respect to the
production of minerals on or after the date of enactment of
this Act.
(2) Initial production.—Any royalty payments attributable
to production during the 1-year period beginning on the date
of enactment of this Act shall be payable at the expiration
of the 1-year period, together with interest at the rate
required under subsection (f)(2)(C).
(l) Injunction and Specific Enforcement Authority.—
(1) Civil action by attorney general.—In addition to any
other remedy under law, the Attorney General or the designee
of the Attorney General may bring a civil action in a
district court of the United States, which shall have
jurisdiction over such actions—
(A) to restrain any violation of this subtitle; or
(B) to compel the taking of any action required by or under
this subtitle.
(2) Venue.—A civil action described in paragraph (1) may
be brought only in the United States district court for the
judicial district in which the act, omission, or transaction
constituting a violation under this subtitle occurred, or in
which the defendant is found or transacts business.
SEC. 2423. REVIEW.
(a) In General.—Not later than 5 years after the date of
enactment of this Act, and every 5 years thereafter, the
Secretary shall complete a review and submit to the Committee
on Energy and Natural Resources of the Senate and the
Committee on Natural Resources of the House of
Representatives a report addressing collections and impacts
of the royalty and fees provided for by this title.
(b) Topics.—The report required under subsection (a) shall
address—
(1) the total revenues received (by category) on an annual
basis as—
(A) claim maintenance fees;
(B) location fees;
(C) land use fees;
(D) royalties and related payments; and
(E) abandoned mine land fees;
(2) the disposition of the fees and royalties, including—
(A) the amount used for mining law program administration;
and
(B) the amount used for abandoned mine land reclamation,
including allocation by State and Indian Tribe;
(3) the effectiveness of the program under this title in
addressing abandoned mine land problems on Federal and non-
Federal land;
(4) any impact on domestic locatable mineral exploration
and production as a result of the fees and royalties; and
(5) any recommendations with respect to changes in Federal
law (including regulations) relating to the amount or method
of collection (including auditing, compliance, and
enforcement) of the fees and royalties.
Subtitle C—Mineral Activities
SEC. 2431. PERMITS.
(a) In General.—Except as provided in section 2441(a)(2),
no person may engage in mineral activities on Federal land
that may cause a disturbance of surface resources, including
land, air, water, and fish and wildlife, unless a permit
authorizing the activities was issued to the person under
this title.
(b) Exceptions.—Notwithstanding subsection (a), a permit
under this subtitle shall not be required for mineral
activities that are a casual use of the Federal land.
(c) No Modification.—Nothing in this section enlarges,
diminishes, establishes, repeals, or otherwise modifies any
requirement of law that a mining claim, millsite, or tunnel
site be valid in order for mineral activities to be
undertaken.
(d) Coordination With NEPA Process.—To the maximum extent
practicable, the Secretary concerned shall conduct the permit
processes under this title in coordination with the timing
and other requirements of section 102 of the National
Environmental Policy Act of 1969 (42 U.S.C. 4332).
SEC. 2432. EXPLORATION PERMITS.
(a) In General.—Except as provided in section 2441(a)(2),
an exploration permit shall be required prior to conducting
any exploration activities on Federal land that involve more
than the casual use of the Federal land.
(b) Limitations.—An exploration permit under subsection
(a) shall not authorize the person to—
(1) remove any mineral for sale; or
(2) conduct any activity other than an activity required
for—
(A) exploration for locatable minerals; or
(B) reclamation.
(c) Requirements.—To be eligible for an exploration
permit, a person shall submit to the Secretary concerned, in
a manner prescribed by the Secretary concerned, an
application for an exploration permit that contains—
(1) an exploration plan demonstrating that—
(A) the applicant will operate in accordance with this
title and applicable regulations;
(B) the formation of acid mine drainage will be avoided to
the maximum extent practicable; and
(C) mineral activities will be conducted in a manner that
uses best management practices;
(2) a description of potential impacts to groundwater and
surface water, including appropriate hydrological assessments
and analyses, as reasonably required by the Secretary;
(3) a reclamation plan for the proposed exploration
activity demonstrating that the applicant will conduct
reclamation activities in accordance with section 2436;
(4) evidence of adequate financial assurance in accordance
with section 2434;
(5) the necessary documentation to demonstrate that the
proposed exploration activity will comply with applicable
Federal and State environmental laws (including regulations);
(6) a monitoring and evaluation plan to ensure compliance
with reclamation and other requirements of this title; and
(7) any other relevant information determined by the
Secretary to be necessary to satisfy the requirements of this
title and other applicable law.
(d) Permit Issuance.—
(1) Approval.—
(A) In general.—Subject to subparagraph (B), the Secretary
concerned shall approve an application and issue an
exploration permit if the Secretary concerned determines that
the application is in compliance with—
(i) this title;
(ii) any regulations promulgated under this title; and
(iii) any other applicable law.
(B) Conditions.—The Secretary concerned may reasonably
condition the approval of such a permit to satisfy the
requirements of this title and applicable regulations.
(2) Denial.—The Secretary concerned shall deny the
issuance of an exploration permit if the Secretary concerned
determines that the permit does not meet the requirements
of—
(A) this title;
(B) any regulations promulgated under this title; or
(C) other applicable law.
(3) Notice.—Before approving or denying an exploration
permit under this subsection, the Secretary concerned—
(A) shall provide public notice and an opportunity for
written comment; and
(B) may hold a public hearing.
(e) Modifications to Permit.—
(1) In general.—The permit holder may submit to the
Secretary concerned an application to modify an exploration
permit.
(2) Approval.—
(A) In general.—In determining whether to approve or
disapprove a proposed modification to an exploration permit,
the Secretary concerned shall make the same determinations as
are required in the case of the original permit.
(B) Exceptions.—Subparagraph (A) shall not apply to minor
modifications to an exploration permit or instances in which
the nature of the modifications make compliance with the
requirements unnecessary, as determined by the Secretary
concerned.
(3) Modifications from secretary concerned.—
(A) In general.—The Secretary concerned may require
reasonable modification to any permit on a determination that
the requirements of this title or other applicable law cannot
be met if the permit is followed as approved.
(B) Requirements for determination.—A determination under
subparagraph (A) shall be—
(i) based on a written finding; and
(ii) subject to notice and hearing requirements established
by the Secretary concerned.
SEC. 2433. MINING PERMITS.
(a) In General.—Except as provided in section 2441(a)(2),
a mining permit shall be required prior to conducting mineral
activities on Federal land, other than casual use or
exploration on the Federal land.
(b) Requirements.—To be eligible for a mining permit, a
person shall submit to the Secretary concerned, in a manner
prescribed by the Secretary concerned, an application for a
mining permit that contains—
(1) a description of the condition of the land and water
resources of the area before mining activities are initiated;
(2) an operations plan demonstrating that—
(A) the applicant will operate in accordance with this
title and applicable regulations;
(B) the formation of acid mine drainage will be avoided to
the maximum extent practicable; and
(C) mineral activities will be conducted in a manner that
uses best management practices;
(3) a description of potential impacts to groundwater and
surface water, including appropriate hydrological assessments
and analyses, as reasonably required by the Secretary;
(4) a reclamation plan for the proposed mineral activities
demonstrating that the applicant will conduct reclamation
activities in accordance with section 2436;
(5) evidence of adequate financial assurance under section
2434, including, if required, a trust fund as required under
section 2434(i);
(6) the necessary documentation to demonstrate that the
proposed mineral activities will comply with applicable
Federal and State environmental laws (including regulations);
(7) a monitoring and evaluation plan to ensure compliance
with reclamation and other requirements of this title; and
(8) any other relevant information determined by the
Secretary concerned to be necessary to satisfy the
requirements of this title and other applicable law.
(c) Permit Issuance.—
(1) Approval.—
(A) In general.—Subject to subparagraph (B), the Secretary
concerned shall approve a permit application and issue a
mining permit if the Secretary concerned determines that the
application is in compliance with—
(i) this title;
(ii) any regulations promulgated under this title; and
(iii) other applicable law.
(B) Conditions.—The Secretary concerned may reasonably
condition the approval of such a permit to satisfy the
requirements of this title and applicable regulations.
(2) Denial.—The Secretary concerned shall deny the
issuance of a mining permit if the Secretary concerned
determines that the permit does not meet the requirements
of—
(A) this title;
(B) any regulations promulgated under this title; or
(C) other applicable law.
(3) Notice.—Before approving or denying a mining permit
under this subsection, the Secretary concerned—
(A) shall provide public notice and an opportunity for
written comment; and
(B) may hold a public hearing.
(d) Term of Permit; Continuation.—
(1) In general.—An operations permit shall—
(A) be for a term of 30 years; and
(B) continue for so long thereafter as locatable minerals
are produced in commercial quantities from the permit area in
compliance with the requirements of this title and other
applicable law.
(2) Continuation.—No permit shall expire because
operations or production have ceased pursuant to an approved
temporary cessation or been suspended pursuant to any order
of, or with the consent of, the Secretary concerned.
(e) Modifications to Permit.—
(1) Request from permit holder.—
(A) In general.—A mining permit holder may submit to the
Secretary concerned an application to modify the mining
permit.
(B) Approval.—
(i) In general.—In determining whether to approve or
disapprove a proposed modification to a mining permit, the
Secretary concerned shall make the same determinations as are
required in the case of an original mining permit.
(ii) Exceptions.—Clause (i) shall not apply to minor
modifications to a mining permit or instances in which the
nature of the modifications make compliance with the
requirements unnecessary, as determined by the Secretary
concerned.
(2) Modifications from secretary concerned.—
(A) In general.—The Secretary concerned may require
reasonable modification to any permit on a determination that
the requirements of this title or other applicable law cannot
be met if the permit is followed as approved.
(B) Requirements for determination.—A determination under
subparagraph (A) shall be—
(i) based on a written finding; and
(ii) subject to notice and hearing requirements established
by the Secretary concerned.
(f) Land Use Fees.—
(1) In general.—In the case of Federal land included in a
mining permit approved under this section after the date of
enactment of this Act, or Federal land added pursuant to a
modification to a permit or plan of operations if the
modification is approved after the date of enactment of this
Act, not later than August 31 of each year, the operator
shall pay a land use fee in an amount established by the
Secretary by regulation that is equal to 4 times the claim
maintenance fee imposed under section 2412(a)(1) for each 20
acres of Federal land that is included within the mine permit
area.
(2) Additional fee.—The land use fee imposed under this
subsection shall be in addition to the claim maintenance fees
imposed under section 2412(a).
(3) Authorized activities.—Upon approval by the Secretary
concerned of a mining permit and upon payment of the land use
fee as required by this subsection, the operator may use and
occupy all Federal land within the mine permit area for such
uses as are approved in the mining permit if the uses are
undertaken in accordance with all applicable law.
(4) Adjustment.—Land use fees imposed under this
subsection shall be adjusted as necessary to correspond to
any adjustment in the claim maintenance fees imposed under
section 2412(a).
(5) Disposition of funds.—Any amounts received under this
subsection shall be deposited in the Abandoned Hardrock Mine
Fund established by section 2215(d)(1).
(g) Temporary Cessation of Operations.—
(1) In general.—An operator conducting mineral activities
under this subtitle may not temporarily cease mineral
activities for a period of greater than 180 days unless—
(A) the Secretary concerned has approved the temporary
cessation; or
(B) the temporary cessation is permitted under the
exploration or mining permit.
(2) Multiple temporary cessations.—The Secretary concerned
may approve more than 1 temporary cessation for mineral
activities under a permit.
(3) Interim management plan.—Any operator temporarily
ceasing mineral activities shall follow an interim management
plan approved by the Secretary concerned.
SEC. 2434. FINANCIAL ASSURANCES.
(a) In General.—Before beginning any mineral activities
requiring an exploration or mining permit under this title,
an operator shall provide to the Secretary concerned evidence
of a bond, surety, or other financial assurance approved by
the Secretary concerned in an amount determined, after public
notice and comment, by the Secretary concerned to be
sufficient to ensure the completion of reclamation under
section 2436 and the restoration of any land or water
adversely affected by the mineral activities if the work
(including any interim stabilization and infrastructure
maintenance activities) would be performed by the Secretary
concerned (or a third party retained by the Secretary
concerned) in the event of forfeiture.
(b) Land and Water Covered.—The financial assurance under
subsection (a) shall cover—
(1) all land within the initial permit area;
(2) all affected water that may require restoration,
treatment, or other management as a result of mineral
activities; and
(3) all land added and water affected pursuant to any
permit modification.
(c) Review.—Not later than 3 years after the date on which
an operator provides financial assurance in an amount
determined under subsection (a) and not later than every 3
years thereafter, the Secretary concerned shall—
(1) review the financial assurance to determine if the
amount of the financial assurance is adequate for purposes of
this section; and
(2) if the Secretary concerned determines that the amount
of the financial assurance is not adequate, adjust the amount
of the financial assurance in accordance with this section.
(d) Reduction.—
(1) In general.—The Secretary concerned may reduce the
amount of the financial assurance required if the Secretary
concerned determines that a portion of the reclamation is
completed in accordance with section 2436.
(2) Notice.—Before reducing or releasing the amount of
financial assurance pursuant to this subsection, the
Secretary concerned shall provide public notice and a
reasonable
opportunity for public notice and comment in accordance with
subsection (g).
(e) Incremental Financial Assurance.—
(1) In general.—The Secretary concerned may authorize
amounts of financial assurance for incremental mineral
activities if—
(A) no mineral activities are allowed beyond the activities
for which financial assurance is provided;
(B) the financial assurance for an increment covers all
reclamation costs within the permit area for the increment;
and
(C) the amount and terms of the financial assurance for
each increment are reviewed annually.
(2) Review.—Notwithstanding subsection (c), the Secretary
concerned shall—
(A) review at least on an annual basis the amount and terms
of the financial assurance for any increment; and
(B) adjust the financial assurance as appropriate.
(f) Duration.—The financial assurance required under this
section shall be held for the duration of the mineral
activities and for an additional period to cover the
responsibility of the operator for reclamation, long-term
maintenance, and effluent treatment as specified in
subsection (h).
(g) Release.—Subject to subsections (h) and (i), the
Secretary concerned may, after public notice and a reasonable
opportunity for public comment and after inspection, release
in whole or in part the financial assurance required under
this section if the Secretary concerned determines that—
(1) reclamation covered by the financial assurance has been
accomplished as required by this title and other applicable
law; and
(2) the terms and conditions of any other applicable
Federal and State requirements have been fulfilled.
(h) Release of Financial Assurance for Water.—If the
Secretary concerned does not require the establishment of a
trust fund or other long-term funding mechanism under
subsection (i), the portion of the financial assurance
attributable to the estimated cost of treatment of any
discharge or other water-related condition resulting from
mineral activities shall not be released until the public has
been provided notice and an opportunity to comment in
accordance with subsection (g) and—
(1) the discharge has ceased for a period of at least 5
years, as determined through ongoing monitoring and testing;
or
(2) if the discharge continues, the operator has met all
applicable effluent limitations and water quality standards
for a period of at least 5 years.
(i) Long-Term Financial Assurances.—
(1) In general.—Notwithstanding subsections (d) and (g),
if any discharge or other water-related condition resulting
from mineral activities requires treatment in order to meet
the applicable effluent limitations and water quality
standards, the financial assurance shall cover the estimated
cost of maintaining the treatment for the period that will be
needed after the cessation of mineral activities.
(2) Long-term funding mechanisms.—
(A) In general.—The Secretary concerned shall, if
determined necessary by the Secretary concerned, require the
operator to establish a trust fund or other funding mechanism
to provide financial assurances to ensure the continuation of
long-term treatment or other management to achieve water
quality standards and for other long-term, post-mining
maintenance or monitoring requirements.
(B) Amount.—The amount of funding shall be adequate to
provide for construction, long-term operation, maintenance,
or replacement of any treatment facilities and
infrastructure, for as long as the treatment and facilities
are needed after mine closure.
(C) Liability.—Nothing in this paragraph allows any person
to transfer any liability arising from mineral activities to
any other person.
(j) Report.—
(1) In general.—Not later than 3 years after the date of
enactment of this Act, the Secretary, in consultation with
the Secretary of Agriculture and the Administrator of the
Environmental Protection Agency, shall conduct a review and
submit to the Committee on Energy and Natural Resources of
the Senate and the Committee on Natural Resources of the
House of Representatives a report regarding the sufficiency
of financial assurances for locatable minerals activities
(including exploration and mining) on Federal land.
(2) Topics.—The report under paragraph (1) shall address—
(A) methods for establishing financial assurances levels;
(B) the type, level, and adequacy of financial assurances
required for exploration activities;
(C) for each mine on Federal land—
(i) the dates of approval of any plan of operation or
mining permit;
(ii) the acreage involved;
(iii) the expected life of the mine;
(iv) the type, level, and adequacy of financial assurance;
and
(v) whether the mine is expected to require long-term water
treatment or maintenance after mine closure;
(D) the effectiveness of various types of financial
assurances; and
(E) the availability of and costs associated with various
types of financial assurances.
(3) Recommendations.—The report under paragraph (1) shall
include any recommendations for modifications to Federal law
or applicable regulations to improve the effectiveness of
financial assurances for locatable mineral activities
described in that paragraph.
SEC. 2435. TRANSFER, ASSIGNMENT, OR SALE OF RIGHT.
The Secretary concerned shall approve the transfer,
assignment, or sale of rights of an exploration or mining
permit only if the successor in interest agrees in writing to
assume the liability and reclamation responsibilities
(including the financial assurance requirements under section
2434 (including applicable regulations)) established by the
permit under this title, without affecting the liability of
the transferor under any other law or exploration or mining
permit.
SEC. 2436. OPERATION AND RECLAMATION.
(a) In General.—The operator shall restore land and water
subject to mineral activities carried out under a permit
issued under this subtitle to a condition capable of
supporting—
(1) the uses that the land and water was capable of
supporting before surface disturbance by the operator; or
(2) other beneficial uses that conform to applicable land
use plans (including, if appropriate, the generation of
renewable energy), as determined by the Secretary concerned.
(b) Timing.—
(1) In general.—Reclamation activities shall be carried
out as contemporaneously as practicable with the conduct of
mineral activities.
(2) Temporary cessation.—If mineral activities are ceased
for a period other than a temporary cessation as approved by
the Secretary concerned, reclamation activities shall begin
immediately.
(c) Administration of Land.—Notwithstanding section
2432(b) of the Federal Land Policy and Management Act of 1976
(43 U.S.C. 1732(b)), the first section of the Act of June 4,
1897 (commonly known as the “Organic Act of 1897”) (16
U.S.C. 478), or the Forest and Rangeland Renewable Resources
Planning Act of 1974 (16 U.S.C. 1600 et seq.), and in
accordance with this subtitle and applicable law, unless
expressly stated otherwise in this title, the Secretary
concerned—
(1) shall ensure that mineral activities on any Federal
land that is subject to a mining claim, millsite claim, or
tunnel site claim are carefully controlled to prevent undue
degradation of public land and resources; and
(2) shall not grant permission to engage in mineral
activities if the Secretary concerned, after considering the
evidence, makes a determination that undue degradation would
result from those activities.
(d) Operation and Reclamation Standards.—The Secretary and
the Secretary of Agriculture shall jointly promulgate
regulations that carry out this title.
(e) Relationship to Other Laws.—The requirements of this
title shall be in addition to any requirements applicable to
mineral activities under—
(1) the Federal Land Policy and Management Act of 1976 (43
U.S.C. 1701 et seq.);
(2) the National Forest Management Act of 1976 (16 U.S.C.
472a et seq.); and
(3) the Act of June 4, 1897 (commonly known as the
“Organic Act of 1897”) (16 U.S.C. 473-482, 551).
SEC. 2437. STATE LAW.
Any reclamation, environmental, public health protection,
bonding, or inspection standard or requirement in State law
(including regulations) that meets or exceeds the
requirements of this title shall not be considered to be
inconsistent with this title.
SEC. 2438. INSPECTION AND MONITORING.
(a) Inspections.—
(1) In general.—The Secretary concerned shall make
inspections of mineral activities to ensure compliance with
this title.
(2) Timing.—The Secretary concerned shall establish the
frequency of inspections for mineral activities conducted
under a permit issued under this title, with the Secretary
concerned requiring not less than 1 complete inspection per
calendar quarter.
(3) Annual inspections.—After revegetation has been
established in accordance with a reclamation plan, the
Secretary concerned shall conduct not less than 2 complete
inspections per year.
(4) Seasonal activities.—The Secretary concerned shall
have the discretion to modify the inspection frequency for
mineral activities that are conducted on a seasonal basis,
except that the Secretary concerned shall require not less
than 2 complete inspections per calendar year.
(5) Financial assurance.—Inspections shall continue under
this subsection until the final release of financial
assurance.
(b) Monitoring.—The Secretary concerned shall require all
operators—
(1) to develop and maintain a monitoring and evaluation
system to identify compliance with all requirements of a
permit approved under this title; and
(2) to submit such reports as may be required by the
Secretary concerned.
SEC. 2439. TRIBAL CONSULTATION.
The Secretary concerned shall conduct active, meaningful,
and timely consultation with all applicable Indian Tribes in
accordance with the procedures established by the
Presidential Memorandum entitled “Uniform Standards for
Tribal Consultation” (87 Fed. Reg. 74479 (December 5, 2022))
before undertaking any mineral activities that may have a
direct, indirect, or cumulative impact on—
(1) the land (including allotted, ceded, or traditional
land) or interests of an Indian Tribe or a member of an
Indian Tribe;
(2) Tribal land, cultural practices, resources, or access
to traditional areas of cultural or religious importance;
(3) any portion of Federal land that shares a border with
Indian country;
(4) the protected rights of an Indian Tribe, regardless of
whether the protected rights are enumerated in a treaty,
including water, hunting, gathering, and fishing rights;
(5) the ability of an Indian Tribe to govern or provide
services to members of the Indian Tribe;
(6) the relationship between the Federal Government and an
Indian Tribe; or
(7) the trust responsibility of the Federal Government to
an Indian Tribe.
Subtitle D—Transition Rules, Administrative Provisions, and
Miscellaneous Provisions
SEC. 2441. TRANSITION RULES.
(a) Applicability.—
(1) In general.—Except as provided in paragraph (2),
section 2421(b), and section 2433(f), the requirements of
this title apply to any mining claim, millsite, or tunnel
site located under the general mining laws, before, on, or
after the date of enactment of this Act.
(2) Preexisting claim.—If a plan of operations is approved
or a notice of operations is filed for mineral activities on
any claim or site referred to in paragraph (1) before the
date of enactment of this Act—
(A) during the 10-year period beginning on the date of
enactment of this Act—
(i) mineral activities at the claim or site shall be
subject to the plan of operations or notice of operations;
and
(ii) if the Secretary concerned determines that any
modifications to the plan of operations are minor,
modification may be made in accordance with the laws
applicable before the date of enactment of this Act; and
(B) the operator shall bring the mineral activities into
compliance with this Act (including implementing regulations)
by the end of the 10-year period beginning on the date of
enactment of this Act.
(3) Fees.—Except as provided in sections 2421(b) and
2433(f), all fees required to be paid under this title shall
apply beginning on the date of enactment of this Act to—
(A) any mining claim, millsite, or tunnel site located
under the general mining laws (including production from the
claim or site) before, on, or after the date of enactment of
this Act; and
(B) all land covered by a plan of operations or a notice of
operations, exploration permit, or mining permit.
(b) Application of Title to Beneficiation and Processing of
Non-Federal Minerals on Federal Land.—
(1) In general.—This title (including the surface
management and operation requirements of subtitle C) shall
apply in the same manner and to the same extent to mining
claims, millsites, and tunnel sites used for beneficiation or
processing activities for any mineral without regard to
whether the legal and beneficial title to the mineral is held
by the United States.
(2) Applicability.—This subsection applies only to
minerals that—
(A) are locatable minerals; or
(B) would be locatable minerals if the legal and beneficial
title to the minerals were held by the United States.
SEC. 2442. ENFORCEMENT.
(a) Orders.—
(1) Notice of violation.—
(A) In general.—If the Secretary concerned determines that
any person is in violation of any surface management or
operation requirement under subtitle C or any regulation
promulgated to carry out such a requirement or any permit
condition required pursuant to subtitle C, the Secretary
concerned shall provide to the person a notice that describes
the violation and any necessary corrective actions.
(B) Abatement period.—
(i) In general.—Subject to clause (ii), a person that
receives notice under subparagraph (A) shall have not more
than 90 days after the date of receipt of the notice to abate
the violation.
(ii) Extension.—The Secretary concerned may extend the
period described in clause (i) if the person shows good cause
for the extension, as determined by the Secretary concerned.
(2) Cessation order.—
(A) In general.—The Secretary concerned shall immediately
order a cessation of mineral activities if the Secretary
concerned determines that any condition or practice exists,
or any person is in violation of any requirement of a permit
approved, or notice of operations submitted, under this
title, that is causing, or can reasonably be expected to
cause—
(i) an imminent danger to the health or safety of the
public; or
(ii) significant, imminent harm to land, air, water, or
fish or wildlife resources.
(B) Requirements.—
(i) In general.—A cessation order issued under
subparagraph (A) shall remain in effect until the Secretary
concerned—
(I) determines that the condition, practice, or violation
has been abated; or
(II) modifies, vacates, or terminates the cessation order.
(ii) Abatement.—In any cessation order issued under
subparagraph (A), the Secretary concerned shall—
(I) identify the steps necessary to abate the violation in
the most expeditious manner practicable; and
(II) require appropriate financial assurances to ensure
that the abatement obligations are met.
(C) Enforcement.—
(i) In general.—If the required abatement has not been
completed by the date that is 30 days after the date on which
an order is issued under subparagraph (A), the Secretary
concerned shall bring against the person failing to complete
the abatement an enforcement action that is most likely to
bring about abatement in the most expeditious manner
practicable, including seeking appropriate injunctive relief
to bring about abatement.
(ii) Effect.—Nothing in this subparagraph precludes the
Secretary concerned from taking alternative enforcement
action before the date described in clause (i).
(3) Modifications.—The Secretary concerned may modify,
vacate, or terminate any notice or order issued under
paragraph (1) or (2).
(4) Forfeiture.—
(A) In general.—If a person fails to abate a violation or
defaults on the terms of the permit, the Secretary concerned
shall forfeit the financial assurance for the permit as
necessary to ensure abatement and reclamation under this
title.
(B) Alternatives.—The Secretary concerned may prescribe
conditions under which a surety may perform reclamation in
accordance with the approved permit and applicable law
instead of forfeiture.
(C) Liability.—In the event of forfeiture, the claim
holder or operator, or a subsidiary, parent company,
corporation, or partner of the claim holder, or operator
shall be jointly and severally liable for any remaining
reclamation obligations under this title.
(b) Civil Penalties.—
(1) In general.—Subject to paragraph (2), any person that
violates any surface management or operation requirement
under subtitle C, any regulation promulgated to carry out
such a requirement, or any permit condition required pursuant
to subtitle C may be assessed a civil penalty by the
Secretary concerned.
(2) Cessation order.—If the violation leads to the
issuance of a cessation order under subsection (a)(2), the
Secretary concerned shall assess the civil penalty.
(3) Maximum amount.—The penalty shall not exceed $5,000
for each violation.
(4) Continuing violations.—Each day of continuing
violation may be considered a separate violation for purposes
of penalty assessments.
(5) Factors affecting amount.—In determining the amount of
the penalty for a violation by a person, the Secretary
concerned shall consider—
(A) the history of the person of previous violations;
(B) the seriousness of the violation, including any
irreparable harm to the environment and any hazard to the
health or safety of the public;
(C) whether the person was negligent; and
(D) the demonstrated good faith of the person charged in
attempting to achieve rapid compliance after notification of
the violation.
(6) Corporate liability.—If a corporate permittee is in
violation of a requirement of any surface management or
operations requirement under subtitle C of this title, any
regulation promulgated to carry out such a requirement, or
any permit condition required pursuant to subtitle C, or
fails or refuses to comply with a notice or an order issued
under subsection (a), any director, officer, or agent of the
corporation who willfully and knowingly authorized, ordered,
or carried out the violation, failure, or refusal shall be
subject to civil penalties, fines, and imprisonment that may
be imposed under a person under this subsection, subsection
(d) or (e).
(c) Administrative Review.—
(1) Compliance order.—Any person issued a notice of
violation or a cessation order under subsection (a) may apply
to the Secretary concerned for review of the notice or order
by the date that is not later than 30 days after receipt of
the notice or order.
(2) Civil penalty.—Any person who is subject to a civil
penalty assessed by the Secretary concerned under this
section may apply to the Secretary concerned for review of
the penalty by the date that is not later than 30 days after
the date on which the person receives notice of the penalty.
(3) Hearing.—The Secretary concerned shall provide an
opportunity for a hearing on the record subject to section
554 of title 5, United States Code, at the request of any
person that is—
(A) issued a notice of violation under subsection (a)(1);
(B) issued a cessation order under subsection (a)(2); or
(C) subject to civil penalties under subsection (b).
(d) Civil Action.—
(1) In general.—The Secretary concerned may submit to the
Attorney General a request to bring a civil action for
relief, including a permanent or temporary injunction or
restraining order and the imposition of civil penalties, in
any appropriate district court of the United States, if a
person—
(A) violates, fails, or refuses to comply with any notice
or order issued by the Secretary concerned under subsection
(a); or
(B) interferes with, hinders, or delays the Secretary
concerned in carrying out an inspection under section 2438.
(2) Relief.—
(A) In general.—The court hearing a civil action brought
under paragraph (1) shall
have the jurisdiction to provide any relief that the court
determines to be appropriate.
(B) Review.—Any relief granted by the court to enforce an
order under paragraph (1) shall continue in effect until the
date on which all proceedings for review of the order are
completed or terminated unless the court granting the relief
sets the relief aside.
(e) Criminal Penalties.—
(1) False statements; tampering.—
(A) In general.—A person shall, on conviction, be punished
by a fine of not more than $25,000, imprisonment for not more
than 1 year, or fine and imprisonment if the person willfully
and knowingly—
(i) makes any false material statement, representation, or
certification in, omits or conceals material information
from, or unlawfully alters, any mining claim, notice of
location, application, record, report, plan, or other
document filed or required to be maintained under this title;
or
(ii) falsifies, tampers with, renders inaccurate, or fails
to install any monitoring device or method required to be
maintained under this title.
(B) Second violation.—If a conviction of a person under
subparagraph (A) is for a violation committed after a first
conviction of the person under that subparagraph, punishment
shall be by a fine of not more than $50,000, imprisonment of
not more than 2 years, or fine and imprisonment.
(2) Knowing violations.—
(A) In general.—A person shall, on conviction, be punished
by a fine of not more than $25,000, imprisonment for not more
than 1 year, or both if the person willfully and knowingly—
(i) engages in mineral activities without a permit if
required under section 2432 or 2433; or
(ii) violates any surface management or operation
requirement under subtitle C (including any regulation
promulgated to carry out the requirement) or any requirement,
condition, or limitation of a permit issued under this title.
(B) Second violation.—If a conviction of a person under
subparagraph (A) is for a violation committed after the first
conviction of the person under that subparagraph, punishment
shall be a fine of not more than $50,000, imprisonment of not
more than 2 years, or both.
(f) Delegation.—Notwithstanding any other provision of
law, the Secretary may use personnel of the Office of Surface
Mining Reclamation and Enforcement or the Bureau of Land
Management to ensure compliance with this title.
SEC. 2443. EFFECT.
(a) Special Application of General Mining Laws.—
(1) In general.—Nothing in this title repeals or modifies
any Federal law (including regulations), order, or land use
plan in effect before the date of enactment of this Act that
prohibits or restricts the application of the general mining
laws, including laws that provide for special management
criteria for operations under the general mining laws as in
effect before the date of enactment of this Act, and laws
that provide protections of natural and cultural resources
and the environment that are equal to or greater than the
protections required under this title.
(2) Existing laws.—Any law described in paragraph (1)
shall remain in force and effect with respect to claims and
sites located or proposed to be located under this title.
(3) Mineral investigations.—Nothing in this Act applies to
or limits mineral investigations, studies, or other mineral
activities conducted by any Federal or State agency acting in
a governmental capacity under other authorities.
(b) Environmental Laws.—Nothing in this title affects or
limits any assessment, investigation, evaluation, or listing
under—
(1) the Comprehensive Environmental Response, Compensation,
and Liability Act of 1980 (42 U.S.C. 9601 et seq.); or
(2) the Solid Waste Disposal Act (42 U.S.C. 3251 et seq.).
(c) Effect on General Mining Laws.—
(1) In general.—This title supersedes the general mining
laws, except for the provisions of the general mining laws
relating to the location of mining claims that are not
expressly modified by this title.
(2) Limitation.—Nothing in this title supersedes,
modifies, amends, or repeals any provision of Federal law not
expressly superseded, modified, amended, or repealed by this
title, other than the general mining laws.
In section 2215(d)(2), add at the end the following:
(C) Other sources.—In addition to other amounts deposited
into the Fund under this paragraph, the Fund shall consist of
any amounts collected under sections 2412 (subject to the
requirements of subsection (c)(1) of that section), 2421,
2422, and 2433(f).
SA 6951. Mr. BENNET submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 299, strike lines 4 through 6 and insert the
following:
“(B) is located on the distribution system, any subsystem
thereof, or behind a customer meter;
SA 6952. Mr. BENNET submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Strike section 2215(a) and insert the following:
(a) Multiple Mill Sites.—Section 2337 of the Revised
Statutes (30 U.S.C. 42) is amended by adding at the end the
following:
“(c) Additional Mill Sites.—
“(1) Definitions.—In this subsection:
“(A) Mill site.—The term `mill site' means a location of
non-mineral public land that is open to location under the
mining laws and not contiguous to a vein or lode that is used
or occupied by the proprietor of that vein or lode for mining
or milling purposes.
“(B) Operations.—The term `operations' means prospecting,
mining, or processing, or uses reasonably incident to
prospecting, mining, or processing, conducted on a mining or
mill site claim.
“(C) Operator.—The term `operator' means a person
conducting or proposing to conduct operations.
“(D) Plan of operations.—The term `plan of operations'
means a plan of operations that an operator must submit and
the Secretary of the Interior or the Secretary of
Agriculture, as applicable, must approve before an operator
may begin operations, in accordance with, as applicable—
“(i) subpart 3809 of part 3800 of title 43, Code of
Federal Regulations (or successor regulations establishing
application and approval requirements); and
“(ii) part 228 of title 36, Code of Federal Regulations
(or successor regulations establishing application and
approval requirements).
“(E) Public land.—The term `public land' means land owned
by the United States that is open to location under sections
2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et
seq.), including—
“(i) land that is mineral-in-character (as defined in
section 3830.5 of title 43, Code of Federal Regulations (as
in effect on the date of enactment of this subsection));
“(ii) nonmineral land (as defined in section 3830.5 of
title 43, Code of Federal Regulations (as in effect on the
date of enactment of this subsection)); and
“(iii) land where the mineral character has not been
determined.
“(2) Authorization.—Notwithstanding subsections (a) and
(b), where public land is needed by the proprietor of a valid
lode or placer claim for operations in connection with any
valid lode or placer claim within the proposed plan of
operations—
“(A) the proprietor may locate and include within the plan
of operations the least number of mill site claims under this
subsection as the proprietor demonstrates, and the Secretary
determines, are reasonably necessary for its operations; and
“(B) the applicable valid lode, placer, or mill site claim
shall not be used for any purposes other than operations.
“(3) Mill sites convey no mineral rights.—A mill site
under this subsection does not convey mineral rights to the
locator.
“(4) Size of mill sites.—A location of a single mill site
under this subsection shall not exceed 5 acres.
“(5) Mill site and lode or placer claims on same tracts of
public land.—A mill site may be located under this
subsection on a tract of public land on which the claimant or
operator maintains a previously located lode or placer claim.
“(6) Effect on mining claims.—The location of a mill site
under this subsection shall not affect the validity of any
lode or placer claim, or any rights associated with such a
claim.
“(7) Patenting.—A mill site under this section shall not
be eligible for patenting.
“(8) Savings provisions.—Nothing in this subsection—
“(A) diminishes any right (including a right of entry,
use, or occupancy) of a claimant;
“(B) creates or increases any right (including a right of
exploration, entry, use, or occupancy) of a claimant on land
that is not open to location under the general mining laws;
“(C) modifies any provision of law or any prior
administrative action withdrawing land from location or
entry;
“(D) limits the right of the Federal Government to
regulate mining and mining-related activities pursuant to
applicable law;
“(E) restores any right (including a right of entry, use,
or occupancy, or right to conduct operations) of a claimant
that—
“(i) existed prior to the date on which the land was
closed to, or withdrawn from, location under the general
mining laws; and
“(ii) that has been extinguished by such closure or
withdrawal; or
“(F) modifies section 404 of division E of the
Consolidated Appropriations Act, 2024 (Public Law 118-42).”.
SA 6953. Mr. BENNET submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 74 of the amendment, strike line 20 and
all that follows through page 76, line 14, and insert the
following:
“(5) Remedy.—
“(A) In general.—Notwithstanding any other provision of
law, if a court determines that an authorization does not
comply with the requirements of this Act, the court may, in
order to redress that violation—
“(i) remand the applicable authorization to the agency—
“(I) taking into account the seriousness of the alleged
legal deficiency, including the likelihood that the
deficiency may be remedied by the agency on remand and that
the agency may reach the same decision consistent with
applicable law; and
“(II) with—
“(aa) specific instructions to correct errors or
deficiencies found by the court; and
“(bb) a reasonable schedule and deadline for the agency to
act on remand, which shall not exceed 180 days after the date
on which the order of the court was entered; or
“(ii) issue a preliminary injunction, in accordance with
subparagraph (B).
“(B) Preliminary injunctions.—
“(i) In general.—Subject to clause (ii), a court may
issue a preliminary injunction for the applicable
authorization under subparagraph (A)(ii) when—
“(I) there is a substantial likelihood the authorization
violates a Federal law other than—
“(aa) this Act; or
“(bb) division A of subtitle III of title 54, United
States Code;
“(II) necessary to prevent irreparable harm to the
plaintiff;
“(III) the balance of equities favors the plaintiff; and
“(IV) a preliminary injunction is in the public interest.
“(ii) Disruptive consequences.—In issuing a preliminary
injunction under clause (i), the court shall take into
account the potential disruptive consequences of issuing such
injunction, including impacts on public health and safety,
energy reliability, economic activity, ongoing projects, and
the public interest.
“(iii) Requirements.—A preliminary injunction issued by a
court under clause (i) shall last no longer than the time the
court finds is reasonably necessary—
“(I) for the correction of the violation described in
clause (i)(I); and
“(II) to prevent the irreparable harm described in clause
(i)(II).
On page 76, line 18 of the amendment, strike “(5)(A)” and
insert “(5)(A)(i)”.
On page 76, line 24 of the amendment, strike “(5)(A)” and
insert “(5)(A)(i)”.
Beginning on page 483 of the amendment, strike line 21 and
all that follows through page 485, line 18, and insert the
following:
“(C) Remedy.—
“(i) In general.—Notwithstanding any other provision of
law, if a court determines that an agency action does not
comply with the requirements of this division, the court may,
in order to redress that violation—
“(I) remand the applicable agency action to the Federal
agency—
“(aa) taking into account the seriousness of the alleged
legal deficiency, including the likelihood that the
deficiency may be remedied by the agency on remand and that
the agency may reach the same decision consistent with
applicable law; and
“(bb) with—
“(AA) specific instructions to correct errors or
deficiencies found by the court; and
“(BB) a reasonable schedule and deadline for the agency to
act on remand, which shall not exceed 180 days after the date
on which the order of the court was entered; or
“(II) issue a preliminary injunction, in accordance with
clause (ii).
“(ii) Preliminary injunctions.—
“(I) In general.—Subject to subclause (II), a court may
issue a preliminary injunction for the applicable agency
action when—
“(aa) there is a substantial likelihood the agency action
violates a Federal law (other than this division or the
National Environmental Policy Act of 1969 (42 U.S.C. 4321 et
seq.));
“(bb) necessary to prevent irreparable harm to the
plaintiff;
“(cc) the balance of equities favors the plaintiff; and
“(dd) a preliminary injunction is in the public interest.
“(II) Disruptive consequences.—In issuing a preliminary
injunction under subclause (I), the court shall take into
account the potential disruptive consequences of issuing such
injunction, including impacts on public health and safety,
energy reliability, economic activity, ongoing projects, and
the public interest.
“(III) Requirements.—The effective period of a
preliminary injunction issued by a court under subclause (I)
shall be not longer than the time the court finds is
reasonably necessary—
“(aa) for the correction of the violation described in
subclause (I)(aa); and
“(bb) to prevent the irreparable harm described in
subclause (I)(bb).
SA 6954. Mr. BENNET (for himself, Mr. Schiff, and Mr. Lujan) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 46, lines 11 through 13 of the amendment, strike
“after the date of publication of a notice of intent or
decision to prepare an environmental document” and insert
“after the close of the public comment period for an
environmental document prepared”.
SA 6955. Mr. BENNET (for himself, Ms. Cantwell, and Mr. Lujan) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 146 of the amendment, strike line 3 and
all that follows through page 155, line 25, and insert the
following:
“(B) Limitation.—For any project or agency action (as
referred to in section 7) that is solely within the
boundaries of 1 State, but that is within an area affected
that exceeds the boundaries of the State, to either another
State or to an Indian reservation located within the State or
another State, or affects the rights of an Indian Tribe, a
State that assumes responsibility under paragraph (4) for the
project or agency action (as referred to in section 7) shall
consult with—
“(i) if the project or agency action (as referred to in
section 7) exceeds the boundaries of the State to another
State—
“(I) if any other State has assumed responsibility under
that paragraph, the jurisdiction of which is within that area
affected, such State; or
“(II) if there is no State described in clause (i), the
Secretary; and
“(ii) if the project or agency action (as referred to in
section 7) exceeds the boundaries of the State to an Indian
reservation located within the State or another State, or
affects the rights of an Indian Tribe, the Tribal government
with jurisdiction over such Indian reservation or such Indian
Tribe, as applicable, in coordination with the Secretary.
“(3) Implementing regulation.—
“(A) In general.—Not later than 270 days after the date
of enactment of the Bipartisan American Affordability and
Jobs Act of 2026, the Secretary shall issue a proposed rule
to establish a program that would comply with the
requirements of this section and ensure that approved State
assumption programs adequately carry out the consultation
requirements under section 7 (referred to in this section as
the `implementing regulation').
“(B) Public comment.—The proposed rule issued under
subparagraph (A) shall be made available for public comment
for a period of not less than 60 days, during which the
Secretary shall solicit comment from States on the proposed
rule.
“(C) Limitation.—The rule issued under subparagraph (A)
shall not include any requirement that is not necessary to
carry out this section.
“(4) Assumption of responsibility.—
“(A) In general.—Subject to the requirements of this
section and the implementing regulation, with the written
agreement of the Secretary and a State, which may be in the
form of a memorandum of understanding, the Secretary may
assign, and the State may assume, the consultation
responsibilities of the Secretary within the boundary of the
State under subsections (a), (b), and (c) of section 7.
“(B) Certain projects and agency actions.—A State may not
assume responsibility under the program until the date on
which—
“(i) the implementing regulation takes effect;
“(ii) if the project or agency action has effects on an
Indian reservation and a Tribal government is consulted with
under paragraph (2)(B)(ii), the State has a formal Tribal
consultation policy; and
“(iii) the State certifies to the Secretary that the State
has secured the financial, legal, personnel, and other
resources described in subsection (c)(2)(B).
“(C) Federal responsibility.—Any responsibility of the
Secretary not explicitly assumed by the State by written
agreement under the program, including consultation with
applicable Indian Tribes, shall remain the responsibility of
the Secretary.
“(c) State Participation.—
“(1) Requirements for participating states.—Each State is
eligible to participate in the program if the State meets
each requirement described in this section and the
implementing regulation.
“(2) Application.—
“(A) In general.—A State seeking to participate in the
program shall submit to the Secretary an application at such
time, in such manner, and containing such information as the
Secretary may require, in accordance with subparagraph (B).
“(B) Requirements.—As part of the implementing
regulation, the Secretary shall establish requirements
relating to applications submitted by States under
subparagraph (A), including, at a minimum, requirements that
a State provide—
“(i) verification of the financial and legal resources
necessary to carry out the authority that may be granted to
the State under the program;
“(ii) verification of the personnel resources or a plan to
hire the personnel, not later than 1 year after the date on
which the application is approved, necessary to carry out the
authority that may be granted to the State under the program;
“(iii) verification that the State will waive sovereign
immunity for the responsibilities assumed by the State under
the program; and
“(iv) evidence of the notice and solicitation of public
comment by the State relating to participation of the State
in the program, including—
“(I) copies of comments received from that solicitation;
“(II) a brief summary of those comments; and
“(III) a description of ways in which those comments will
be incorporated by the State during the participation of the
State in the program.
“(C) Denial.—On denial of an application submitted by a
State under subparagraph (A)—
“(i) the Secretary shall—
“(I) respond to the State, in writing, identifying the
reasons for the denial, subject to the condition that such
reasons shall only include a determination by the Secretary
that the State did not demonstrate the legal, financial, or
personnel capability to assume responsibility under the
program; and
“(II) at the request of the State, provide technical
assistance to the State to address the reasons identified
under subclause (I); and
“(ii) the State may reapply in accordance with the
requirements of subparagraphs (A) and (B).
“(3) Public notice.—
“(A) In general.—Not less than 60 days before the date of
submission of an application of a State under paragraph
(2)(A), the State shall, in accordance with the applicable
public notice law of the State—
“(i) publish the complete application of the State; and
“(ii) provide an opportunity for public comment on the
application for a period of not less than 30 days.
“(B) Response to comments.—Notwithstanding any other
provision of law, a State shall be required to respond to
public comments received under subparagraph (A)(ii).
“(4) Selection criteria.—The Secretary shall approve the
application of a State submitted under paragraph (2)(A) if—
“(A) the Secretary determines that the State has
demonstrated the legal, financial, and current or future
personnel capability to assume the responsibility;
“(B) the Secretary has made an affirmative determination
that the State has met the requirements to implement the
program, as described in this section and the implementing
regulation; and
“(C) the head of the State agency enters into a written
agreement with the Secretary described in subsection (d)(1).
“(5) Failure to approve or deny application.—If the
Secretary fails to make a determination with respect to any
application submitted under paragraph (2)(A) within 180 days
after the date on which the Secretary receives that
application, the inaction shall be considered a failure to
act under section 107(g)(3) of the National Environmental
Policy Act of 1969 (42 U.S.C. 4336a(g)(3)).
“(d) Written Agreement.—
“(1) In general.—A written agreement referred to in
subsection (c)(4)(C) shall—
“(A) be executed by the Governor or the head of the State
agency that would assume responsibility under the program;
“(B) be in such form as the Secretary may prescribe;
“(C) provide that the State—
“(i) agrees to assume all responsibilities of the
Secretary described in subsection (b)(4);
“(ii) expressly consents, on behalf of the State, to
accept the jurisdiction of the Federal courts for the
compliance, discharge, and enforcement of any responsibility
of the Secretary assumed by the State;
“(iii) certifies that State laws (including regulations)
are in effect that—
“(I) authorize the State to take the actions necessary to
carry out the responsibilities being assumed; and
“(II) are comparable to section 552 of title 5, United
States Code, including providing that any decision regarding
the public availability of a document under those State laws
is reviewable by a court of competent jurisdiction;
“(iv) agrees to maintain the legal resources, financial
resources, and personnel capacity and expertise necessary to
carry out the responsibilities being assumed; and
“(v) agrees to meet the same deadlines for consultations
that the Secretary would be required to meet under—
“(I) section 7; and
“(II) section 107 of the National Environmental Policy Act
of 1969 (42 U.S.C. 4336a);
“(D) require the State to provide to the Secretary any
information the Secretary reasonably considers necessary to
ensure that the State is adequately carrying out the
responsibilities assigned to the State;
“(E) be renewable;
“(F) have a term of not more than 10 years; and
“(G) be published in the Federal Register not later than
15 days after execution.
“(2) Role of secretary.—The Secretary shall not delegate
the responsibilities of the Secretary with respect to
entering into a written agreement with a State under
paragraph (1).
“(e) Jurisdiction.—
“(1) In general.—The district courts of the United States
shall have exclusive jurisdiction over any civil action
against a State for failure to carry out any responsibility
of the State under the program.
“(2) Legal standards and requirements.—A civil action
under paragraph (1) shall be governed by the legal standards
and requirements that would apply in such a civil action
against the Secretary had the Secretary taken the actions in
question.
“(3) Intervention.—The Secretary shall have the right to
intervene in any action described in paragraph (1).
“(f) Effect of Assumption of Responsibility.—
“(1) In general.—A State that assumes responsibility
under subsection (b)(4) shall be solely responsible for
carrying out, in lieu of and without further approval of the
Secretary, the responsibilities assumed under that
subsection, until the Secretary or the State, as applicable,
terminates the participation of the State in the program in
accordance with paragraph (1) or (2) of subsection (k), as
applicable.
“(2) Permit or license applicant election.—
Notwithstanding a State assumption of responsibility under
subsection (b)(4), a permit or license applicant, or an
applicable Indian Tribe, may elect for the relevant Federal
SA 6956. Mr. BENNET (for himself, Mr. Schiff, and Mr. Lujan) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 47 of the amendment, strike line 4 and
all that follows through page 72, line 24, and insert the
following:
“(c) Public Review.—
“(1) Publication in federal register.—Each Federal agency
shall publish each draft environmental impact statement and
environmental assessment prepared for a proposed agency
action in the Federal Register.
“(2) Public comment; tribal consultation.—
“(A) In general.—Each draft environmental impact
statement and environmental assessment prepared for a
proposed agency action published under paragraph (1) shall
include a request for—
“(i) Tribal consultation, subject to the condition that
the Federal agency submits a written request for such Tribal
consultation to each relevant Indian Tribe after publication
of such draft document in the Federal Register; and
“(ii) public comment on alternatives or impacts on the
relevant information, studies, or analyses with respect to
the proposed agency action.
“(B) Comment and consultation period.—The lead agency
shall establish, with respect to each draft environmental
impact statement and environmental assessment published under
paragraph (1)—
“(i) a Tribal consultation period of not less than 45
days, to begin after the date on which the lead agency
submits a request for Tribal consultation with each relevant
Indian Tribe; and
“(ii) a public comment period of not less than 45 days, to
begin after the date on which the draft document is published
in the Federal Register.”;
(2) in subsection (e), by redesignating paragraphs (1) and
(2) as paragraphs (2) and (1), respectively, and moving the
paragraphs so as to appear in numerical order;
(3) in subsection (f)—
(A) in the subsection heading, by inserting “and Use of
Existing Documents” after “Preparation”;
(B) by striking “A lead agency” and inserting the
following:
“(1) In general.—A lead agency”; and
(C) by adding at the end the following:
“(2) Existing documents.—On the request of a project
sponsor, a lead agency shall consider and, as appropriate,
adopt, tier to, or incorporate by reference, the analysis and
documentation prepared for a proposed agency action or
similar agency action under Federal law or the laws and
procedures of a State or an Indian Tribe as the
documentation, or part of the documentation, required to
complete an environmental review, if the analysis and
documentation were developed pursuant to Federal law or the
laws and procedures of the State or Indian Tribe that serve a
similar function as compliance by
the lead agency with this Act, as determined by the lead
agency.”;
(4) in subsection (g)—
(A) by striking paragraph (1) and inserting the following:
“(1) In general.—
“(A) Environmental assessments.—
“(i) In general.—Except as provided in section
106(b)(1)(B) or paragraph (2), with respect to a proposed
agency action, a lead agency shall complete and make public
the environmental assessment, if applicable, not later than
the date that is 1 year after the earlier of, as applicable—
“(I) the date on which the lead agency determines that
section 106(b)(1)(A) requires the preparation of an
environmental assessment with respect to the proposed agency
action; and
“(II) the date on which the lead agency notifies the
project sponsor that the application for the proposed agency
action is complete.
“(ii) Additional requirements.—On completion of an
environmental assessment—
“(I)(aa) not later than 7 days after the date on which the
lead agency completes and makes public the environmental
assessment, the lead agency shall issue a finding of no
significant impact;
“(bb) not later than 90 days after the date on which the
lead agency completes and makes public the environmental
assessment, all Federal agencies participating in the
environmental review shall issue and make public a decision
on all outstanding authorizations for the proposed agency
action; and
“(cc) not later than 120 days after the date on which the
lead agency completes and makes public the environmental
assessment, all Federal agencies not participating in the
environmental review shall issue and make public a decision
on all outstanding authorizations for the proposed agency
action; or
“(II) not later than 7 days after the date on which the
lead agency completes the environmental assessment, the lead
agency shall publish a notice of intent to prepare an
environmental impact statement.
“(B) Environmental impact statements.—
“(i) In general.—Except as provided in paragraph (2),
with respect to a proposed agency action, the lead agency
shall publish an environmental impact statement, if
applicable, not later than the date that is 2 years after the
earlier of, as applicable—
“(I) the date on which the lead agency determines that
section 102(2)(C) requires the issuance of an environmental
impact statement with respect to the proposed agency action;
and
“(II) the date on which the lead agency notifies the
project sponsor that the application for the proposed agency
action is complete.
“(ii) Additional requirements.—
“(I) Record of decision.—Not later than 45 days after the
date on which the lead agency publishes an environmental
impact statement for a proposed agency action, the lead
agency shall issue a record of decision.
“(II) Issuance of authorizations.—
“(aa) In general.—Not later than 90 days after the date
on which the lead agency publishes an environmental impact
statement for a proposed agency action, all Federal agencies
participating in the environmental review shall issue a
decision on all outstanding authorizations for the proposed
agency action.
“(bb) Federal agencies not participating.—Not later than
120 days after the date on which the lead agency publishes an
environmental impact statement for a proposed agency action,
all Federal agencies not participating in the environmental
review shall issue and make public a decision on all
outstanding authorizations for the proposed agency action.
“(iii) Savings provision.—Nothing in this subparagraph
prohibits an agency from issuing an environmental impact
statement and record of decision in a single document.
“(C) Dispute resolution.—
“(i) Definition of eligible dispute or delay.—In this
subparagraph, the term `eligible dispute or delay' means a
dispute or delay with respect to the preparation of an
environmental document, a comment by a Federal agency
required by Federal law, or an authorization involving more
than 1 Federal agency for which a project sponsor sends a
notification to the Chairman under clause (ii).
“(ii) Notification of dispute.—The Chairman, in
consultation with each Federal agency participating in the
preparation of an environmental document for a proposed
agency action, shall, to the maximum extent practicable to
meet the deadlines established under this subsection and the
schedule developed under subsection (a)(1)(C)(iv), facilitate
resolution of an eligible dispute or delay, including an
anticipated delay, between those Federal agencies with
respect to preparation of an environmental document, a
comment by a Federal agency required by Federal law, or an
authorization not later than 30 days after the date of
receipt of a notification from a project sponsor.
“(iii) Determination of resolution.—If an eligible
dispute or delay, including an anticipated delay, described
in clause (ii) remains unresolved by the date that is 30 days
after the date on which a notification is received under that
clause, the Chairman, not later than 14 days after that date,
shall determine a resolution and order the relevant agencies
to the eligible dispute or delay, including an anticipated
delay, to act in accordance with that determination as soon
as practicable.
“(iv) Final resolution.—Notwithstanding any other
provision of law, any order given or action taken by the
Chairman in resolution of an eligible dispute or delay,
including an anticipated delay, under clause (iii)—
“(I) shall be final and conclusive;
“(II) shall not be subject to judicial review; and
“(III) shall, for purposes of judicial review of the
ultimate agency action and all other Federal law, constitute
full compliance with and satisfaction of any requirement for
interagency consultation, interagency coordination,
interagency concurrence, interagency authorization, or other
interagency procedural obligation under Federal law that is
the subject of the dispute or delay.”;
(B) in paragraph (2)—
(i) by inserting “applicable” before “deadline described
in paragraph (1)”;
(ii) by striking “in consultation with the applicant” and
inserting “with the approval of the project sponsor”; and
(iii) by striking “such environmental impact statement or
environmental assessment” and inserting “the applicable
environmental document”; and
(C) by striking paragraph (3) and inserting the following:
“(3) Failure to act.—
“(A) In general.—If, after 30 days have passed from the
date on which the Chairman determines that a key permitting
agency has not acted in accordance with a determination under
subparagraph (C)(iii) of paragraph (1) and causes a failure
to comply with a deadline in accordance with that paragraph
or an extended deadline in accordance with paragraph (2),
each relevant agency CERPO of the key permitting agency and
each career employee of the key permitting agency within the
Senior Executive Service (as defined in section 2101a of
title 5, United States Code) that has supervisory authority
over personnel in the key permitting agency and that has a
substantive role or responsibility in reviewing the
applicable environmental document or authorization that
remains unpublished or unissued, shall spend not less than 50
percent of the workweek, as determined pursuant to title 5,
United States Code, or other applicable law, to remedy the
failure.
“(B) No travel outside duty station.—
“(i) In general.—If, after 60 days have passed from the
date on which a deadline described in paragraph (1) or (2)
was failed to be met and the key permitting agency has not
published or made public the applicable environmental
document and has not issued all outstanding authorizations,
as described in those paragraphs, with respect to a proposed
agency action, the head of the relevant key permitting agency
shall not travel more than 25 miles from their official duty
station for the purposes of official business until the key
permitting agency has published or made public the applicable
environmental document and issued all outstanding
authorizations related to the proposed agency action that are
not in compliance with the requirements of this subsection.
“(ii) Corps of engineers.—For purposes of clause (i), the
Assistant Secretary of the Army for Civil Works shall be
considered to be the head of the Corps of Engineers.
“(C) Exception.—This paragraph shall not apply to the
Secretary of Defense.
“(4) Causes of action.—
“(A) Definition of court of competent jurisdiction.—In
this paragraph, the term `court of competent jurisdiction'
means—
“(i) if a court has jurisdiction over an applicable
proposed agency action pursuant to any other provision of
Federal law other than this Act, such court; or
“(ii) if no such court exists under clause (i)—
“(I) the district court of the United States for the
district in which a substantial part of the applicable
proposed agency action is situated; or
“(II) the United States District Court for the District of
Columbia.
“(B) Right to petition.—A project sponsor may obtain
judicial review of the compliance by a Federal agency with
the relevant deadline established under paragraph (1) or (2)
by filing a written petition in a court of competent
jurisdiction.
“(C) Exceptions.—The failure of a Federal agency to
publish in the Federal Register or make public an
environmental document or issue a decision on all necessary
authorizations shall not be considered failure to comply with
the deadlines established under paragraph (1) or (2) if the
Federal agency proves by clear and convincing evidence that
the failure was caused by—
“(i) a natural disaster, act of God, or act of war that
reasonably impaired the ability of the Federal agency to
comply with the relevant deadline established under paragraph
(1) or (2);
“(ii) a national emergency for which the only available
response is to delay the publication or making public the
environmental document or withhold decisions on the relevant
authorizations by the relevant deadline established under
paragraph (1) or (2);
“(iii) the publication or making public of the
environmental document or issuance of the authorization
violating the statutory obligations of the Federal agency;
“(iv) the completed application of the project sponsor
under section 110 being based on fraud or material
misrepresentations of fact;
“(v) the project sponsor withholding information necessary
to the ability of the Federal agency to comply with its
statutory obligations in publishing or making public an
environmental document or issuing a decision on all necessary
authorizations, after the Federal agency has made a
reasonable and timely request for such information; or
“(vi) a lapse in appropriations of more than 2 weeks
affecting 1 or more of the relevant agencies involved in the
preparation of the environmental documents or authorizations.
“(D) Remedy.—If a court of competent jurisdiction finds
that a Federal agency has failed to act in accordance with
this subsection, the court shall provide injunctive relief,
as appropriate, to give effect to this section and retain
jurisdiction to ensure compliance with any such relief.
“(E) Expedited procedures; time to decide.—The reviewing
court shall—
“(i) establish an expedited schedule for briefing and
disposition;
“(ii) issue a decision as expeditiously as practicable,
but not later than 120 days after the date on which the
petition is filed, absent extraordinary circumstances; and
“(iii) if the petition for relief is granted, issue an
order requiring a decision on the covered application not
later than 60 days after the date on which the order is
issued.”; and
(5) in subsection (h)—
(A) in paragraph (1)—
(i) in the matter preceding subparagraph (A), by striking
“the Committee on Natural Resources of the House of
Representatives and the Committee on Environment and Public
Works of the Senate” and inserting “the Chairman, not later
than April 15 of each year,”; and
(ii) by striking subparagraphs (A) and (B) and inserting
the following:
“(A) identifies each environmental document that was not
completed by each lead agency by the deadline described in
subsection (g) and provides an explanation for the failure to
meet the deadline;
“(B) identifies each environmental document the
preparation of which commenced before the date of enactment
of the Fiscal Responsibility Act of 2023 (Public Law 118-5;
137 Stat. 10) and is not yet complete at the time of the
report and provides an explanation for the failure to
complete the environmental document;
“(C) details the on-time completion rate of each key
permitting agency in adhering to applicable deadlines
described in subsection (g); and
“(D) details the progress of each key permitting agency in
adhering to those deadlines as compared to the completion
rate during the preceding year.”;
(B) in paragraph (2)—
(i) in subparagraph (A), by striking “such environmental
assessment and environmental impact statement” and inserting
“applicable environmental document”;
(ii) by striking subparagraph (B) and inserting the
following:
“(B) the earlier of—
“(i) with respect to an environmental assessment, as
applicable—
“(I) the date on which the lead agency determines that
section 106(b)(1)(A) requires the preparation of an
environmental assessment with respect to the proposed agency
action; and
“(II) the date on which the lead agency notifies the
project sponsor that the application for the proposed agency
action is complete; and
“(ii) with respect to an environmental impact statement,
as applicable—
“(I) the date on which the lead agency determines that
section 102(2)(C) requires the issuance of an environmental
impact statement with respect to the proposed agency action;
and
“(II) the date on which the lead agency notifies the
project sponsor that the application for the proposed agency
action is complete; and”; and
(iii) in subparagraph (C), by striking “environmental
assessment and environmental impact statement” and inserting
“environmental document”; and
(C) by adding at the end the following:
“(3) Compilation.—The Chairman shall—
“(A) compile the reports received by the heads of lead
agencies under paragraph (1) each year;
“(B) provide recommendations on how to improve the
performance of Federal agencies in adhering to the deadlines
described in subsection (g); and
“(C) submit that compilation of those reports and those
recommendations to the Committee on Environment and Public
Works of the Senate and Committee on Natural Resources of the
House of Representatives by not later than June 15 of the
applicable year.”.
SEC. 1107. PROGRAMMATIC ENVIRONMENTAL DOCUMENT.
Section 108 of the National Environmental Policy Act of
1969 (42 U.S.C. 4336b) is amended, in each of paragraphs (1)
and (2), by striking “5 years” and inserting “10 years”.
SEC. 1108. USE OF CATEGORICAL EXCLUSIONS BY OTHER AGENCIES.
Section 109 of the National Environmental Policy Act of
1969 (42 U.S.C. 4336c) is amended to read as follows:
“SEC. 109. USE OF CATEGORICAL EXCLUSIONS BY OTHER AGENCIES.
“(a) Agency Notification to Council.—
“(1) Available categorical exclusions.—Not later than 30
days after the date of enactment of the Bipartisan American
Affordability and Jobs Act of 2026, each Federal agency shall
submit to the Council a notification of all categorical
exclusions of the agency, specifying whether the categorical
exclusion was administratively created, established by
Congress, or adopted pursuant to subsection (c).
“(2) New categorical exclusions.—Not later than 7 days
after the date on which a Federal agency administratively
creates a categorical exclusion, a categorical exclusion
under the jurisdiction of the applicable Federal agency is
established by Congress, or the Federal agency adopts a
categorical exclusion of another Federal agency pursuant to
subsection (c), the Federal agency shall submit to the
Chairman a notification of the creation, establishment, or
adoption, as applicable, of that categorical exclusion.
“(b) Record of Categorical Exclusions.—The Council shall
maintain, on the website of the Council, an accurate and
publicly available record of each categorical exclusion
that—
“(1) is created by a Federal agency;
“(2) has been established by Congress; or
“(3) has been adopted by a Federal agency pursuant to
subsection (c).
“(c) Adoption of Categorical Exclusions by Other
Agencies.—
“(1) In general.—A Federal agency may adopt a categorical
exclusion of another Federal agency listed in the record
required under subsection (b) for which the categorical
exclusion was established consistent with this subsection.
“(2) Requirements.—In adopting a categorical exclusion
under paragraph (1), a Federal agency shall—
“(A) identify the categorical exclusion included on the
record described in subsection (b) that covers a category of
proposed agency actions or related actions;
“(B) consult with the Federal agency that established the
categorical exclusion or carries out a categorical exclusion
established by Congress to ensure that the proposed adoption
of the categorical exclusion to a category of proposed agency
actions is appropriate; and
“(C) publicly document adoption of the categorical
exclusion.”.
SEC. 1109. APPLICATIONS FOR AUTHORIZATIONS.
Section 110 of the National Environmental Policy Act of
1969 (42 U.S.C. 4336d) is amended to read as follows:
“SEC. 110. APPLICATIONS FOR AUTHORIZATIONS.
“(a) Application Sufficiency.—
“(1) Notification of complete or incomplete application.—
Unless a shorter deadline is specified by law, in connection
with a proposed agency action for which a project sponsor
submitted an application for an authorization to a Federal
agency, not later than 60 days after the date on which the
project sponsor submits the application, the Federal agency
shall—
“(A) document receipt of the application; and
“(B)(i) notify the project sponsor that the application is
complete; or
“(ii) notify the project sponsor that the application is
incomplete and request, in writing, any additional
information that the Federal agency needs to determine that
the application is complete.
“(2) Agency determination.—
“(A) Complete determination.—If a Federal agency
determines that an application is complete under paragraph
(1)(B)(i), the Federal agency shall, not later than 60 days
after the date on which the Federal agency makes that
determination, unless a shorter period is provided for by
law—
“(i) notify the project sponsor that the Federal agency
has determined that—
“(I) the proposed agency action—
“(aa) is excluded pursuant to a categorical exclusion; or
“(bb) is not a major Federal action; or
“(II) no further agency action is required;
“(ii) notify the project sponsor that the agency has
determined that preparation of an environmental assessment is
necessary; or
“(iii) issue a notice of intent to prepare an
environmental impact statement for the proposed agency
action.
“(B) Incomplete determination.—If a Federal agency
requests additional information under paragraph (1)(B)(ii),
the deadlines described in subparagraph (A) shall be based on
the date on which the Federal agency receives the additional
information instead of the date on which the determination is
made.
“(3) Applicability to other law.—If a law provides for a
shorter period with respect to a determination by a Federal
agency that an application submitted by a project sponsor to
the Federal agency is complete—
“(A) nothing in this Act supersedes such shorter period;
and
“(B) the Federal agency shall commence its reviews under
sections 106 and 107 and paragraph (2)(A) on receipt of a
notice of staking or similar pre-permit submission
notification.
“(b) Additional Application Information.—Unless otherwise
required by law, in addition to any information required by a
Federal agency for an application for authorization for a
proposed agency action requiring the preparation of an
environmental document, a project sponsor shall submit to the
applicable Federal agency—
“(1) a list of each known Federal, State, Tribal, or local
authorization required to complete the proposed agency
action;
“(2) a record of stakeholder engagement for the proposed
agency action as of the date of the application; and
“(3) a brief description of a statement of purpose and
need for the proposed agency action, including, to the extent
practicable, the location of the project and any known
alternatives.”.
SEC. 1110. JUDICIAL REVIEW.
Title I of the National Environmental Policy Act of 1969
(as amended by section 1102(b)(1)) is amended by inserting
after section 110 (42 U.S.C. 4336d) the following:
“SEC. 111. JUDICIAL REVIEW.
“(a) Definition of Claim.—In this section, the term
`claim' means a claim that—
“(1) is filed on or after the date of enactment of the
Bipartisan American Affordability and Jobs Act of 2026; and
“(2) seeks judicial review under any provision of Federal
law of an authorization based on a claim that an
environmental review failed to be properly conducted pursuant
to the requirements of this Act.
“(b) Limitations on Claims.—Notwithstanding any other
provision of law, a claim shall be barred unless the claim—
“(1) is filed not later than 150 days after the date on
which, unless a shorter deadline is specified under Federal
law—
“(A) in the case of a claim in which an environmental
impact statement was prepared, the applicable authorization
was published in the Federal Register; and
“(B) in the case of any other claim, the authorization was
made public;
“(2) in the case of an environmental document for which an
opportunity for comment was provided, and for which the
opportunity for public comment occurs after the date of
enactment of the Bipartisan American Affordability and Jobs
Act of 2026, the claim is filed by a party that submitted a
substantive comment during a public comment period associated
with that environmental document, with such comment being
SA 6957. Mr. BENNET (for himself, Mr. Schiff, and Mr. Lujan) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 449, strike line 1 and all that follows
through page 483, line 7, and insert the following:
(2) Tribal programs.—
(A) In general.—Chapter 3027 of title 54, United States
Code, is amended by adding at the end the following:
“Sec. 302707. Tribal program support and coordination
“(a) Self-determination.—
“(1) In general.—A tribal historic preservation program
approved under section 302702 shall be considered an exercise
of the inherent governmental authority of the Indian tribe.
“(2) Written consent.—Nothing in this section authorizes
the Secretary to assume, reassign, or perform functions of a
Tribal Historic Preservation Officer without the express
written consent of the governing body of the applicable
Indian tribe.
“(b) Technical Assistance.—At the request of an Indian
tribe, the Secretary, in consultation with the Tribal
Historic Preservation Officer, shall provide technical
assistance, training, and capacity support to promote timely
and effective administration of the tribal historic
preservation program.
“(c) Existing Audits.—
“(1) In general.—An audit satisfying section 5 of the
Indian Self-Determination and Education Assistance Act (25
U.S.C. 5305) shall satisfy any fiscal-audit requirement
applicable to funds provided for a tribal historic
preservation program.
“(2) No additional program evaluation.—No additional
recurring program evaluation or fiscal audit of a tribal
historic preservation program may be required solely by
reason of approval of a tribal historic preservation program
under section 302702.
“(d) Due Process; No Takeover.—
“(1) Definition of covered deficiency.—In this
subsection, the term `covered deficiency' means an alleged
material misuse of Federal funds by a tribal historic
preservation program.
“(2) Requirements.—Before withholding funds from a tribal
historic preservation program for a covered deficiency, the
Secretary shall—
“(A) provide to the tribal historic preservation program
written notice of the covered deficiency;
“(B) identify the specific covered deficiency of the
tribal historic preservation program in the notice provided
under subparagraph (A);
“(C) offer technical assistance to tribal historic
preservation program; and
“(D) allow not less than 2 years to cure the specific
covered deficiency identified under subparagraph (B).
“(3) Narrowly tailored remedy.—Any remedy of the
Secretary under paragraph (2) with respect to a covered
deficiency under that paragraph—
“(A) shall be narrowly tailored to the affected funds; and
“(B) shall not include Federal assumption of Tribal
Historic Preservation Officer functions.”.
(3) Conforming amendment.—Section 302702 of title 54,
United States Code, is amended, in the matter preceding
paragraph (1), by striking “302302 and 302303” and
inserting “302303 and 302707”.
(4) Clerical amendment.—The table of sections for chapter
3027 of title 54, United States Code, is amended by adding at
- the end the following:
- “302707. Tribal program support and coordination.”.
(b) Effect of Undertaking on Historic Property.—Section
306108 of title 54, United States Code, is amended—
(1) in the second sentence, by striking “The head of the
Federal agency” and inserting the following:
“(2) Opportunity to comment.—The head of any Federal
agency described in paragraph (1)”;
(2) in the first sentence, by striking “The head of any
Federal agency having direct or indirect” and inserting the
following:
“(b) Adverse Effect of the Undertaking.—
“(1) In general.—The head of any Federal agency having
direct”;
(3) by inserting before subsection (b) (as so designated)
the following:
“(a) Definitions.—In this section:
“(1) Adverse effect of the undertaking.—
“(A) In general.—The term `adverse effect of the
undertaking' means a consequence of an undertaking that—
“(i) is reasonably foreseeable; and
“(ii) directly or indirectly alters the characteristics of
a historic property in a manner that would diminish the
integrity of the location, design, setting, materials,
workmanship, or association of the historic property.
“(B) Exclusions.—The term `adverse effect of the
undertaking' does not include—
“(i) any visual, atmospheric, or audible element, unless
the visual, atmospheric, or audible element would directly or
indirectly diminish the eligible characteristics of the
historic property or the integrity of a property of
traditional religious or cultural importance;
“(ii) any temporary alteration to a historic property that
is limited to the time it takes to complete an undertaking,
unless the temporary alteration would directly or indirectly
diminish the integrity of a property of traditional religious
or cultural importance; or
“(iii) any effect on a portion of the historic property
other than an adverse effect to the character-defining
features, including contributing elements, cultural-use
locations, or access points, that do not contribute to the
qualification of the property for inclusion on the National
Register.
“(2) Area of potential effects.—
“(A) In general.—The term `area of potential effects'
means the area within which an undertaking may cause an
effect described in paragraph (1)(A).
“(B) Exclusion.—The term `area of potential effects' does
not include any geographic area affected solely by a portion
of a project, activity, or program that is not subject to
substantial Federal control and responsibility.
“(3) Made public.—The term `made public', with respect to
a final agency action, means that the final agency action is
published in a single location on the primary website of the
applicable Federal agency with—
“(A) hyperlinks to the final agency action prominently
displayed on the website; and
“(B) the date of initial publication of the final agency
action displayed and maintained on the website.
“(4) Reasonably foreseeable.—
“(A) In general.—The term `reasonably foreseeable', with
respect to an adverse effect of the undertaking, means an
effect of the undertaking that shares a reasonably close
causal relationship to, and is proximately caused by, the
undertaking being considered.
“(B) Exclusions.—The term `reasonably foreseeable', with
respect to an adverse effect of the undertaking, does not
include—
“(i) any adverse effect of the undertaking that is
speculative or attenuated from the undertaking; or
“(ii) any adverse effect of the undertaking that—
“(I) relates to an unrelated prior, separate existing, or
potential future undertaking; and
“(II) is not foreseeable.
“(5) State historic preservation officer.—The term `State
Historic Preservation Officer' means—
“(A) the official designated and appointed pursuant to
section 302301(1) to administer the State Historic
Preservation Program; or
“(B) a representative designated to act for the official
described in subparagraph (A).
“(6) Substantial federal control and responsibility.—The
term `substantial Federal control and responsibility' means
the ability of the Federal official to modify or condition
the project, activity, or program in a manner that avoids,
minimizes, or mitigates adverse effects of the undertaking on
a historic property.
“(7) Tribal historic preservation officer.—The term
`Tribal Historic Preservation Officer' means the Tribal
official designated pursuant to section 302702(2) who has
assumed the duties of the State Historic Preservation Officer
for purposes of compliance with subsection (b) within the
boundaries of the applicable tribal land.
“(8) Undertaking.—
“(A) In general.—The term `undertaking' means a project,
activity, or program that—
“(i) requires a Federal permit, license, or approval; and
“(ii) is subject to substantial Federal control and
responsibility.
“(B) Exclusion.—The term `undertaking' does not include—
“(i) any portion of a project, activity, or program over
which a Federal agency does not exercise substantial control
or responsibility;
“(ii) a project, activity, or program for which the only
Federal involvement is a loan, loan guarantee, grant
(including a capitalization grant), cost-share award, or
other form of financial assistance that is not for the
primary purpose of historic preservation, subject to the
condition that this clause shall not apply to a project
that—
“(I) receives more than $10,000,000 of financial
assistance from the Department of Transportation; or
“(II) would directly or indirectly diminish the integrity
of a property of traditional religious or cultural
importance;
“(iii) a project, activity, or program that consists of
minor or routine restoration, rehabilitation, repair,
maintenance, stabilization, hazardous material remediation,
structure hardening, provision of handicapped access, or
other similar minor or routine projects that do not diminish
the integrity of a historic property, unless the project,
activity, or program would directly or indirectly diminish
the integrity of a property of traditional religious or
cultural importance;
“(iv) a project, activity, or program that is a survey or
work completed to conduct consultations;
“(v) unless the project, activity, or program would
directly or indirectly diminish the integrity of a property
of traditional religious or cultural importance, a project,
activity, or program that—
“(I) is any alteration to a historic property that is
necessary for public safety; and
“(II) does not diminish the integrity of the historic
property;
“(vi) an activity or decision that is non-discretionary
and made in accordance with the statutory authority of the
Federal agency;
“(vii) any—
“(I) renewal of a special use permit on the expiration of
the special use permit if no substantive changes are made
from the original special use permit; or
“(II) transfer of ownership of a special use permit;
“(viii) the implementation of, or any act or omission
under, a memorandum of agreement, programmatic agreement, or
other instrument executed in connection with compliance with
this section, after the date on which a determination has
been made under subsection (c); or
“(ix) the continuation, operation, maintenance, or post-
approval implementation of a project, activity, or program
after the determination has been made under subsection (c),
except that a subsequent discrete decision of a Federal
agency to amend or materially modify a determination made
under subsection (c) is itself an undertaking, to the extent
provided in this section.”; and
(4) by adding at the end the following:
“(c) Consultation.—
“(1) In general.—The responsibilities of a Federal agency
under this section shall be limited to historic properties
within the area of potential effects identified by the
Federal agency.
“(2) Initiation and report.—
“(A) Determination.—
“(i) In general.—Not later than 30 days after the date of
receipt of a request for review of a proposed project,
activity, or program under this section, the applicable
Federal official shall determine whether the proposed
project, activity, or program is an undertaking subject to
the requirements of this section.
“(ii) Applicability of other provisions.—Subject to
paragraph (7)(B)(ii), if the review of an undertaking is
governed by a Federal agency program alternative established
under section 800.14 of title 36, Code of Federal Regulations
(or a successor regulation), or this section, including an
alternate procedure, programmatic agreement, exempted
category, standard treatment, or program comment, the
applicable Federal official shall carry out this paragraph in
accordance with that program alternative, subject to
paragraph (4), subparagraphs (A) and (B) of paragraph (5),
and paragraph (6).
“(B) Report on undertaking.—
“(i) In general.—If the applicable Federal official
determines under subparagraph (A) that the proposed project,
activity, or program is an undertaking, the applicable
Federal official shall prepare a report that includes a
preliminary assessment of the following:
“(I) A determination regarding the area of potential
effects for the undertaking.
“(II) The dentification of any historic properties within
the area of potential effects.
“(III) A description of the adverse effects, if any, of
the undertaking on historic properties within the area of
potential effects.
“(ii) Mandatory solicitation of information.—On making a
determination under subparagraph (A)(i), the applicable
Federal official shall seek, discuss, and incorporate
information from each applicable State Historic Preservation
Officer, Tribal Historic Preservation Officer, Indian tribe,
or Native Hawaiian organization, local government, and
project, activity, or program applicant, if the information
is communicated to the applicable Federal official not later
than 90 days after the date on which the Federal official
submits a request for such information.
“(iii) Consultation.—
“(I) In general.—If the applicable Federal official
determines under subparagraph (A) that a proposed project,
activity, or program is an undertaking that is not subject to
subparagraph (A)(ii), not later than 60 days after the date
of the determination under subparagraph (A), the applicable
Federal official shall complete the report in accordance with
subclause (II) and initiate consultation on the preliminary
assessment by submitting the report for review to the
applicable State Historic Preservation Officer, Tribal
Historic Preservation Officer, Indian tribe, Native Hawaiian
organization, local government, and project, activity, or
program applicant under this division.
“(II) Requirements.—A complete report under this clause—
“(aa) shall identify the area of potential effects for the
undertaking;
“(bb) shall identify whether any historic properties are
present within the applicable area of potential effects;
“(cc) if a historic property is present within the area of
potential effects, shall—
“(AA) consider only the portion of the property within the
area of potential effects;
“(BB) document any adverse effects of the undertaking, or
determine that the proposed project, activity, or program is
an undertaking for which there are no adverse effects of the
undertaking; and
“(CC) identify prudent and feasible measures within the
area of potential effects to avoid, minimize, or mitigate any
adverse effects of the undertaking; and
“(dd) shall not identify measures described in item
(cc)(CC) that are not prudent or would occur outside the area
of potential effects, unless the project, activity, or
program applicant has submitted a written request for
alternative mitigation measures.
“(3) Determination.—
“(A) In general.—Not later than 90 days after the date of
submission of a report under paragraph (2)(B)(iii)(I), unless
a shorter timeline is agreed to by the State Historic
Preservation Officer or Tribal Historic Preservation Officer
and each applicable Indian tribe, Native Hawaiian
organization, and local government, the applicable Federal
official, in consultation with the applicable State Historic
Preservation Officer and Tribal Historic Preservation
Officer, Indian tribe, Native Hawaiian organization, and
local government under this division, shall—
“(i) determine, based on the report, that—
“(I)(aa) historic properties are not present; and
“(bb) the obligations of the applicable Federal official
under this section shall be satisfied; or
“(II)(aa) there are no adverse effects of the undertaking
that would diminish the integrity of the historic property to
the extent that the historic property would be made
ineligible for listing on the National Register; and
“(bb) the obligations of the Federal official under this
section shall be satisfied; or
“(ii) reach an agreement with the applicable State
Historic Preservation Officer and Tribal Historic
Preservation Officer, Indian tribe, Native Hawaiian
organization, local government, and project, activity, or
program applicant that describes how the adverse effects of
the undertaking would be avoided, minimized, or mitigated.
“(B) No agreement.—
“(i) Consultation period.—If an agreement is not reached
under clause (ii) of subparagraph (A) within the 90-day
period described in that subparagraph, during the 60-day
period beginning immediately after the end of that 90-day
period, there shall be a period of consultation among the
applicable Federal official, State Historic Preservation
Officer and Tribal Historic Preservation Officer, Indian
tribe, Native Hawaiian organization, and local government.
“(ii) Formal advisory comments.—
“(I) Request.—If an agreement is not reached under clause
(i) within the 60-day period described in that clause, the
head of the Federal agency shall request formal advisory
comments from the Council with respect to the applicable
undertaking.
“(II) Response.—Not later than 45 days after the date on
which the Council receives a request under subclause (I), the
Council shall submit to the head of the Federal agency the
formal advisory comments requested.
“(III) Final determination.—Not later than 30 days after
the date on which the head of the Federal agency receives the
formal advisory comments from the Council under subclause
(II), the head of the Federal agency (or an agency official
delegated by the head of the Federal agency) shall make a
final determination on the undertaking that demonstrates how
the formal advisory comments were considered.
“(IV) Satisfaction of obligations.—Effective on the date
on which a final determination is made under subclause (III),
the obligations of the applicable Federal agency under this
section shall be satisfied.
“(C) Multiple determinations.—If an undertaking involves
multiple corridors or large land areas, the applicable
Federal official may issue multiple determinations under
subparagraph (A) in a phased process.
“(4) Lead federal agency.—
“(A) In general.—If more than 1 Federal agency has
jurisdiction over a project, activity, or program that is
determined to be an
undertaking, the 1 or more applicable Federal agencies shall
designate a lead Federal agency to comply with the
requirements of this subsection.
“(B) Presumption.—If a lead Federal agency has been
designated for purposes of complying with the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.),
the lead Federal agency designated for purposes of complying
with that Act shall serve as the lead Federal agency for
purposes of this subsection unless the applicable Federal
agencies jointly determine that another Federal agency is
better suited to carry out the responsibilities of the lead
Federal agency under this subsection.
“(C) Written request; designation by secretary.—If the 1
or more applicable Federal agencies do not designate a lead
Federal agency under subparagraph (A) by the date that is 15
days after the date on which the applicable Federal agencies
receive notice of a proposed undertaking—
“(i) in the case of an undertaking initiated by an
applicant, the applicant may submit to the Secretary a
written request for the Secretary to designate a lead Federal
agency; or
“(ii) in the case of an undertaking initiated by the
Federal Government, the Secretary shall designate a lead
Federal agency.
“(D) Failure to sign programmatic agreement.—The failure
of the head of a Federal agency that is not the lead Federal
agency to be a signatory to a programmatic agreement under
this subsection shall not affect the conduct of the project,
activity, or program subject to the programmatic agreement.
“(5) Timelines for consultation.—
“(A) Initiation.—If a project, activity, or program
requires the preparation of an environmental document under
the National Environmental Policy Act of 1969 (42 U.S.C. 4321
et seq.), any consultation with respect to the project,
activity, or program required for purposes of this subsection
shall initiate not later than the date of initiation of the
environmental review.
“(B) Completion.—
“(i) In general.—The consultation process initiated under
subparagraph (A) shall be completed not later than the date
on which the applicable environmental document under section
107(g) of the National Environmental Policy Act of 1969 (42
U.S.C. 4336a(g)) is completed with respect to the
undertaking, unless the Secretary approves an extension of
the deadline due to extraordinary circumstances beyond the
control, and not due to any actions, of the consulting
parties.
“(ii) Failure to complete by deadline.—If the
consultation process initiated under subparagraph (A) is not
complete by the later of the deadline established under
clause (i) or the date extended under that clause, the
consultation requirement for purposes of this subsection,
each employee within the Senior Executive Service (as defined
in section 2101a of title 5) that has supervisory authority
over personnel in a relevant Federal agency that has a
substantive role or responsibility in the consultation, shall
spend not less than 50 percent of the workweek, as determined
pursuant to title 5 or other applicable law, to remedy the
failure.
“(iii) Causes of action.—
“(I) Right to petition.—A project, activity, or program
applicant may obtain judicial review of the compliance by a
Federal agency with the deadline established under clause (i)
by filing a complaint with a court of competent jurisdiction
in which a substantial part of the applicable proposed
project, activity, or program is situated.
“(II) Remedy.—If a court of competent jurisdiction under
this clause finds that a Federal agency has failed to act in
accordance with this subsection, the court shall—
“(aa) provide injunctive relief, as appropriate, to give
effect to this subsection;
“(bb) retain jurisdiction to ensure compliance with any
such relief; and
“(cc) set a schedule and deadline for the Federal agency
to act as soon as practicable with respect to the injunctive
relief, which shall not exceed 90 days from the date on which
the applicable order of the court is issued.
“(III) Expedited procedures; time to decide.—The
reviewing court under this clause shall—
“(aa) establish an expedited schedule for briefing and
disposition; and
“(bb) issue a decision as expeditiously as practicable,
but not later than 120 days, after the date on which the
applicable complaint is filed under subclause (I), absent
extraordinary circumstances.
“(C) Participation of state historic preservation officer
or tribal historic preservation officer.—
“(i) In general.—If the State Historic Preservation
Officer, Tribal Historic Preservation Officer, Indian tribe,
Native Hawaiian organization, or local government fails to
respond within 30 days, or 90 days, if paragraph (6) applies,
of receipt of a request for review of any report or finding
by the applicable Federal official, the applicable Federal
official shall proceed to the determination under paragraph
(3)(A).
“(ii) Subsequent involvement.—If a State Historic
Preservation Officer, Tribal Historic Preservation Officer,
Indian tribe, Native Hawaiian organization, or local
government that fails to respond by the deadline described in
clause (i) re-enters the consultation process required for
purposes of this subsection, the applicable Federal
official—
“(I) shall not be required to reconsider any previous
report or finding; and
“(II) may consult with the Council in lieu of the State
Historic Preservation Officer or Tribal Historic Preservation
Officer.
“(iii) No substantive objections.—If the State Historic
Preservation Officer, Tribal Historic Preservation Officer,
Indian tribe, Native Hawaiian organization, local government,
or Council, as applicable, has entered the consultation
process required for purposes of this subsection, but does
not provide any substantive objections by the date on which
the consultation period concludes, the applicable Federal
official shall proceed to the determination under paragraph
(3)(A).
“(iv) Substantive objections.—If the State Historic
Preservation Officer, Tribal Historic Preservation Officer,
Indian tribe, Native Hawaiian organization, local government,
or Council, as applicable, has entered the consultation
process required for purposes of this subsection and provides
substantive objections or other information with respect to
any of the matters included in the applicable report under
subitems (AA) through (DD) of paragraph (2)(B)(iii)(II)(cc)
by the date on which the consultation period concludes, not
later than 30 days after the date of receipt of the
objections or information, the applicable Federal official—
“(I) shall provide a response explaining how the Federal
agency has considered the substantive objections or
information in the report; and
“(II) may provide a supplemental report.
“(v) Fulfillment of consulting obligations.—On the
provision of a response under clause (iv)(I), the obligation
of the applicable Federal official to consult for purposes of
this subsection shall be considered to be fulfilled with
respect to the report.
“(vi) Agreement.—If a State Historic Preservation Officer
or Tribal Historic Preservation Officer fails to respond to
an agreement under this subparagraph, the applicable Federal
official may enter into the agreement with the Council in
lieu of the State Historic Preservation Officer or Tribal
Historic Preservation Officer.
“(vii) Notice of final agency action.—For any undertaking
for which a report under paragraph (2)(B) is required, the
applicable Federal official that completed the report and
conducted consultation pursuant to that paragraph shall
notify, as applicable, each applicable State Historic
Preservation Officer, Tribal Historic Preservation Officer,
Indian tribe, Native Hawaiian organization, and local
government of the final agency action with respect to which
the report was prepared.
“(6) Tribally identified historic property.—
“(A) Notice.—
“(i) In general.—At any time before final agency action,
an Indian tribe, Tribal Historic Preservation Officer, or
Native Hawaiian organization may provide written notice that
an undertaking may affect any potential property of
traditional religious or cultural importance to the Indian
tribe or Native Hawaiian organization.
“(ii) Requirement.—A notice under clause (i) shall
identify the potential historic property and the nature of
the concern with as much specificity as the Indian tribe,
Tribal Historic Preservation Officer, or Native Hawaiian
organization determines can be provided, consistent with the
protection of sensitive information.
“(B) Effect.—On receipt of a notice under subparagraph
(A)—
“(i) each otherwise applicable 30-day period for an Indian
tribe, Tribal Historic Preservation Officer, or Native
Hawaiian organization to provide information, review,
respond, or object under this section shall be 90 days for
the Indian tribe, Tribal Historic Preservation Officer, or
Native Hawaiian organization;
“(ii) the agency shall promptly provide the Indian tribe,
Tribal Historic Preservation Officer, or Native Hawaiian
organization with the preliminary analysis or consideration
by the agency of the undertaking description, maps, area of
potential effects, identification materials, effect findings,
and proposed avoidance, minimization, or mitigation measures;
“(iii) the agency shall engage in consultation with the
Indian tribe, Tribal Historic Preservation Officer, or Native
Hawaiian organization to resolve the concerns raised in the
Tribal notification, including consultation between the head
of the agency or an Assistant Secretary-level designee and
the elected Tribal leadership (or a designee) immediately on
Tribal notification;
“(iv) the failure to identify the resource before
initiation of review shall not waive the consideration of
information timely submitted under subparagraph (A); and
“(v) the agency shall protect information identified by
the Indian tribe, Tribal Historic Preservation Officer, or
Native Hawaiian organization as sensitive to the maximum
extent permitted under section 307103 and any other
applicable law.
“(C) Judicial review; preliminary injunction.—For a claim
brought by an Indian tribe, Tribal Historic Preservation
Officer, or Native Hawaiian organization concerning a
resource identified under subparagraph (A)—
“(i) the limitations period under subclause (I) of
paragraph (9)(D)(i) shall be 300 days after the later of the
dates specified in items (aa) and (bb) of that subclause; and
“(ii) a court may issue a preliminary injunction to the
Indian tribe, Tribal Historic Preservation Officer, or Native
Hawaiian organization.
“(D) Rule of construction.—This paragraph—
“(i) establishes minimum additional time for Tribal
review; and
“(ii) does not limit the authority of an agency to provide
a longer period or to extend consultation by agreement.
“(7) Coordination with nepa.—For any undertaking subject
to the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.), the applicable Federal official may use the
preparation of a draft environmental document that the
Federal agency prepares under that Act to comply with the
report required under paragraph (2)(B) if the applicable
Federal official—
“(A) has notified each applicable State Historic
Preservation Officer or Tribal Historic Preservation Officer,
Indian tribe, Native Hawaiian organization, local government,
and the Council of the intent to use the environmental
document for that purpose; and
“(B) determines that the draft environmental document
includes each of the components required to be in the report
under paragraph (2)(B).
“(8) Program alternatives.—
“(A) By federal agency.—The head of any Federal agency
shall, in consultation with the Council, develop and
implement program alternatives, including an alternate
procedure, programmatic agreement, exempted category,
standard treatment, or program comment, to govern categories
of undertakings that are—
“(i) determined to normally have no adverse effects of the
undertaking;
“(ii) similar and repetitive in nature; or
“(iii) routine management activities undertaken at Federal
installations, facilities, or other land management units.
“(B) By state and tribal historic preservation officers.—
“(i) In general.—A State Historic Preservation Officer or
a Tribal Historic Preservation Officer may develop and
implement program alternatives similar to those developed by
Federal agencies under section 800.14 of title 36, Code of
Federal Regulations (or a successor regulation), including an
alternate procedure, programmatic agreement, exempted
category, standard treatment, or program comment, within
their applicable jurisdiction to govern categories of
undertakings that are—
“(I) determined to normally have no adverse effects of the
undertaking; or
“(II) similar and repetitive in nature.
“(ii) Multiple program alternatives.—If a Federal program
alternative is developed under section 800.14 of title 36,
Code of Federal Regulations (or a successor regulation), and
a State Historic Preservation Officer or Tribal Historic
Preservation Officer develops a program alternative under
clause (i) to govern the same type of undertakings, the
Federal agency shall apply the State or Tribal program
alternative, unless the applicable State Historic
Preservation Officer or Tribal Historic Preservation Officer
agrees to the application of the Federal program alternative.
SA 6958. Mr. HEINRICH (for Ms. Cortez Masto) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of division C, add the following:
SEC. 3002. REINSTATEMENT OF RULES FOR WAGERING LOSSES.
(a) In General.—Section 165(d) of the Internal Revenue
Code of 1986 is amended to read as follows:
“(d) Wagering Losses.—Losses from wagering transactions
shall be allowed only to the extent of the gains from such
transactions. For purposes of the preceding sentence, the
term `losses from wagering transactions' includes any
deduction otherwise allowable under this chapter incurred in
carrying on any wagering transaction.”.
(b) Effective Date.—The amendment made by this section
shall apply to taxable years beginning after December 31,
SA 6959. Mr. HEINRICH (for Ms. Cortez Masto) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 494, strike lines 10 through 15 and insert the
following:
DIVISION C—SOUTHERN NEVADA ECONOMIC DEVELOPMENT AND CONSERVATION ACT
SEC. 3001. SHORT TITLE.
This division may be cited as the “Southern Nevada
Economic Development and Conservation Act”.
SEC. 3002. DEFINITIONS.
In this division:
(1) County.—The term “County” means Clark County,
Nevada.
(2) Federal incidental take permit.—The term “Federal
incidental take permit” means an incidental take permit
issued under section 10(a)(1)(B) of the Endangered Species
Act of 1973 (16 U.S.C. 1539(a)(1)(B)) to—
(A) the Nevada Department of Transportation;
(B) the County; or
(C) any of the following cities in the State:
(i) Las Vegas.
(ii) North Las Vegas.
(iii) Henderson.
(iv) Boulder City.
(v) Mesquite.
(3) Secretary.—The term “Secretary” means the Secretary
of the Interior.
(4) Secretary concerned.—The term “Secretary concerned”
means—
(A) the Secretary, with respect to Federal land managed by
the Director of the Bureau of Land Management; and
(B) the Secretary of Agriculture, with respect to National
Forest System land.
(5) State.—The term “State” means the State of Nevada.
TITLE I—TRIBAL EMPOWERMENT AND ECONOMIC DEVELOPMENT
SEC. 3101. TRANSFER OF LAND TO BE HELD IN TRUST FOR THE MOAPA
BAND OF PAIUTES.
(a) Definition of Tribe.—In this section and section 3102,
the term “Tribe” means the Moapa Band of Paiutes of the
Moapa River Indian Reservation, Nevada.
(b) Transfer of Land.—
(1) In general.—Subject to valid existing rights,
including existing rights-of-way for water and wastewater
facilities and for electric generation, storage,
transmission, distribution, and supporting facilities, all
right, title, and interest of the United States in and to the
land described in subsection (c) shall be—
(A) held in trust by the United States for the benefit of
the Tribe; and
(B) part of the reservation of the Tribe.
(2) Certain transmission facilities.—
(A) In general.—The transfer of land under paragraph (1)
shall be subject to the reservation to the United States of
electric transmission corridor rights-of-way, which shall be
administered by the Secretary under the laws applicable to
such rights-of-way.
(B) Requirements.—The Secretary shall ensure that any
payments after the date of enactment of this Act for the
right-of-way under subparagraph (A) shall be—
(i) made for the benefit of the Tribe; and
(ii) transferred from the Secretary to the Tribe in a
timely manner.
(c) Description of Land.—The land referred to in
subsection (b)(1) is the approximately 44,950 acres of land
administered by the Bureau of Land Management and the Bureau
of Reclamation, as generally depicted on the map entitled
“Southern Nevada Land Management” and dated October 28,
(d) Survey.—Not later than 60 days after the date of
enactment of this Act, the Secretary shall complete a survey
of the boundary lines to establish the boundaries of the land
taken into trust under subsection (b)(1).
(e) Gaming.—Land taken into trust under this section shall
not be eligible, or considered to have been taken into trust,
for class II gaming or class III gaming (as those terms are
defined in section 4 of the Indian Gaming Regulatory Act (25
U.S.C. 2703)).
(f) Water Rights.—
(1) In general.—There shall not be Federal reserved rights
to surface water or groundwater for any land taken into trust
by the United States for the benefit of the Tribe under
subsection (b)(1).
(2) State water rights.—The Tribe shall retain any right
or claim to water under State law for any land taken into
trust by the United States for the benefit of the Tribe under
subsection (b)(1).
SEC. 3102. TRIBAL FEE LAND TO BE HELD IN TRUST.
(a) In General.—All right, title, and interest of the
Tribe in and to the land described in subsection (b) shall
be—
(1) held in trust by the United States for the benefit of
the Tribe; and
(2) part of the reservation of the Tribe.
(b) Description of Land.—The land referred to in
subsection (a) is the approximately 196 acres of land held in
fee by the Tribe, as generally depicted on the map entitled
“Southern Nevada Land Management” and dated October 28,
(c) Survey.—Not later than 180 days after the date of
enactment of this Act, the Secretary shall complete a survey
to establish the boundaries of the land taken into trust
under subsection (a).
(d) Gaming.—Land taken into trust under this section shall
not be eligible, or considered to have been taken into trust,
for class II gaming or class III gaming (as those terms are
defined in section 4 of the Indian Gaming Regulatory Act (25
U.S.C. 2703)).
(e) Water Rights.—
(1) In general.—There shall not be Federal reserved rights
to surface water or groundwater for any land taken into trust
by the United States for the benefit of the Tribe under
subsection (a)(1).
(2) State water rights.—The Tribe shall retain any right
or claim to water under State law for any land taken into
trust by the United States for the benefit of the Tribe under
subsection (a)(1).
SEC. 3103. TRANSFER OF LAND TO BE HELD IN TRUST FOR THE LAS
VEGAS PAIUTE TRIBE.
(a) Definition.—In this section, the term “Tribe” means
the Las Vegas Paiute Tribe.
(b) Transfer of Land.—Subject to valid existing rights,
all right, title, and interest of the United States in and to
the land described in subsection (c) shall be—
(1) held in trust by the United States for the benefit of
the Tribe; and
(2) part of the reservation of the Tribe.
(c) Description of Land.—The land referred to in
subsection (b) is the approximately 3,156 acres of land
administered by the Bureau of Land Management, as generally
depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026.
(d) Survey.—Not later than 180 days after the date of
enactment of this Act, the Secretary shall complete a survey
to establish the boundaries of the land taken into trust
under subsection (b).
(e) Renewable Energy Transmission Corridor.—As a condition
of the transfer of land under subsection (b), not later than
30 days after the date on which the land is taken into trust
by the United States for the benefit of the Tribe under
subsection (b), a 300-foot-wide right-of-way (as generally
depicted on the map described in subsection (c)) shall be
granted by the Tribe to a qualified electric utility for the
construction and maintenance of high-voltage transmission
facilities consistent with existing renewable energy
transmission agreements between the Tribe and the qualified
electric utility on the Snow Mountain Reservation.
(f) Gaming.—Land taken into trust under this section shall
not be eligible, or considered to have been taken into trust,
for class II gaming or class III gaming (as those terms are
defined in section 4 of the Indian Gaming Regulatory Act (25
U.S.C. 2703)).
(g) Water Rights.—
(1) In general.—Nothing in this section affirms or denies
Federal reserved rights to surface water or groundwater for
any land taken into trust by the United States for the
benefit of the Tribe under subsection (b).
(2) State water rights.—The Tribe shall retain any right
or claim to water under State law for any land taken into
trust by the United States for the benefit of the Tribe under
subsection (b).
(h) Intergovernmental Agreement.—Nothing in this section
affects the implementation of the March 2021
Intergovernmental Agreement between the Las Vegas Paiute
Tribe and the City of Las Vegas.
(i) Conforming Amendment.—Section 3092 of the Carl Levin
and Howard P. “Buck” McKeon National Defense Authorization
Act for Fiscal Year 2015 (Public Law 113-291; 128 Stat. 3870)
is amended by striking subsection (d).
TITLE II—CLARK COUNTY, NEVADA
SEC. 3201. DEFINITION OF PUBLIC PARK UNDER THE RED ROCK
CANYON NATIONAL CONSERVATION AREA PROTECTION
AND ENHANCEMENT ACT OF 2002.
Section 102 of the Red Rock Canyon National Conservation
Area Protection and Enhancement Act of 2002 (16 U.S.C.
460ccc-4 note; Public Law 107-282) is amended—
(1) by redesignating paragraphs (1), (2), and (3) as
paragraphs (2), (4), and (5), respectively;
(2) by inserting before paragraph (2) (as so redesignated)
the following:
“(1) Associated supportive use.—The term `associated
supportive use' means a use that supports the overall
function and enjoyment of a public park.”; and
(3) by inserting after paragraph (2) (as so redesignated)
the following:
“(3) Public park.—The term `public park' includes land
developed or managed by a partnership between Clark County,
Nevada, and a private entity for recreational uses and
associated supportive uses, including uses that require a fee
for admittance or use of property within the public park.”.
SEC. 3202. RED ROCK CANYON NATIONAL CONSERVATION AREA
BOUNDARY ADJUSTMENT.
Section 3(a) of the Red Rock Canyon National Conservation
Area Establishment Act of 1990 (16 U.S.C. 460ccc-1(a)) is
amended by striking paragraph (2) and inserting the
following:
“(2) The conservation area shall consist of approximately
253,950 acres of land, as generally depicted on the map
entitled `Southern Nevada Land Management' and dated October
28, 2026.”.
SEC. 3203. LAND DISPOSAL AND PUBLIC PURPOSE CONVEYANCES.
(a) Land Disposal.—
(1) In general.—Section 4(a) of the Southern Nevada Public
Land Management Act of 1998 (Public Law 105-263; 112 Stat.
2344; 116 Stat. 2007; 127 Stat. 3872) is amended, in the
first sentence, by striking “September 17, 2012.” and
inserting “October 28, 2026. The Secretary and Clark County
shall jointly nominate not more than 25,000 acres from land
depicted on the map as `Proposed Expanded Las Vegas Disposal
Boundary' for addition to the disposal boundary.”.
(2) Sand and gravel.—For purposes of the Southern Nevada
Public Land Management Act of 1998 (Public Law 105-263; 112
Stat. 2343) or the Clark County Conservation of Public Land
and Natural Resources Act of 2002 (Public Law 107-282; 116
Stat. 1994), the Secretary may authorize any of the
following:
(A) The movement of common varieties of sand and gravel on
a surface estate acquired under the Southern Nevada Public
Land Management Act of 1998 (Public Law 105-263; 112 Stat.
2343) or the Clark County Conservation of Public Land and
Natural Resources Act of 2002 (Public Law 107-282; 116 Stat.
1994) by the owner of the surface estate for purposes
including recontouring or balancing the surface estate or
filling utility trenches on the surface estate.
(B) The disposal of sand or gravel described in
subparagraph (A) at an off-site landfill.
(b) Recreation and Public Purpose Act Conveyances.—Not
later than 180 days after the date of enactment of this Act,
the Secretary shall offer to enter into an agreement with the
County under which the County is authorized to implement
immediate management modifications necessary to protect and
improve public health and safety on Federal land conveyed to
the County under the authority of the Act of June 14, 1926
(commonly known as the “Recreation and Public Purposes
Act”) (43 U.S.C. 869 et seq.), for public safety facilities
(including flood control and water management facilities),
parks, and educational facilities, without requiring approval
of the Secretary, consistent with the requirements of that
Act.
(c) Use of Public-Private Partnerships by Units of Local
Government for Affordable Housing.—Section 7(b) of the
Southern Nevada Public Land Management Act of 1998 (Public
Law 105-263; 112 Stat. 2349) is amended—
(1) in the first sentence, by striking “The Secretary”
and inserting the following:
“(1) In general.—The Secretary”; and
(2) by adding the following:
“(2) Review prioritization.—If a local governmental
entity submits an application to use land for affordable
housing purposes under this subsection, the Secretary shall
prioritize review of the application over other pending land
disposal applications under this Act.
“(3) Deadline.—The Secretary (and the Secretary of
Housing and Urban Development, if applicable) shall complete
all necessary reviews of an application submitted under this
subsection not later than 180 days after the date of
submission of the application, consistent with any applicable
laws.”.
SEC. 3204. REVOCATION OF IVANPAH AREA OF CRITICAL
ENVIRONMENTAL CONCERN AND ESTABLISHMENT OF
SPECIAL MANAGEMENT AREAS.
(a) Revocation of Ivanpah Area of Critical Environmental
Concern.—Any portion of the designation by the Bureau of
Land Management of the Ivanpah Area of Critical Environmental
Concern in the State dated February 14, 2014, not included
within a Special Management Area designated by subsection (b)
is revoked.
(b) Establishment of Special Management Areas.—The
following areas in the County are designated as special
management areas:
(1) Stump springs special management area.—Certain Federal
land in the County administered by the Bureau of Land
Management, comprising approximately 140,976 acres, as
generally depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, which shall be known
as the “Stump Springs Special Management Area”.
(2) Bird springs valley special management area.—Certain
Federal land in the County administered by the Bureau of Land
Management, comprising approximately 39,327 acres, as
generally depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, which shall be known
as the “Bird Springs Valley Special Management Area”.
(3) Desert tortoise protective corridor special management
area.—Certain Federal land in the County administered by the
Bureau of Land Management, comprising approximately 45,881
acres, as generally depicted on the map entitled “Southern
Nevada Land Management” and dated October 28, 2026, which
shall be known as the “Desert Tortoise Protective Corridor
Special Management Area”.
(4) Jean lake special management area.—Certain Federal
land in the County administered by the Bureau of Land
Management, comprising approximately 2,645 acres, as
generally depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, which shall be known
as the “Jean Lake Special Management Area”.
(5) Gale hills special management area.—Certain Federal
land in the County administered by the Bureau of Land
Management, comprising approximately 16,355 acres, as
generally depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, which shall be known
as the “Gale Hills Special Management Area”.
(6) California wash special management area.—Certain
Federal land in the County administered by the Bureau of Land
Management, comprising approximately 10,120 acres, as
generally depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, which shall be known
as the “California Wash Special Management Area”.
(7) Bitter springs special management area.—Certain
Federal land in the County administered by the Bureau of Land
Management, comprising approximately 61,813 acres, as
generally depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, which shall be known
as the “Bitter Springs Special Management Area”.
(8) Muddy mountains special management area.—Certain
Federal land in the County administered by the Bureau of Land
Management, comprising approximately 33,430 acres, as
generally depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, which shall be known
as the “Muddy Mountains Special Management Area”.
(9) Mesa milkvetch special management area.—Certain
Federal land in the County administered by the Bureau of Land
Management, comprising approximately 8,417 acres, as
generally depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, which shall be known
as the “Mesa Milkvetch Special Management Area”.
(c) Purposes.—The purposes of a special management area
designated by subsection (b) (referred to in this section as
a “Special Management Area”) are to conserve, protect, and
enhance for the benefit and enjoyment of present and future
generations the cultural, archaeological, natural,
wilderness, scientific, geological, historical, biological,
wildlife (including wildlife referred to in the Clark County
Multiple Species Habitat Conservation Plan), educational, and
scenic resources of the Special Management Area.
(d) Management of Special Management Areas.—
(1) In general.—The Secretary shall manage each Special
Management Area—
(A) in a manner that—
(i) conserves, protects, and enhances the purposes for
which the Special Management Area is established; and
(ii) ensures protection of species covered by the Clark
County Multiple Species Habitat Conservation Plan and Federal
incidental take permit; and
(B) in accordance with—
(i) this section;
(ii) the Federal Land Policy and Management Act of 1976 (43
U.S.C. 1701 et seq.); and
(iii) any other applicable law.
(2) Uses.—The Secretary shall allow only uses of a Special
Management Area that are consistent with the purposes for
which the Special Management Area is established.
(3) Motorized vehicles; new roads.—
(A) Motorized vehicles.—Except as needed for emergency
response or administrative purposes, the use of motorized
vehicles in the Special Management Areas shall be permitted
only on roads and motorized routes designated for the use of
motorized vehicles in the management plan developed under
subsection (h).
(B) New roads.—No new permanent or temporary roads or
other motorized vehicle routes shall be constructed within
the Special Management Areas after the date of enactment of
this Act.
(e) Map and Legal Description.—
(1) In general.—As soon as practicable after the date of
enactment of this Act, the Secretary shall prepare a map and
legal description of each Special Management Area.
(2) Effect.—A map or legal description filed under
paragraph (1) shall have the same force and effect as if
included in this division.
(3) Corrections.—The Secretary, in consultation and
coordination with the County, may correct minor errors in a
map or legal description filed under paragraph (1).
(4) Public availability.—A copy of each map and legal
description filed under paragraph (1) shall be on file and
available for public inspection in the appropriate offices of
the Bureau of Land Management.
(f) Incorporation of Acquired Land and Interests in Land.—
Any land or interest in land that is acquired by the United
States within a Special Management Area shall—
(1) become part of the Special Management Area in which the
acquired land or interest in land is located;
(2) be withdrawn in accordance with subsection (g); and
(3) be managed in accordance with subsection (d).
(g) Withdrawal.—Subject to valid existing rights, all
Federal land within a Special Management Area is withdrawn
from—
(1) all forms of entry, appropriation, and disposal under
the public land laws;
(2) location, entry, and patent under the mining laws; and
(3) operation of the mineral leasing, mineral materials,
and geothermal leasing laws.
(h) Management Plan.—As soon as practicable, but not later
than 1 year, after the date on which the County is issued an
amended Federal incidental take permit under section 3205,
the Secretary, in consultation and coordination with the
County, shall—
(1) develop a comprehensive management plan for the long-
term protection and management of the Special Management
Areas; and
(2) amend the applicable resource management plan to
incorporate the provisions of the management plan for the
Special Management Areas developed under paragraph (1).
(i) Transportation and Utility Corridors.—
(1) In general.—Consistent with this subsection, the
management plan for the Special Management Areas developed
under subsection (h) shall establish provisions, including
avoidance, minimization, and mitigation measures, for ongoing
maintenance of public utility and other rights-of-way in
existing designated transportation and utility corridors
within a Special Management Area.
(2) Effect.—Nothing in this section—
(A) affects the existence, use, operation, maintenance,
repair, construction, reconfiguration, expansion, inspection,
renewal, reconstruction, alteration, addition, relocation
improvement funding, removal, or replacement of any utility
facility or appurtenant right-of-way within an existing
designated transportation and utility corridor within a
Special Management Area;
(B) precludes the Secretary from authorizing the
establishment of a new or the renewal or expansion of an
existing utility facility right-of-way within an existing
designated transportation and utility corridor within a
Special Management Area, including the potential realignment
of a corridor numbered 224-225 established under section 368
of the Energy Policy Act of 2005 (42 U.S.C. 15926) through
the Stump Springs Management Area—
(i) in accordance with—
(I) the National Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.); and
(II) any other applicable law; and
(ii) subject to such terms and conditions as the Secretary
determines to be appropriate; or
(C) prohibits access to, or the repair or replacement of, a
transmission line within a right-of-way within a Special
Management Area issued before the date of enactment of this
Act.
(j) Effect.—Nothing in this section prevents or interferes
with—
(1) the construction or operation of the Ivanpah Valley
Airport authorized under the Ivanpah Valley Airport Public
Lands Transfer Act (Public Law 106-362; 114 Stat. 1404); or
(2) the Airport Environs Overlay District authorized under
section 501(c) of the Clark County Conservation of Public
Land and Natural Resources Act of 2002 (Public Law 107-282;
116 Stat. 2008) and section 3092(i) of the Carl Levin and
Howard P. “Buck” McKeon National Defense Authorization Act
for Fiscal Year 2015 (Public Law 113-291; 128 Stat. 3875).
SEC. 3205. RELATIONSHIP TO THE CLARK COUNTY MULTIPLE SPECIES
HABITAT CONSERVATION PLAN.
(a) Extension of Habitat Conservation Plan.—On receipt
from the County of a complete application for an amendment to
the applicable Federal incidental take permit, as required by
sections 17.22(b)(1) and 17.32(b)(1) of title 50, Code of
Federal Regulations (or successor regulations), and an
amended Clark County Multiple Species Habitat Conservation
Plan which incorporates the Special Management Areas
established by section 3204(b) and the provisions of the
management plan required under section 3204(h), the Secretary
shall, in accordance with this division, the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.),
the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.),
and any other applicable Federal environmental laws—
(1) credit approximately 358,954 acres of the land
conserved and designated as Special Management Areas under
section 3204(b), as depicted on the map entitled “Southern
Nevada Land Management” and dated October 28, 2026, as
mitigation to fully or partially offset, as determined by the
Secretary using the best available scientific and commercial
information, additional incidental take impacts resulting
from development of additional land within the County covered
under the existing Clark County Multiple Species Habitat
Conservation Plan or to be covered through an amendment to
the Clark County Multiple Species Habitat Conservation Plan
and Federal incidental take permit; and
(2) extend the Clark County Multiple Species Habitat
Conservation Plan and Federal incidental take permit for the
maximum authorized duration, as determined by the Secretary.
(b) Effect.—Nothing in this division otherwise limits,
alters, modifies, or amends the Clark County Multiple Species
Habitat Conservation Plan.
SEC. 3206. DESIGNATION OF MAUDE FRAZIER MOUNTAIN.
(a) In General.—The peak of Frenchman Mountain in the
State located at latitude 3610031'45" N, by longitude
11459031'52" W, shall be designated as “Maude Frazier
Mountain”.
(b) References.—Any reference in a law, map, regulation,
document, record, or other paper of the United States to the
peak described in subsection (a) shall be considered to be a
reference to “Maude Frazier Mountain”.
SEC. 3207. AVAILABILITY OF SPECIAL ACCOUNT.
Section 4(e)(3)(A)(ii) of the Southern Nevada Public Land
Management Act of 1998 (Public Law 105-263; 112 Stat. 2346;
120 Stat. 3045) is amended by striking “the Great Basin
National Park, and other areas” and inserting “the Great
Basin National Park, the Tule Springs Fossil Bed National
Monument, and other areas”.
SEC. 3208. NEVADA CANCER INSTITUTE LAND CONVEYANCE.
Section 2603(a)(3) of the Omnibus Public Land Management
Act of 2009 (Public Law 111-11; 123 Stat. 1118) is amended by
inserting “, or any successors in interest” before the
period at the end.
SEC. 3209. SLOAN CANYON NATIONAL CONSERVATION AREA BOUNDARY
ADJUSTMENT.
(a) Definitions.—In this section:
(1) Conservation area.—The term “Conservation Area”
means the Sloan Canyon National Conservation Area.
(2) Secretary.—The term “Secretary” means the Secretary
(acting through the Director of the Bureau of Land
Management).
(b) Boundary Adjustment.—
(1) Map.—Section 603(4) of the Sloan Canyon National
Conservation Area Act (16
U.S.C. 460qqq-1(4)) is amended by striking “map entitled
`Southern Nevada Public Land Management Act' and dated
October 1, 2002” and inserting “map entitled `Proposed
Sloan Canyon Expansion' and dated May 20, 2024”.
(2) Acreage.—Section 604(b) of the Sloan Canyon National
Conservation Area Act (16 U.S.C. 460qqq-2(b)) is amended by
striking “48,438” and inserting “57,728”.
(c) Right-of-Way.—Section 605 of the Sloan Canyon National
Conservation Area Act (16 U.S.C. 460qqq-3) is amended by
adding at the end the following:
“(h) Horizon Lateral Pipeline Right-of-Way.—
“(1) In general.—Notwithstanding sections 202 and 503 of
the Federal Land Policy and Management Act of 1976 (43 U.S.C.
1712, 1763) and subject to valid existing rights and
paragraph (3), the Secretary of the Interior, acting through
the Director of the Bureau of Land Management (referred to in
this subsection as the `Secretary'), shall, not later than 1
year after the date of enactment of this subsection, grant to
the Southern Nevada Water Authority (referred to in this
subsection as the `Authority'), not subject to the payment of
rents or other charges, the temporary and permanent water
pipeline infrastructure, and outside the boundaries of the
Conservation Area, powerline, facility, and access road
rights-of-way depicted on the map for the purposes of—
“(A) performing geotechnical investigations within the
rights-of-way; and
“(B) constructing and operating water transmission and
related facilities.
“(2) Excavation and disposal.—
“(A) In general.—The Authority may, without
consideration, excavate and use or dispose of sand, gravel,
minerals, or other materials from the tunneling of the water
pipeline necessary to fulfill the purpose of the rights-of-
way granted under paragraph (1).
“(B) Memorandum of understanding.—Not later than 30 days
after the date on which the rights-of-way are granted under
paragraph (1), the Secretary and the Authority shall enter
into a memorandum of understanding identifying Federal land
on which the Authority may dispose of materials under
subparagraph (A) to further the interests of the Bureau of
Land Management.
“(3) Requirements.—A right-of-way issued under this
subsection shall be subject to the following requirements:
“(A) The Secretary may include reasonable terms and
conditions, consistent with section 505 of the Federal Land
Policy and Management Act of 1976 (43 U.S.C. 1765), as are
necessary to protect Conservation Area resources.
“(B) Construction of the water pipeline shall not
permanently adversely affect conservation area surface
resources.
“(C) The right-of-way shall not be located through or
under any area designated as wilderness.”.
(d) Preservation of Transmission and Utility Corridors and
Rights-of-Way.—The expansion of the Conservation Area
boundary under the amendment made by subsection (b)—
(1) shall be subject to valid existing rights, including
land within a designated utility transmission corridor or a
transmission line right-of-way grant approved by the
Secretary in a record of decision issued before the date of
enactment of this Act; and
(2) shall not preclude—
(A) any activity authorized in accordance with a designated
corridor or right-of-way referred to in paragraph (1),
including the operation, maintenance, repair, or replacement
of any authorized utility facility within the corridor or
right-of-way; or
(B) the Secretary from authorizing the establishment of a
new utility facility right-of-way within an existing
designated transportation and utility corridor referred to in
paragraph (1)—
(i) in accordance with the National Environmental Policy
Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable
laws; and
(ii) subject to such terms and conditions as the Secretary
determines to be appropriate.
(e) Management of the Conservation Area.—Except as
provided in the amendment made by subsection (c), nothing in
this section or the amendments made by this section shall
modify the management of the Conservation Area pursuant to
section 605 of the Sloan Canyon National Conservation Area
Act (16 U.S.C. 460qqq-3).
SEC. 3210. CLARK COUNTY CONVEYANCE.
(a) Definition of Job Creation Zone.—In this section, the
term “Job Creation Zone” means the approximately 350 acres
of Federal land located in Sloan, Nevada, and identified as
“Clark County Job Creation Zone” on the map entitled
“Southern Nevada Land Management” and dated October 28,
(b) Clark County Conveyance.—
(1) Conveyance.—Notwithstanding sections 202 and 203 of
the Federal Land Policy and Management Act of 1976 (43 U.S.C.
1712, 1713), on request of the County, the Secretary shall,
without consideration and subject to all valid existing
rights, convey to the County all right, title, and interest
of the United States in and to the Job Creation Zone, except
as otherwise provided in this subsection.
(2) Use of land for nonresidential development.—
(A) In general.—After the date of the conveyance to the
County under paragraph (1), the County may sell, lease, or
otherwise convey any portion or portions of the Job Creation
Zone for purposes of nonresidential development, subject to
subparagraphs (B) and (C).
(B) Fair market value.—Any sale, lease, or other
conveyance of land under subparagraph (A) shall be for not
less than fair market value.
(C) Disposition of proceeds.—The gross proceeds from the
sale, lease, or other conveyance of land under subparagraph
(A) shall be distributed in accordance with section 4(e) of
the Southern Nevada Public Land Management Act of 1998
(Public Law 105-263; 112 Stat. 2345).
(3) Use of land for recreation or other public purposes.—
The County may elect to retain parcels in the Job Creation
Zone for public recreation or other public purposes
consistent with the Act of June 14, 1926 (commonly known as
the “Recreation and Public Purposes Act”) (43 U.S.C. 869 et
seq.), by providing to the Secretary written notice of the
election.
(4) Noise compatibility requirements.—The County shall—
(A) plan and manage the Job Creation Zone in accordance
with section 47504 of title 49, United States Code, and
regulations promulgated in accordance with that section; and
(B) agree that if any land in the Job Creation Zone is
sold, leased, or otherwise conveyed by the County, the sale,
lease, or conveyance shall contain a limitation to require
uses compatible with airport noise compatibility planning.
(5) Reversion.—
(A) In general.—If any parcel of land within the Job
Creation Zone is not conveyed for nonresidential development
under this section or reserved for recreation or other public
purposes under paragraph (3) by the date that is 30 years
after the date of enactment of this Act, the parcel of land
shall, at the discretion of the Secretary, revert to the
United States.
(B) Inconsistent use.—If the County uses any parcel of
land within the Job Creation Zone in a manner that is
inconsistent with the uses specified in this subsection, at
the discretion of the Secretary, the parcel shall revert to
the United States.
TITLE III—WILDERNESS
SEC. 3301. ADDITIONS TO THE NATIONAL WILDERNESS PRESERVATION
SYSTEM.
(a) Designation.—Section 202(a) of the Clark County
Conservation of Public Land and Natural Resources Act of 2002
(16 U.S.C. 1132 note; Public Law 107-282; 116 Stat. 1999) is
amended—
(1) in paragraph (3), by striking “2002” and inserting
“2002, and the approximately 10,095 acres of Federal land
managed by the Bureau of Land Management, as generally
depicted on the map entitled `Southern Nevada Land
Management' and dated October 28, 2026”;
(2) in paragraph (4), by striking “2002” and inserting
“2002, and the approximately 3,789 acres of Federal land
managed by the Bureau of Land Management, as generally
depicted on the map entitled `Southern Nevada Land
Management' and dated October 28, 2026”;
(3) in paragraph (5), by striking “2002” and inserting
“2002, and the approximately 19,716 acres of Federal land
managed by the Bureau of Land Management, as generally
depicted on the map entitled `Southern Nevada Land
Management' and dated October 28, 2026”;
(4) in paragraph (11), by striking “2002” and inserting
“2002, and the approximately 33,164 acres of Federal land
managed by the Bureau of Land Management, as generally
depicted on the map entitled `Southern Nevada Land
Management' and dated October 28, 2026”;
(5) in paragraph (12), by striking “2002” and inserting
“2002, and the approximately 30,134 acres of Federal land
managed by the Bureau of Land Management, as generally
depicted on the map entitled `Southern Nevada Land
Management' and dated October 28, 2026”;
(6) in paragraph (16), by striking “2002” and inserting
“2002, and the approximately 29,966 acres of Federal land
managed by the Bureau of Land Management, as generally
depicted on the map entitled `Southern Nevada Land
Management' and dated October 28, 2026”;
(7) in paragraph (17), by striking “2002” and inserting
“2002, and the approximately 699 acres of Federal land
managed by the Bureau of Land Management, as generally
depicted on the map entitled `Southern Nevada Land
Management' and dated October 28, 2026”; and
(8) by adding at the end the following:
“(19) Mount stirling wilderness.—Certain Federal land
managed by the Bureau of Land Management and the Forest
Service, comprising approximately 72,942 acres, as generally
depicted on the map entitled `Southern Nevada Land
Management' and dated October 28, 2026, which shall be known
as the `Mount Stirling Wilderness'.
“(20) Gates of the grand canyon wilderness.—Certain
Federal land managed by the National Park Service, comprising
approximately 91,963 acres, as generally depicted on the map
entitled `Southern Nevada Land Management' and dated October
28, 2026, which shall be known as the `Gates of the Grand
Canyon Wilderness'.
“(21) New york mountains wilderness.—Certain Federal land
managed by the Bureau of Land Management, comprising
approximately 14,459 acres, as generally depicted on the map
entitled `Southern Nevada Land Management' and dated October
28, 2026, which is incorporated in, and considered to be a
part of, the Mojave Wilderness designated by section
601(a)(3) of the California Desert Protection Act of 1994 (16
U.S.C. 1132 note; Public Law 103-433; 108 Stat. 4496).
“(22) Piute mountains wilderness.—Certain Federal land
managed by the Bureau of
Land Management, comprising approximately 7,520 acres, as
generally depicted on the map entitled `Southern Nevada Land
Management' and dated October 28, 2026, which is incorporated
in, and considered to be a part of, the Mojave Wilderness
designated by section 601(a)(3) of the California Desert
Protection Act of 1994 (16 U.S.C. 1132 note; Public Law 103-
13 433; 108 Stat. 4496).
“(23) Southern paiute wilderness.—Certain Federal land
managed by the Director of the United States Fish and
Wildlife Service, comprising approximately 1,276,246 acres,
as generally depicted as `Southern Paiute Wilderness' on the
map entitled `Southern Nevada Land Management' and dated
October 28, 2026, which shall be known as the `Southern
Paiute Wilderness'.
“(24) Lucy gray wilderness.—Certain Federal land managed
by the Bureau of Land Management, comprising approximately
9,601 acres, as generally depicted on the map entitled
`Southern Nevada Land Management' and dated October 28, 2026,
which shall be known as the `Lucy Gray Wilderness'.”.
(b) Applicable Law.—Subject to valid existing rights and
notwithstanding section 203(a) of the Clark County
Conservation of Public Land and Natural Resources Act of 2002
(16 U.S.C. 1132 note; Public Law 107-282; 116 Stat. 2002),
any reference in the Wilderness Act (16 U.S.C. 1131 et seq.)
to the effective date of that Act shall be considered to be a
reference to the date of enactment of this Act for purposes
of administering land designated as wilderness or a
wilderness addition by an amendment to section 202(a) of the
Clark County Conservation of Public Land and Natural
Resources Act of 2002 (16 U.S.C. 1132 note; Public Law 107-
282; 116 Stat. 1999) made by subsection (a).
TITLE IV—LOCAL GOVERNMENT CONVEYANCES IN THE STATE OF NEVADA FOR
PUBLIC PURPOSES
SEC. 3401. CITY OF BOULDER CITY, NEVADA, CONVEYANCE.
(a) Definitions.—In this section:
(1) City.—The term “City” means the city of Boulder
City, Nevada.
(2) Federal land.—The term “Federal land” means the
public land that was reserved to the United States, as
described in item 2 under exhibit B of Patent Nev-048100,
which was created pursuant to Public Law 85-339 (72 Stat.
31).
(b) Authorization of Conveyance.—On request of the City,
the Secretary shall convey to the City, without
consideration, all right, title, and interest of the United
States in and to the Federal land, except as otherwise
provided in this section.
(c) Administration of Acquired Land.—
(1) In general.—The Federal land conveyed under subsection
(b) shall be subject to valid existing rights.
(2) Administrative authority.—The Secretary shall continue
to have administrative authority over the Federal land
conveyed under subsection (b) after the date of the
conveyance.
(d) Reversion.—
(1) In general.—If the Federal land conveyed under
subsection (b) ceases to be used for the public purpose for
which the Federal land was conveyed, the Federal land shall
revert to the United States, at the discretion of the
Secretary, if the Secretary determines that reversion is in
the best interest of the United States.
(2) Responsibility of city.—If the Secretary determines
under paragraph (1) that the Federal land should revert to
the United States and that the Federal land is contaminated
with hazardous waste, the City shall be responsible for
remediation of the contamination of the Federal land.
SEC. 3402. CITY OF MESQUITE, NEVADA, CONVEYANCE FOR THE
PROTECTION OF THE VIRGIN RIVER WATERSHED.
(a) Definitions.—In this section:
(1) City.—The term “City” means the city of Mesquite,
Nevada.
(2) Federal land.—The term “Federal land” means the
approximately 250 acres of Federal land, as generally
depicted on the Map.
(3) Map.—The term “Map” means the map entitled “City of
Mesquite, River Park” and dated November 18, 2024.
(b) Authorization of Conveyance.—Notwithstanding the land
use planning requirements of sections 202 and 203 of the
Federal Land Policy and Management Act of 1976 (43 U.S.C.
1712, 1713), on request of the City, the Secretary shall
convey to the City, without consideration, all right, title,
and interest of the United States (except for the
reversionary interest described in subsection (d)) in and to
the Federal land for use by the City in developing and
implementing a watershed management plan for the protection
of the Virgin River watershed, subject to the provisions of
this section.
(c) Map and Legal Descriptions.—
(1) In general.—As soon as practicable after the date of
enactment of this Act, the Secretary shall complete the
surveys necessary to develop the final legal descriptions of
the Federal land to be conveyed under subsection (b).
(2) Corrections.—The Secretary may correct any minor
errors in the Map or legal descriptions prepared under
paragraph (1).
(3) Availability.—The Map and legal descriptions prepared
under paragraph (1) shall be on file and available for public
inspection in the Las Vegas Field Office of the Bureau of
Land Management.
(d) Reversion.—
(1) In general.—If the Federal land conveyed under
subsection (b) ceases to be used for the public purpose for
which the Federal land was conveyed, the Federal land shall
revert to the United States, at the discretion of the
Secretary, if the Secretary determines that reversion is in
the best interest of the United States.
(2) Responsibility of city.—If the Secretary determines
under paragraph (1) that the Federal land should revert to
the United States and that the Federal land is contaminated
with hazardous waste, the City shall be responsible for the
remediation of the contamination of the Federal land.
SEC. 3403. CLARK COUNTY, NEVADA, CONVEYANCE TO SUPPORT PUBLIC
SAFETY AND WILDFIRE RESPONSE.
(a) Authorization of Conveyance.—Notwithstanding the land
use planning requirements of sections 202 and 203 of the
Federal Land Policy and Management Act of 1976 (43 U.S.C.
1712, 1713), on request of the County, the Secretary
concerned shall convey to the County, on completion of any
necessary environmental analysis under any applicable law,
including the National Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.), without consideration, all right,
title, and interest of the United States in and to the
following parcels of Federal land, subject to the provisions
of this section and consistent with uses allowed under the
Act of June 14, 1926 (commonly known as the “Recreation and
Public Purposes Act”) (43 U.S.C. 869 et seq.).
(1) Mount charleston public safety complex.—The
approximately 12-acre parcel of Federal land generally
depicted as Parcel A on the map entitled “Southern Nevada
Economic Development and Conservation Act Mount Charleston
Public Safety Complex” and dated November 22, 2024, and the
1.5-acre parcel of Federal land depicted on the map entitled
“Southern Nevada Economic Development and Conservation Act
Parcel for Lee Canyon Fire Station” and dated November 22,
2024, for police and fire facilities.
(2) Public safety training facilities.—The approximately
127.6 acres of Federal land, as generally depicted on the map
entitled “Metro Parcels” and dated November 18, 2024, for
public safety training facilities.
(b) Payment of Costs.—As a condition of the conveyance
under subsection (a), the County shall pay any costs relating
to any land surveys and other associated costs of conveying
the parcels of Federal land under subsection (a).
(c) Map and Legal Descriptions.—
(1) In general.—As soon as practicable after the date of
enactment of this Act, the Secretary concerned shall prepare
legal descriptions of the parcels of Federal land to be
conveyed under subsection (a).
(2) Corrections.—The Secretary concerned may correct any
minor errors in the maps described in subsection (a) or legal
descriptions prepared under paragraph (1).
(3) Availability.—The maps described in subsection (a) and
legal descriptions prepared under paragraph (1) shall be on
file and available for public inspection in the appropriate
offices of the Bureau of Land Management or the Forest
Service, as applicable.
(d) Reversion.—
(1) In general.—If any parcel of Federal land conveyed
under subsection (a) ceases to be used for the public purpose
for which the parcel of Federal land was conveyed, the parcel
of Federal land shall revert to the United States, at the
discretion of the Secretary concerned, if the Secretary
concerned determines that reversion is in the best interest
of the United States.
(2) Responsibility of county.—If the Secretary concerned
determines under paragraph (1) that a parcel of Federal land
should revert to the United States and that the parcel of
Federal land is contaminated with hazardous waste, the County
shall be responsible for remediation of the contamination of
the parcel of Federal land.
SEC. 3404. MOAPA VALLEY WATER DISTRICT, NEVADA, CONVEYANCE TO
SUPPORT ACCESS TO RURAL WATER SUPPLY.
(a) Definitions.—In this section:
(1) District.—The term “District” means the Moapa Valley
Water District.
(2) Federal land.—The term “Federal land” means the
approximately 121 acres of Federal land, as generally
depicted on the Map.
(3) Map.—The term “Map” means the map entitled “Moapa
Valley Water District-Facilities and Land Conveyances” and
dated November 18, 2024.
(b) Authorization of Conveyance.—
(1) In general.—Notwithstanding the land use planning
requirements of sections 202 and 203 of the Federal Land
Policy and Management Act of 1976 (43 U.S.C. 1712, 1713) and
subject to paragraph (2), on request of the District, the
Secretary shall convey to the District, without
consideration, all right, title, and interest of the United
States in and to the Federal land for the construction,
operation, and maintenance of critical water conveyance
infrastructure necessary to supply water to the communities
of Logandale, Overton, Glendale, and Moapa, Nevada, except as
otherwise provided in this section.
(2) Limitation.—If any parcel of Federal land authorized
for conveyance under paragraph (1) is subject to transfer for
the benefit of the Tribe (as defined in section 3101(a)), the
interest in the parcel of Federal land to be conveyed to the
District under paragraph (1) shall be in the form of a right-
of-way for construction, maintenance, and operation of
critical water conveyance infrastructure.
(c) Map and Legal Descriptions.—
(1) In general.—As soon as practicable after the date of
enactment of this Act, the
Secretary shall prepare final legal descriptions of the
Federal land to be conveyed under subsection (b).
(2) Corrections.—The Secretary may correct any minor
errors in the Map or legal descriptions prepared under
paragraph (1).
(3) Availability.—The Map and legal descriptions prepared
under paragraph (1) shall be on file and available for public
inspection in the appropriate offices of the Bureau of Land
Management.
(d) Reversion.—
(1) In general.—If the Federal land conveyed under
subsection (b) ceases to be used for the public purpose for
which the Federal land was conveyed, as described in
subsection (b), the Federal land shall revert to the United
States, at the discretion of the Secretary, if the Secretary
determines that reversion is in the best interest of the
United States.
(2) Responsibility of district.—If the Secretary
determines under paragraph (1) that the Federal land should
revert to the United States and that the Federal land is
contaminated with hazardous waste, the District shall be
responsible for remediation of the contamination of the
Federal land.
SEC. 3405. CITY OF NORTH LAS VEGAS, NEVADA, CONVEYANCE FOR
FIRE TRAINING FACILITY.
(a) Definitions.—In this section:
(1) City.—The term “City” means the City of North Las
Vegas, Nevada.
(2) Federal land.—The term “Federal land” means the
approximately 10 acres of Federal land, as generally depicted
on the Map.
(3) Map.—The term “Map” means the map entitled “North
Las Vegas Fire Department Training Facility” and dated
November 18, 2024.
(b) Authorization of Conveyance.—Notwithstanding the land
use planning requirements of sections 202 and 203 of the
Federal Land Policy and Management Act of 1976 (43 U.S.C.
1712, 1713), on request of the City, the Secretary shall
convey to the City, without consideration, all right, title,
and interest of the United States in and to the Federal land
for the construction, operation, and maintenance of a
training facility necessary to support public safety and fire
response, subject to the provisions of this section, and
consistent with uses allowed under the Act of June 14, 1926
(commonly known as the “Recreation and Public Purposes
Act”) (43 U.S.C. 869 et seq.).
(c) Payment of Costs.—As a condition of the conveyance
under subsection (b), the City shall pay any costs relating
to any surveys and other associated costs of conveying the
Federal land.
(d) Map and Legal Descriptions.—
(1) In general.—As soon as practicable after the date of
enactment of this Act, the Secretary shall prepare final
legal descriptions of the Federal land to be conveyed under
subsection (b).
(2) Corrections.—The Secretary may correct any minor
errors in the Map or legal descriptions prepared under
paragraph (1).
(3) Availability.—The Map and legal descriptions prepared
under paragraph (1) shall be on file and available for public
inspection in the appropriate offices of the Bureau of Land
Management.
(e) Reversion.—
(1) In general.—If the Federal land conveyed under
subsection (b) ceases to be used for the public purpose for
which the Federal land was conveyed, the Federal land shall
revert to the United States, at the discretion of the
Secretary, if the Secretary determines that reversion is in
the best interest of the United States.
(2) Responsibility of city.—If the Secretary determines
under paragraph (1) that the Federal land should revert to
the United States and that the Federal land is contaminated
with hazardous waste, the City shall be responsible for
remediation of the contamination on the Federal land.
TITLE V—IMPLEMENTATION OF LOWER VIRGIN RIVER WATERSHED PLAN
SEC. 3501. IMPLEMENTATION OF LOWER VIRGIN RIVER WATERSHED
PLAN.
Section 3(d)(3) of Public Law 99-548 (commonly known as the
“Mesquite Lands Act of 1988”) (100 Stat. 3061; 110 Stat.
3009-202; 116 Stat. 2018) is amended—
(1) by striking subparagraphs (A) and (B) and inserting the
following:
“(A) for the development and implementation of a watershed
plan for the Lower Virgin River; and”; and
(2) by redesignating subparagraph (C) as subparagraph (B).
TITLE VI—SOUTHERN NEVADA LIMITED TRANSITION AREA
SEC. 3601. SOUTHERN NEVADA LIMITED TRANSITION AREA.
(a) Definition of Transition Area.—Section 2602(a) of the
Omnibus Public Land Management Act of 2009 (Public Law 111-
11; 123 Stat. 1117) is amended by striking paragraph (4) and
inserting the following:
“(4) Transition area.—The term `Transition Area' means
the approximately 980 acres of Federal land located in
Henderson, Nevada, identified as `Subject Area' on the map
entitled `Limited Transition Area (LTA) 2026 Amendment' and
dated October 27, 2026, excluding the east 100 feet of the
NW\1/4\ sec. 21, T. 23 S., R. 61 E., identified on the map as
`NV Energy Utility Corridor'.”.
(b) Use of Land for Nonresidential Development; Retention
of Land by City.—Section 2602(b) of the Omnibus Public Land
Management Act of 2009 (Public Law 111-11; 123 Stat. 1117) is
amended—
(1) in paragraph (2)—
(A) by striking subparagraphs (A) and (B) and inserting the
following:
“(A) Authorized uses.—After the conveyance to the City
under paragraph (1), the City may sell, lease, or otherwise
convey any portion of the Transition Area for purposes of—
“(i) nonresidential development; or
“(ii) limited residential development that—
“(I) augments and integrates any nonresidential
development under clause (i); and
“(II) is not freestanding.
“(B) Fair market value.—Any land sold, leased, or
otherwise conveyed under subparagraph (A) shall be for not
less than fair market value.”; and
(B) in subparagraph (C), by inserting “and applicable
State law” before the period at the end;
(2) by striking paragraph (3) and inserting the following:
“(3) Use of land for recreation or other public purposes;
retention by city.—The City may elect to retain parcels in
the Transition Area—
“(A) for public recreation or other public purposes
consistent with the Act of June 14, 1926 (commonly known as
the `Recreation and Public Purposes Act') (43 U.S.C. 869 et
seq.), by providing to the Secretary written notice of the
election; or
“(B) for any other use by the City, by providing to the
Secretary—
“(i) written notice of the election; and
“(ii) consideration in an amount equal to the fair market
value of the land retained, which shall be subject to
disposition in accordance with paragraph (2)(D).”; and
(3) in paragraph (5)(A), by striking “or reserved for
recreation or other public purposes under paragraph (3)” and
inserting “, reserved for recreation or other public
purposes under paragraph (3)(A), or retained by the City
under paragraph (3)(B)”.
TITLE VII—MISCELLANEOUS PROVISIONS
SEC. 3701. OFF-HIGHWAY VEHICLE RECREATION AREAS.
(a) Establishment.—Subject to valid existing rights, and
to rights-of-way for the construction, maintenance, and
operation of Moapa Valley Water District facilities, as
depicted on the map entitled “Moapa Valley Water District-
Facilities and Land Conveyances”, and dated November 18,
2024, the following areas of Federal land administered by the
Bureau of Land Management in the State are established as
off-highway vehicle recreation areas:
(1) Laughlin off-highway vehicle recreation area.—The
approximately 13,050 acres of Federal land, as generally
depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, to be known as the
“Laughlin Off-Highway Vehicle Recreation Area”.
(2) Logandale trails off-highway vehicle recreation area.—
The approximately 21,729 acres of Federal land, as generally
depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, to be known as the
“Logandale Trails Off-Highway Vehicle Recreation Area”.
(3) Nelson hills off-highway vehicle recreation area.—The
approximately 43,775 acres of Federal land, as generally
depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, to be known as the
“Nelson Hills Off-Highway Recreation Area”.
(4) Sandy valley off-highway vehicle recreation area.—The
approximately 39,022 acres of Federal land, as generally
depicted on the map entitled “Southern Nevada Land
Management” and dated October 28, 2026, to be known as the
“Sandy Valley Off-Highway Vehicle Recreation Area”.
(b) Purposes.—The purposes of each off-highway vehicle
recreation area established by subsection (a) (referred to in
this section as an “off-highway vehicle recreation area”)
are to preserve, protect, and enhance for the benefit and
enjoyment of present and future generations—
(1) off-highway vehicle use;
(2) other activities as the Secretary determines to be
appropriate; and
(3) the scenic, watershed, habitat, cultural, historic, and
ecological resources of the off-highway vehicle recreation
areas.
(c) Management Plans.—
(1) In general.—Not later than 2 years after the date of
enactment of this Act, in accordance with applicable law, the
Secretary shall develop a comprehensive plan for the long-
term management of each off-highway vehicle recreation area.
(2) Consultation.—In developing the management plans under
paragraph (1), the Secretary shall consult with—
(A) appropriate State, Tribal, and local governmental
entities; and
(B) members of the public.
(d) Management.—The Secretary shall manage the off-highway
vehicle recreation areas—
(1) to support the purposes described in subsection (b);
and
(2) in accordance with—
(A) the Federal Land Policy and Management Act of 1976 (43
U.S.C. 1701 et seq.);
(B) this section; and
(C) any other applicable law (including regulations).
(e) Motorized Vehicles.—
(1) In general.—Except as needed for administrative
purposes or to respond to an emergency, the use of motorized
vehicles in the off-highway vehicle recreation areas
shall be permitted only on roads and trails designated for
the use of motorized vehicles by the applicable management
plan under subsection (c).
(2) Interim management.—During the period beginning on the
date of enactment of this Act and ending on the date on which
the management plan under subsection (c) for an off-highway
vehicle recreation area takes effect, the use of motorized
vehicles in the off-highway vehicle recreation areas shall be
permitted in accordance with applicable land management
requirements.
(3) Effect of subsection.—Nothing in this subsection
prevents the Secretary from closing an existing road or trail
to protect natural resources or public safety, as the
Secretary determines to be appropriate.
(f) Transportation and Utility Corridors.—Nothing in this
section—
(1) affects the existence, use, operation, maintenance,
repair, construction, reconfiguration, expansion, inspection,
renewal, reconstruction, alteration, addition, relocation
improvement funding, removal, or replacement of any utility
facility or appurtenant right-of-way within an existing
designated transportation and utility corridor within an off-
highway vehicle recreation area;
(2) precludes the Secretary from authorizing the
establishment of a new utility facility right-of-way within
an existing designated transportation and utility corridor
within an off-highway vehicle recreation area—
(A) in accordance with—
(i) the National Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.); and
(ii) any other applicable law; and
(B) subject to such terms and conditions as the Secretary
determines to be appropriate; or
(3) prohibits access to, or the repair or replacement of, a
transmission line within a right-of-way grant within an off-
highway vehicle recreation area issued before the date of
enactment of this Act.
(g) Withdrawal.—Subject to valid existing rights, all
Federal land within the boundaries of an off-highway vehicle
recreation area, together with any land designated as the
“Nellis Dunes Off-Highway Vehicle Recreation Area” under
section 3092(j)(3)(A) of Public Law 113-291 (16 U.S.C.
460aaaa(3)(A)), is withdrawn from—
(1) all forms of appropriation or disposal under the public
land laws;
(2) location, entry, and patent under the mining laws; and
(3) operation of the mineral leasing, mineral materials,
and geothermal leasing laws.
(h) Maps and Legal Descriptions.—
(1) In general.—As soon as practicable after the date of
enactment of this Act, the Secretary shall finalize the legal
description of each off-highway vehicle recreation area.
(2) Errors.—The Secretary may correct any minor error in—
(A) a map referred to in subsection (a); or
(B) a legal description under paragraph (1).
(3) Treatment.—The maps and legal descriptions referred to
in paragraph (2) shall—
(A) be on file and available for public inspection in the
appropriate offices of the Bureau of Land Management; and
(B) have the same force and effect as if included in this
division, subject to paragraph (2).
SEC. 3702. LOWER LAS VEGAS WASH WEIRS.
(a) In General.—Subject to valid existing rights, the
availability of appropriations, and all applicable laws, the
Secretary shall complete construction of the 6 erosion
control weirs on the lower Las Vegas Wash within the Lake
Mead National Recreation Area that are unfinished as of the
date of enactment of this Act, as identified in the study of
the Federal Highway Administration entitled “2010 Lower Las
Vegas Wash Planning Study”.
(b) Deadline.—It is the intent of Congress that the
construction of the weirs described in subsection (a) be
completed by the Secretary by not later than 8 years after
the date of enactment of this Act.
SEC. 3703. CRITICAL FLOOD CONTROL FACILITIES.
The Secretary shall amend the Las Vegas Resource Management
Plan dated 1998 to allow for the design and construction of
flood control facilities in the Coyote Springs Desert
Tortoise Area of Critical Environmental Concern, as described
in the most-recent update of the Las Vegas Valley Master Plan
for Flood Control Facilities developed by the Regional Flood
Control District, as generally depicted on the map attached
to that update entitled “Regional Flood Control District
Master Plan Facilities in the Coyote Springs Area of Critical
Environmental Concern”.
SEC. 3704. JURISDICTION OVER FISH AND WILDLIFE.
Nothing in this division affects the jurisdiction of the
State with respect to the management of fish or wildlife on
any Federal land located in the State.
DIVISION D—SURVIVOR JUSTICE TAX PREVENTION ACT
SEC. 4001. EXCLUSION FROM GROSS INCOME OF ANY DAMAGES, OTHER
THAN PUNITIVE DAMAGES, RECEIVED ON ACCOUNT OF
SEXUAL ACTS OR SEXUAL CONTACT.
SA 6960. Mr. HEINRICH (for Mr. King) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 6 of the amendment, strike lines 12 through 15 and
insert the following:
“(1) Agency cerpo.—The term `agency CERPO' means—
“(A) with respect to a key permitting agency for which 1
or more agency CERPOs have been designated under section
41002(b)(2)(A)(iii)(I) of the FAST Act (42 U.S.C. 4370m-
1(b)(2)(A)(iii)(I)), each agency CERPO so designated; and
“(B) with respect to any other key permitting agency, the
chief environmental review and permitting officer of the key
permitting agency, as designated by the head of the key
permitting agency.
SA 6961. Mr. HEINRICH (for Mr. King) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of subtitle B of title II of division B of the
amendment, add the following:
SEC. 2216. TEMPORARY EXPEDITED AUTHORIZATIONS FOR LOW-
CONFLICT WIND ENERGY PROJECTS ON PRIVATE LAND.
(a) Definitions.—In this section:
(1) Administrator.—The term “Administrator” means the
Administrator of the Federal Aviation Administration.
(2) Aircraft detection lighting system.—The term
“aircraft detection lighting system” means a sensor-based
system that activates obstruction lighting only when an
aircraft is detected nearby, as described in Federal Aviation
Administration Advisory Circular 70/7460-1.
(3) Application.—The term “application” includes a
notice, preconstruction notification, request, and any other
submission provided by a project sponsor to a Federal agency
for the purpose of obtaining from the agency a covered
authorization.
(4) Bird and bat conservation strategy.—The term “bird
and bat conservation strategy” means a project-specific
strategy to avoid, minimize, and compensate for impacts to
birds and bats, as described in the Land-Based Wind Energy
Guidelines.
(5) Covered authorization.—
(A) In general.—The term “covered authorization” means
an authorization, determination, approval, verification,
concurrence, or permit described in any of paragraphs (1)
through (4) of subsection (e).
(B) Exclusion.—The term “covered authorization” does not
include a general permit described in subsection (e)(5).
(6) Director.—The term “Director” means the Director of
the United States Fish and Wildlife Service.
(7) Eligible project.—The term “eligible project” means
a wind energy project that meets the applicable criteria
described in subsection (c).
(8) Federal authorization or permit.—The term “Federal
authorization or permit” has the meaning given the term in
section 1401(a).
(9) Habitat conservation plan.—The term “habitat
conservation plan” means a conservation plan described in
section 10(a)(2)(A) of the Endangered Species Act of 1973 (16
U.S.C. 1539(a)(2)(A)).
(10) IPaC species screening.—The term “IPaC species
screening” means a screening for a listed species or a
designated critical habitat using the Information for
Planning and Consultation system of the United States Fish
and Wildlife Service (or any successor system).
(11) Land-based wind energy guidelines.—The term “Land-
Based Wind Energy Guidelines” means the voluntary Land-Based
Wind Energy Guidelines issued by the United States Fish and
Wildlife Service in March 2012 (as in effect on the date of
enactment of this Act).
(12) Listed.—The term “listed”, with respect to a
species of animals or plants, means that the species is
listed as an endangered species or a threatened species under
section 4 of the Endangered Species Act of 1973 (16 U.S.C.
1533).
(13) Local field office.—The term “local field office”,
with respect to a project, means the field office of the
United States Fish and Wildlife Service with jurisdiction
over the area in which the project is located.
(14) Nationwide permit.—The term “nationwide permit”
means a general permit issued on a nationwide basis under
section 404(e) of the Federal Water Pollution Control Act (33
U.S.C. 1344(e)).
(15) Project sponsor.—The term “project sponsor” means
an entity, including any private, public, or public-private
entity, seeking an authorization for a wind energy project.
(16) Remedy.—The term “remedy” means a result described
in subsection (e) that applies in a case in which a Federal
agency fails to provide a response by the applicable deadline
under this section.
(17) Single and complete project; special aquatic sites.—
The terms “single and complete project” and “special
aquatic sites” have the meanings given those terms in
section 330.2 of title 33, Code of Federal Regulations (or a
successor regulation).
(18) Standard conservation measure.—The term “standard
conservation measure” means any measure described in
subsection (g)(4), including any applicable supplement to
such a measure under subsection (h).
(19) Standard crossing design.—The term “standard
crossing design” means a water crossing design described in
subsection (c)(2)(C).
(20) Standard marking and lighting.—The term “standard
marking and lighting” means full obstruction marking and
lighting in accordance with Federal Aviation Administration
Advisory Circular 70/7460-1.
(21) Wind energy project.—The term “wind energy project”
means a land-based wind energy generation facility on
privately owned land, including any new construction,
repowering, or expansion of such a facility, and any
associated facilities, on privately owned land.
(b) Requirement to Act.—
(1) In general.—A Federal agency shall act on a complete
application for a covered authorization for an eligible
project by the applicable deadline under subsection (e).
(2) Failure to act.—Except as otherwise expressly provided
in this section, if a Federal agency fails to issue a timely,
reasoned written determination with respect to a complete
application for a covered authorization in accordance with
paragraph (1), the applicable remedy shall take effect,
without further agency action, on receipt by the agency of
notice under subsection (g)(1)(A)(i).
(3) No regulations.—No regulations shall be required to
implement this section.
(4) Effect.—Nothing in this section authorizes any project
or activity requiring an approval not covered by this
section.
(c) Eligible Project Criteria.—A wind energy project shall
be considered to be an eligible project if the project
sponsor certifies that the wind energy project meets each of
the following criteria:
(1) Land and siting.—
(A) Facilities and roads.—All turbines, substations,
operations and maintenance facilities, and access roads are
located entirely on privately owned land.
(B) No federal interest.—The wind energy project involves
no Federal land, Federal mineral estate, Federal funding, or
Federal right-of-way.
(C) Federal nexus.—The only Federal nexuses of the wind
energy project are 1 or more of the following:
(i) Review by the Federal Aviation Administration under
section 44718 of title 49, United States Code, including any
necessary—
(I) coordination with the Department of Defense under
section 183a of title 10, United States Code; and
(II) authorization by the Federal Communications
Commission.
(ii) Discrete crossings of waters of the United States by a
road, collection line, or transmission line requiring
authorization under section 404 of the Federal Water
Pollution Control Act (33 U.S.C. 1344).
(iii) Consultation under section 7, or authorization under
section 10, of the Endangered Species Act of 1973 (16 U.S.C.
1536, 1539) arising from—
(I) a crossing described in clause (ii); or
(II) construction or operation of the wind energy project.
(iv) Registration for, or renewal of, a general permit for
incidental take of eagles under section 22.250 of title 50,
Code of Federal Regulations (as in effect on the date of
enactment of this Act), solely as provided in subsection
(e)(5).
(D) Protected areas.—No component of the wind energy
project is located within a unit of the National Wildlife
Refuge System, a designated critical habitat, a component of
the National Wild and Scenic Rivers System, or a unit of the
National Park System, or on land held in trust by the United
States for the benefit of an Indian Tribe.
(E) Surveys and studies.—The project sponsor has completed
the site-specific avian use and species surveys and studies
recommended in the Land-Based Wind Energy Guidelines, except
for any such study that is inapplicable to the wind energy
project, as determined by a qualified wildlife professional
based on site-specific conditions, with a supporting
explanation included in the application for the covered
authorization.
(F) Participation.—
(i) In general.—The project sponsor has provided to each
relevant unit of local government, affected community, and
landowner—
(I) written notice of the proposed wind energy project; and
(II) a reasonable opportunity to provide input regarding
the wind energy project.
(ii) Failure to respond.—A failure by a recipient to
respond to a written notice under clause (i) shall not—
(I) affect the eligibility of the applicable wind energy
project; or
(II) delay any remedy with respect to the wind energy
project.
(2) Waters.—
(A) Nationwide permit.—Each single and complete project
crossing waters of the United States qualifies for a
nationwide permit, including with respect to applicable
acreage and linear-foot limitations.
(B) Effect on special aquatic sites and navigable waters.—
The wind energy project does not affect any special aquatic
sites or any navigable waters for which an individual permit
under section 10 of the Act of March 3, 1899 (commonly known
as the “Rivers and Harbors Act of 1899”) (30 Stat. 1151,
chapter 425; 33 U.S.C. 403), would be required.
(C) Standard crossing design.—Each water crossing of the
wind energy project uses a standard crossing design,
including bottomless culverts or bridges for roads and
horizontal directional drilling or boring for collection and
transmission lines, where feasible.
(3) Species.—
(A) Screening.—The wind energy project has completed an
IPaC species screening.
(B) Effect.—Either—
(i) no listed species or designated critical habitat is
present at any crossing of the wind energy project; or
(ii) the project sponsor commits to implement the standard
conservation measures for each listed species present at such
a crossing, including seasonal work windows, buffers, erosion
and sediment controls, and any applicable compensatory
mitigation requirements.
(C) Bird and bat conservation strategies and monitoring.—
The project sponsor—
(i) has prepared or will prepare a bird and bat
conservation strategy; and
(ii) will conduct not less than 1 year of post-construction
monitoring, in accordance with the Land-Based Wind Energy
Guidelines.
(4) Aviation.—
(A) Exclusion areas.—
(i) In general.—No turbine of the wind energy project is
or will be located within an airport or military-airspace
exclusion area in which construction is expressly prohibited
by Federal law in effect on the date of enactment of this
Act, including any applicable airport-protection surface or
exclusion area established under Federal aviation law.
(ii) Identification.—The project sponsor identifies any
applicable airport or military-airspace siting restriction in
the notice submitted with respect to the wind energy project
under part 77 of title 14, Code of Federal Regulations (or
successor regulations).
(iii) Proximity.—For purposes of this subsection,
proximity to an airport, military training route, or airspace
designated under part 73 of title 14, Code of Federal
Regulations (or successor regulations), without an applicable
prohibition on construction shall not make a wind energy
project ineligible.
(iv) Effect.—Nothing in this subparagraph constitutes a
determination under section 44718 of title 49, United States
Code.
(B) Marking and lighting.—The project sponsor commits to
comply with the applicable requirements of subsection (g)(2).
(5) Process.—
(A) Historic properties.—A cultural resources screening
identifies no historic property listed or eligible for
listing in the National Register of Historic Places within
the area of potential effects of any Department of the Army
authorization sought for the wind energy project, or a
responsible Federal agency has completed consultation under
section 306108 of title 54, United States Code, with respect
to each affected historic property.
(B) Attestation.—The project sponsor—
(i) certifies the truthfulness of each submission under
this section;
(ii) executes an enforceable compliance undertaking
document; and
(iii) documents compliance with any applicable
decommissioning or mitigation financial assurance
requirements, including any financial assurances required
under an applicable habitat conservation plan.
(C) Approvals.—
(i) In general.—The project sponsor obtains all applicable
State and local approvals before carrying out any activity
for which such an approval is required.
(ii) Phases.—An approval described in clause (i) for a
subsequent phase of a wind energy project shall not be
required in order to obtain a remedy for an earlier phase of
the wind energy project.
(d) Authorizations.—
(1) In general.—A project sponsor may seek only such
covered authorizations for an eligible project as are
required to carry out the eligible project.
(2) Limitations.—
(A) Secretary of the army.—No authorization from the
Secretary of the Army shall be required with respect to an
eligible project unless the eligible project involves 1 or
more activities subject to—
(i) section 404 of the Federal Water Pollution Control Act
(33 U.S.C. 1344); or
(ii) section 10 of the Act of March 3, 1899 (commonly known
as the “Rivers and Harbors Act of 1899”) (30 Stat. 1151,
chapter 425; 33 U.S.C. 403).
(B) FAA and fcc.—No approval from the Administrator or the
Federal Communications Commission for an aircraft detection
lighting system shall be required with respect to an eligible
project unless the eligible project proposes to use an
aircraft detection lighting system.
(e) Review Periods and Remedies.—
(1) Federal aviation administration.—
(A) Determination of no hazard.—
(i) In general.—For each turbine and meteorological tower
of an eligible project, the Administrator shall issue a
determination under section 44718 of title 49, United States
Code, not later than 15 days after the earlier of—
(I) the date of receipt of a finding or notice of no
unacceptable risk under subparagraph (C); and
(II) the date of expiration of the applicable review period
under subparagraph (C), including any extension agreed to by
the project sponsor.
(ii) Failure to act.—If the Administrator fails to issue a
determination described in clause (i) by the applicable
deadline under that clause, unless the Secretary of Defense
has issued a timely finding of unacceptable risk under
subparagraph (C), the applicable turbine or meteorological
tower—
(I) shall, on receipt by the Administrator of notice under
subsection (g)(1)(A)(i), be deemed to have received an
interim determination of no hazard; and
(II) may be constructed and operated with standard marking
and lighting, subject to other applicable law.
(iii) Subsequent adverse determinations.—
(I) In general.—Any subsequent adverse determination
relating to a turbine or meteorological tower described in
clause (i) shall—
(aa) apply prospectively; and
(bb) identify each specific hazard and practicable
mitigation measures.
(II) Limitations.—The Administrator—
(aa) shall provide a reasonable opportunity for compliance
with the mitigation measures described in subclause (I)(bb);
and
(bb) may not require removal or cessation of an existing
turbine or meteorological tower except as necessary to
address an imminent and specific danger to air navigation.
(iv) Effect.—Nothing in this subparagraph grants any
airspace authorization required under any other provision of
law (including regulations).
(B) Aircraft detection lighting systems.—
(i) In general.—The Administrator shall act on a complete
application for approval of an aircraft detection lighting
system not later than 90 days after the date of receipt of
the application, including any required coordination with the
Secretary of Defense.
(ii) Failure to act.—Failure by the Administrator to act
in accordance with clause (i) shall not—
(I) constitute approval of an aircraft detection lighting
system; or
(II) prevent construction or operation of an aircraft
detection lighting system with standard marking and lighting.
(C) Department of defense coordination.—Notwithstanding
provisions to the contrary in subsections (c)(1) and (e) of
section 183a of title 10, United States Code, and subsections
(f) and (g) of section 44718 of title 49, United States Code,
the following shall apply:
(i) Referral.—Not later than 5 days after the date on
which the Administrator receives from a project sponsor a
complete application for an eligible project, the
Administrator shall transmit to the Military Aviation and
Installation Assurance Siting Clearinghouse a copy of the
application, together with any supporting information
necessary for review by the Secretary of Defense under this
subparagraph.
(ii) Initial review.—Not later than 45 days after the date
on which the Administrator receives from a project sponsor a
complete application for an eligible project, the Secretary
of Defense shall notify the Administrator and the project
sponsor, in writing, that—
(I) the applicable eligible project presents no
unacceptable risk to national security;
(II) a specifically identified potential adverse impact of
the eligible project may be resolved through 1 or more
identified mitigation measures; or
(III) the Secretary of Defense has made a finding of
unacceptable risk with respect to the eligible project, in
accordance with section 183a(e) of title 10, United States
Code.
(iii) Mitigation.—
(I) Negotiation.—If the Secretary of Defense provides
notice under clause (ii)(II), the Secretary of Defense and
the project sponsor shall have not more than 45 additional
days to negotiate the mitigation measures described in that
clause, unless the project sponsor agrees in writing to an
extension.
(II) Execution and notice.—If mitigation is agreed to
under subclause (I), the Secretary of Defense shall—
(aa) execute the mitigation agreement; and
(bb) not later than 10 days after the date of execution,
transmit to the Administrator the resulting findings.
(III) Failure to resolve.—The Secretary of Defense may
issue a finding of unacceptable risk under section 183a(e) of
title 10, United States Code, with respect to an eligible
project during the applicable mitigation period under this
clause if an identified risk cannot be resolved through
mitigation.
(iv) Failure to act.—
(I) In general.—If the Secretary of Defense fails to
provide notice by the applicable deadline under clause (ii),
or fails to execute a mitigation agreement or issue a finding
of unacceptable risk by the applicable deadline under clause
(iii), the project sponsor may provide to the Secretary of
Defense a notice under subsection (g)(1)(A)(i).
(II) Effect of notice.—On receipt of a notice under
subclause (I)—
(aa) the Secretary of Defense shall be deemed to have made
a finding of no unacceptable risk for purposes of section
183a(e) of title 10, United States Code, and subsections (f)
and (g) of section 44718 of title 49, United States Code; and
(bb) the Administrator shall proceed without further action
required by the Secretary of Defense.
(III) Treatment.—A timely finding of unacceptable risk by
the Secretary of Defense pursuant to this subparagraph shall
not be deemed to be a finding of no unacceptable risk under
subclause (II)(aa).
(v) National security.—Nothing in this subparagraph—
(I) affects the implementation or effect of section
183a(e)(1)(B) of title 10, United States Code; or
(II) limits any action necessary to address a subsequently
identified imminent and specific threat to national security.
(2) Federal communications commission.—
(A) In general.—Not later than 60 days after the date of
receipt of a complete application for a radio authorization
or antenna structure registration or modification required
for an aircraft detection lighting system involved in an
eligible project, the Federal Communications Commission shall
approve or deny the authorization, registration, or
modification.
(B) Failure to act.—
(i) In general.—Subject to clause (ii), failure by the
Federal Communications Commission to act in accordance with
subparagraph (A) shall not—
(I) be considered to be approval by the Federal
Communications Commission; or
(II) waive an authorization otherwise required to be
obtained from the Federal Communications Commission for an
eligible project.
(ii) Limitation.—The absence of an authorization described
in subparagraph (A) shall not prevent or delay the
construction or operation of the applicable eligible project
using standard marking and lighting, subject to otherwise
applicable law.
(3) Department of the army.—
(A) Nationwide permit preconstruction notifications.—
(i) In general.—The Secretary of the Army, acting through
the Chief of Engineers (referred to in this paragraph as the
“Secretary”), shall issue a determination, in writing
(including conducting any required consultation), with
respect to a complete preconstruction notification under an
applicable nationwide permit not later than, as applicable—
(I) 45 days after the date of receipt of the notification;
or
(II) 60 days after the date of receipt of the notification
in any case in which consultation under section 7 of the
Endangered Species Act of 1973 (16 U.S.C. 1536) or section
306108 of title 54, United States Code, is required.
(ii) Failure to act.—Notwithstanding part 330 of title 33,
Code of Federal Regulations (or successor regulations), on a
failure by the Secretary to issue a determination in
accordance with clause (i) and receipt by the Secretary of
notice under subsection (g)(1)(A)(i), the verification that
is the subject of that determination shall be deemed to be
issued for any activity carried out in accordance with, as
applicable—
(I) a nationwide permit;
(II) any regional conditions; and
(III) subsection (g).
(iii) Endangered species act requirements.—Notwithstanding
section 330.4(f) of title 33, Code of Federal Regulations (or
a successor regulation), or a nationwide permit condition
requiring separate written confirmation of the Chief of
Engineers under section 7 of the Endangered Species Act of
1973 (16 U.S.C. 1536), work may proceed under a deemed
verification under clause (ii) if the requirements of section
7 of the Endangered Species Act of 1973 (16 U.S.C. 1536) are
satisfied in accordance with—
(I) subparagraph (A) or (B) of paragraph (4); or
(II) another applicable provision of law.
(iv) Other requirements.—
(I) Treatment.—A deemed verification under clause (ii)
shall not be considered to constitute—
(aa) a certification under section 401 of the Federal Water
Pollution Control Act (33 U.S.C. 1341); or
(bb) completion of consultation required under section
306108 of title 54, United States Code.
(II) Requirement.—A certification or consultation
requirement described in subclause (I) shall be independently
satisfied or waived under applicable law before any work
described in clause (iii) commences.
(B) Approved jurisdictional determinations.—
(i) In general.—The Secretary shall issue a verification
with respect to a complete application for an approved
jurisdictional determination relating to an eligible project
not later than 45 days after the date of receipt of the
application.
(ii) Failure to act.—On failure by the Secretary to issue
a verification described in clause (i) by the applicable
deadline under that clause and receipt by the Secretary of
notice under subsection (g)(1)(A)(i), a delineation described
in subsection (g)(3)(D) shall be deemed to be accepted for
purposes of the eligible project, without determining
jurisdiction over any other affected property.
(4) United states fish and wildlife service.—
(A) Informal consultation.—
(i) In general.—The Director shall issue a written
determination with respect to a complete application for
concurrence in a determination by a Federal agency under
section 7(a)(2) of the Endangered Species Act of 1973 (16
U.S.C. 1536(a)(2)) that an eligible
project is not likely to adversely affect a listed species or
designated critical habitat not later than 30 days after the
date of receipt of the application.
(ii) Failure to act.—On failure by the Director to issue a
written determination described in clause (i) by the
applicable deadline under that clause and receipt by the
Director of notice under subsection (g)(1)(A)(i)—
(I) concurrence of the Director shall be deemed to be
provided for purposes of section 7(a)(2) of the Endangered
Species Act of 1973 (16 U.S.C. 1536(a)(2)) solely for the
eligible project and effects of the eligible project
described in the request; but
(II) no incidental take not otherwise authorized by law
shall be considered to be authorized, subject to subsection
(g).
(B) Programmatic formal consultation.—
(i) In general.—The Director shall issue a written
determination with respect to a complete request to confirm
that a crossing of an eligible project meets the express
coverage criteria of an existing programmatic biological
opinion issued under section 7(b) of the Endangered Species
Act of 1973 (16 U.S.C. 1536(b)) not later than 60 days after
the date of receipt of the request.
(ii) Failure to act.—On failure by the Director to issue a
written determination described in clause (i) by the
applicable deadline under that clause and receipt by the
Director of notice under subsection (g)(1)(A)(i), coverage
shall be deemed to be confirmed by the Director only to the
extent that the applicable crossing meets the criteria
referred to in clause (i).
(iii) Incidental take statement.—Section 7(o)(2) of the
Endangered Species Act of 1973 (16 U.S.C. 1536(o)(2)) shall
apply only to a take involved in an eligible project that is
within the scope and limits, and subject to the terms, of an
existing incidental take statement.
(C) Incidental take permits for construction.—
(i) In general.—The Director shall issue a written
determination with respect to a complete application for a
permit under section 10(a)(1)(B) of the Endangered Species
Act of 1973 (16 U.S.C. 1539(a)(1)(B)) for a take incidental
to the construction of an eligible project not later than 180
days after the date of receipt of the application.
(ii) Failure to act.—On failure by the Director to issue a
written determination described in clause (i) by the
applicable deadline under that clause and receipt by the
Director of notice under subsection (g)(1)(A)(i), an
incidental take during the construction of the applicable
eligible project shall be authorized by operation of
subparagraph (E), solely within the limits, and subject to
the conditions, described in that subparagraph and subsection
(g).
(iii) Effect.—Nothing in this subparagraph authorizes
construction that requires an approval under any other
provision of law (including regulations).
(D) Incidental take permits for operations affecting listed
bats.—
(i) In general.—The Director shall issue a written
determination with respect to a complete application for a
permit under section 10(a)(1)(B) of the Endangered Species
Act of 1973 (16 U.S.C. 1539(a)(1)(B)) for a take of listed
bats incidental to the operation of an eligible project not
later than 180 days after the date of receipt of the
application.
(ii) Failure to act.—On failure by the Director to issue a
written determination described in clause (i) by the
applicable deadline under that clause and receipt by the
Director of notice under subsection (g)(1)(A)(i), an
incidental take of listed bats during the operation of the
applicable eligible project shall be authorized by operation
of subparagraph (E), solely within the limits, and subject to
the conditions, described in that subparagraph and subsection
(g).
(E) Statutory incidental take authorization.—
(i) Operation of law.—
(I) In general.—Notwithstanding paragraphs (1) and (2) of
section 10(a) of the Endangered Species Act of 1973 (16
U.S.C. 1539(a)), if the Director fails to issue a written
determination by an applicable deadline under subparagraph
(C) or (D), the incidental take described in the relevant
complete application and the accompanying habitat
conservation plan shall be considered to be authorized by
operation of this section on receipt by the Director of
notice under subsection (g)(1)(A)(i), without any further
agency action, finding, consultation, or approval.
(II) Effect.—An authorization under this clause shall have
the force and effect of a permit issued under section
10(a)(1)(B) of the Endangered Species Act of 1973 (16 U.S.C.
1539(a)(1)(B)).
(ii) Limitations.—An authorization under clause (i)—
(I) extends only to the applicable listed species,
activities, geographic area, term, and quantified incidental
take expressly identified in the complete application and
accompanying habitat conservation plan;
(II) is subject to all applicable avoidance, minimization,
mitigation, monitoring, reporting, funding, and other
enforceable conditions of that habitat conservation plan and
subsection (g); and
(III) does not authorize any take beyond the limits
described in subclause (I).
(iii) Complete applications.—
(I) In general.—To be eligible to be considered to be
complete under this subparagraph, an application shall
include a habitat conservation plan containing the
information described in subparagraph (A) of section 10(a)(2)
of the Endangered Species Act of 1973 (16 U.S.C. 1539(a)(2))
and evidence supporting each finding described in
subparagraph (B) of that section, including assurances of
adequate funding.
(II) Incompleteness.—A materially incomplete application
shall not qualify for an authorization under clause (i),
subject to the completeness procedures described in
subsection (f).
(iv) Public participation.—
(I) In general.—Not later than 30 days after the date of
receipt of a complete application, the Director shall—
(aa) publish the application and the accompanying habitat
conservation plan; and
(bb) provide not less than 30 days for written public
comment regarding that application and habitat conservation
plan.
(II) Action by project sponsor.—If the Director fails to
publish an application or habitat conservation plan by the
applicable deadline under subclause (I), the project sponsor
may publish the applicable materials and provide an
opportunity for comment through a publicly accessible website
and submission to the Director of relevant notice.
(III) Response.—A project sponsor shall submit to the
Director a response to any material comments under this
clause before the applicable authorization takes effect.
(IV) No extension.—Failure by the Director to publish,
review, or respond to any comments under this clause shall
not extend the 180-day period described in subparagraph
(C)(i) or (D)(i), as applicable.
(V) Requirement.—An authorization under clause (i) may not
take effect until—
(aa) the applicable comment period under this clause
concludes; and
(bb) the project sponsor submits a response to those
comments under subclause (III).
(v) Environmental review and consultation.—
(I) In general.—An authorization under clause (i)—
(aa) shall be conferred directly by this section; and
(bb) notwithstanding the National Environmental Policy Act
of 1969 (42 U.S.C. 4321 et seq.) and section 7 of the
Endangered Species Act of 1973 (16 U.S.C. 1536), shall not
require an environmental assessment, environmental impact
statement, finding of no significant impact, record of
decision, biological opinion, or further consultation as a
condition of validity or effectiveness.
(II) Application.—This clause—
(aa) applies solely to a statutory incidental take
authorization under clause (i); and
(bb) does not exempt any Federal agency action or
authorization from any otherwise applicable requirement.
(vi) Enforcement.—
(I) In general.—The Director may enforce the terms, take
limits, and conditions of an authorization under clause (i)
to the same extent as if the authorization were a permit
issued under section 10(a)(1)(B) of the Endangered Species
Act of 1973 (16 U.S.C. 1539(a)(1)(B)), subject to subsection
(g)(1)(D).
(II) Treatment.—No subsequent agency documentation or
acknowledgment shall be required to establish an
authorization under clause (i).
(5) Eagle general permits.—
(A) In general.—An eligible project that satisfies the
eligibility criteria for a general permit for incidental take
of eagles associated with wind energy operations under
sections 22.210 and 22.250 of title 50, Code of Federal
Regulations (as in effect on the date of enactment of this
Act), shall remain eligible to register for and renew such a
permit, notwithstanding any subsequent change in those
eligibility criteria or a general suspension of new
registrations under section 22.210(e) of that title (as so in
effect), if the eligible project continues to satisfy the
criteria in effect on that date of enactment.
(B) Requirements.—The registration, issuance, renewal, and
compliance of an eligible project described in subparagraph
(A) shall remain subject to the general-permit requirements
in effect on the date of enactment of this Act, including
with respect to certifications, fees, conditions, and
enforcement.
(C) Effect.—Nothing in this paragraph—
(i) authorizes an eagle take; or
(ii) requires an eligible project to seek an eagle take
permit.
(f) Complete Applications and Review Periods.—
(1) Commencement of review period.—
(A) In general.—Except as provided in subsection (e)(1),
for any determination or coordination with the Secretary of
Defense required under subsection (e), each applicable review
period under that subsection shall be considered to begin on
the date on which the applicable Federal agency receives a
complete application for a covered authorization for an
eligible project.
(B) Determinations of no hazard.—The 15-day period
described in clause (i) of subsection (e)(1)(A) shall be
considered to begin on the applicable date described in
subclause (I) or (II) of that clause, without regard to the
date on which notice under subsection (g)(1)(A)(i) is
provided.
(2) Completeness of applications.—
(A) In general.—An application shall be considered to be
complete for purposes of this subsection if the application
contains the information required under the publicly
available requirements of the applicable agency, as in effect
on the date of enactment of this Act.
(B) Notice of deficiency.—
(i) In general.—Not later than 15 days after the date of
receipt of a complete application, an agency may issue 1
written notice identifying any specific missing information
reasonably necessary with respect to the covered
authorization that is the subject of the application.
(ii) Completeness.—An application described in clause (i)
shall be—
(I) absent a notice under that clause, deemed to be
complete on the date of submission; or
(II) if a notice under that clause is issued by an agency,
complete on submission to the agency of the information
identified in the notice.
(C) Agency obligations.—An agency—
(i) may not extend a review period under this section
through—
(I) successive requests for information under subparagraph
(B)(i); or
(II) requests for information beyond the applicable
requirements published by the agency; and
(ii) shall bear the burden of identifying, in a timely
written notice under subparagraph (B)(i), any deficiency in
an application.
(3) Treatment of certain agency actions.—
(A) In general.—A request by an agency for additional
information, a referral by an agency, or provision by an
agency of a notice that review remains pending shall not be
considered to be a determination by the agency for purposes
of this section.
(B) Adverse determinations.—
(i) In general.—A written denial or adverse determination
issued by an agency by an applicable deadline under this
section shall identify—
(I) the statutory or regulatory grounds for the denial or
determination;
(II) the material facts supporting those grounds; and
(III) where legally available, specific measures that would
permit approval by the agency.
(ii) Treatment.—A denial by an agency under this section—
(I) shall not be deemed to be an approval; and
(II) remains subject to otherwise applicable administrative
and judicial review.
(4) Conditions required.—A remedy shall apply with respect
to an eligible project only if the eligible project complies
with the applicable conditions described in subsection (g).
(g) Conditions for Remedies.—To receive a remedy under
this subsection, an eligible project shall comply with the
following conditions, as applicable:
(1) All federal agencies.—
(A) Notice and effect of failure to act.—
(i) In general.—If a Federal agency fails to issue a
written determination by an applicable deadline under
subsection (e), the project sponsor may submit to the office
of the agency that is designated to receive covered
authorization applications a written notice of the missed
deadline, including by electronic submission.
(ii) Remedy.—On receipt of a notice under clause (i), the
applicable remedy described in subsection (e) shall take
effect by operation of law, without further agency action,
determination, acknowledgment, or approval, subject to the
conditions and limitations of this section.
(iii) Prohibition.—An agency may not delay or withhold a
remedy by declining to receive or acknowledge a notice under
clause (i).
(iv) Effect of certain actions.—A request for additional
information, referral, or notice of continuing review by an
agency shall not—
(I) extend a deadline under this section; or
(II) prevent a remedy from taking effect.
(B) Build as filed.—
(i) In general.—A remedy shall be provided for an eligible
project activity only to the extent that the activity is
described in an application for a covered authorization under
this section.
(ii) Material changes.—A material change affecting the
eligibility or environmental effects of an eligible project
shall—
(I) require the submission of an updated application; and
(II) cause the review period for the applicable covered
authorization to recommence.
(C) Conditions.—The eligible project shall comply with—
(i) the applicable conservation measures described in
paragraph (4); and
(ii) for any activity requiring a nationwide permit, the
applicable general and regional conditions of the nationwide
permit, including conditions relating to any certification
under section 401 of the Federal Water Pollution Control Act
(33 U.S.C. 1341), in effect on the date of submission of an
application for a covered authorization for the eligible
project.
(D) Oversight.—
(i) In general.—An agency may inspect and prospectively
suspend or revoke a remedy for a documented material
violation or newly discovered material fact affecting the
eligibility of an eligible project, subject to the condition
that the agency shall provide to the project sponsor—
(I) a written notice identifying the grounds for the
suspension or revocation; and
(II) a reasonable opportunity to cure, to the extent
practicable.
(ii) Immediate action.—Notwithstanding clause (i), an
agency may take immediate action pursuant to that clause in
order to prevent imminent harm to human safety or a listed
species.
(iii) Limitations.—A suspension under this subparagraph—
(I) shall be limited to the applicable activity; and
(II) shall not be broader than necessary.
(iv) Effect.—Agency oversight under this subparagraph
shall not extend, or reestablish the availability of, a
remedy solely because the agency failed to act by an
applicable deadline under this section.
(E) Records.—The project sponsor shall—
(i) maintain a record of all filings, notices, and
compliance records under this section; and
(ii) make those items available to a Federal agency on
request.
(2) FAA and fcc.—
(A) Standard marking and lighting.—
(i) In general.—The eligible project shall use standard
marking and lighting until—
(I) the applicable aircraft detection lighting system is
approved by the Administrator;
(II) all Federal Communications Commission authorizations
required for the operation of the aircraft detection lighting
system are obtained; and
(III) the aircraft detection lighting system commences
operation.
(ii) Prohibition.—An eligible project may not operate an
aircraft detection lighting system before each approval and
authorization described in clause (i) is obtained.
(B) Notice of construction.—The project sponsor shall file
each notice of construction required by the Administrator
with respect to an applicable aircraft detection lighting
system.
(3) Department of the army.—
(A) Nationwide permits.—All work on an eligible project
shall remain within the terms, including acreage and linear-
foot limitations, of the applicable nationwide permit.
(B) Crossing designs; erosion and sediment controls.—The
eligible project shall use standard crossing designs and
erosion and sediment controls.
(C) Special aquatic sites.—No work on an eligible project
shall occur in special aquatic sites.
(D) Delineations.—A delineation submitted with a request
for an approved jurisdictional determination under this
section shall be prepared—
(i) in accordance with the 1987 Corps of Engineers Wetlands
Delineation Manual and any applicable regional supplement to
that manual;
(ii) by a qualified professional wetland scientist; and
(iii) with the field survey completed within the
appropriate season.
(4) United states fish and wildlife service.—
(A) Conservation measures.—
(i) In general.—The eligible project shall implement the
standard conservation measures, including avoidance, seasonal
work windows, buffers, and trenchless methods, at all
crossings.
(ii) Additional measures.—In addition to the standard
conservation measures, an eligible project relying on a
remedy under subparagraph (C)(ii) or (D)(ii) of subsection
(e)(4) shall implement the measures included in the
applicable habitat conservation plan.
(B) Listed bats.—If listed bats may be present onsite of
an eligible project, the eligible project—
(i) shall limit tree removal to the minimum required for
construction, and mark clearing limits in the field before
clearing;
(ii)(I) shall avoid tree removal in suitable habitat during
the pup season (May 1 through July 31), or during such other
dates as the local field office may establish; and
(II) if avoidance described in subclause (I) is not
possible, shall—
(aa) conduct visual emergence surveys of trees 9 inches or
more in diameter at breast height; and
(bb) delay removal of such trees if listed bats are
observed;
(iii) shall not remove any documented roost tree, or any
tree located within 150 feet of a documented maternity roost;
(iv) shall schedule bridge and culvert work—
(I) outside the pup season described in clause (ii)(I); and
(II) during the winter season, when listed bats are known
to use a structure, as established in cooperation with the
local field office;
(v) shall use downward-facing, full cut-off lighting, and
direct temporary lighting away from suitable habitat, except
for lighting required under paragraph (2);
(vi) shall ensure that fueling and other spill-risk
activities are conducted not less than 300 feet from any
caves, sinkholes, losing streams, and springs in karst areas;
and
(vii) during nighttime hours in the autumn migration season
specified in the bird and bat conservation strategy or
habitat conservation plan submitted with a complete
application, when ambient temperature exceeds 50 degrees
Fahrenheit, shall feather turbine blades so that rotor speed
does not exceed 3 revolutions per minute at wind speeds below
the cut-in speed, which shall be not less than 3, and not
more than 4, meters per second, as specified in the bird and
bat conservation strategy or habitat conservation plan,
subject to the conditions that—
(I) the specified season and cut-in speed shall apply
without further approval by the local field office under this
section;
(II) a facility operating on the date of enactment of this
Act shall implement this clause to the extent feasible; and
(III) any more-protective condition contained in an
applicable habitat conservation plan shall control.
(C) Listed plants.—If a listed plant may be present onsite
of an eligible project, the eligible project shall—
(i) mark listed plant areas and maintain a 50-foot buffer
from those areas;
(ii) avoid ground disturbance, vegetation removal, and
hydrologic changes in suitable listed plant habitat; and
(iii) clean equipment before entering the eligible project
site.
(D) Other listed species.—
(i) In general.—For any other listed species identified in
an IPaC species screening, the project sponsor shall
implement applicable species-specific conservation measures
published as of the date of enactment of this Act or
established in an applicable conservation strategy or habitat
conservation plan submitted with the applicable complete
application.
(ii) Deemed authorizations.—A deemed take authorization
under subparagraph (C)(ii) or (D)(ii) of subsection (e)(4)
shall extend to a listed species described in clause (i) only
to the extent that the habitat conservation plan submitted
with the applicable complete application—
(I) specifies measures in accordance with section
10(a)(2)(A) of the Endangered Species Act of 1973 (16 U.S.C.
1539(a)(2)(A)); and
(II) expressly identifies the listed species and any
authorized take of that species.
(iii) Treatment.—No additional approval by a local field
office or subsequent publication of any measure shall be
required solely to invoke a remedy under this section.
(E) Monitoring.—The eligible project shall complete not
less than 1 year of post-construction monitoring in
accordance with the Land-Based Wind Energy Guidelines.
(F) Stop work.—
(i) In general.—If a listed species is encountered during
construction of the eligible project in circumstances not
addressed by the applicable conservation measures or habitat
conservation plan—
(I) the project sponsor shall—
(aa) suspend work only at the affected location;
(bb) notify the United States Fish and Wildlife Service of
the encounter; and
(cc) implement applicable avoidance measures;
(II) any activities unaffected by the encounter may
continue; and
(III) an activity affected by the encounter may resume when
the activity can proceed in compliance with the applicable
covered authorization and conservation measures.
(ii) Effect.—Nothing in this subparagraph authorizes an
otherwise prohibited take.
(5) Eagle general permits.—
(A) In general.—An eligible project relying on a general
permit described in subsection (e)(5) shall comply with the
applicable conditions of that permit, including avoidance,
minimization, monitoring, reporting, and compensatory
mitigation.
(B) Effect.—Nothing in this section authorizes—
(i) an eagle nest take; or
(ii) any activity outside the scope of an applicable permit
described in subparagraph (A).
(h) Standard Conditions.—
(1) In general.—Not later than 90 days after the date of
enactment of this Act, the Administrator, the Secretary of
the Army, and the Director shall publish standard conditions
for purposes of implementing subsection (g).
(2) Scope.—A publication under paragraph (1)—
(A) may clarify any applicable eligibility criteria; but
(B) may not—
(i) add any applicable eligibility criterion;
(ii) impose any substantive obligation beyond the
obligations described in subsection (g); or
(iii) delay, or impose a condition on, an available remedy.
(3) Failure to publish.—A failure by the Administrator,
the Secretary of the Army, or the Director to publish
standard conditions under paragraph (1) shall not affect any
deadline or remedy under this section.
(4) Rulemaking not required.—A rulemaking under section
553 of title 5, United States Code, shall not be required for
a publication under this subsection.
(i) Relationship to Section 1401.—
(1) In general.—An authorization arising by operation of
law under subsection (e)(4)(E), and any other covered
authorization deemed to be effective under subsection (e),
shall be treated as a Federal authorization or permit for
purposes of section 1401 to the extent necessary for the
applicable activity.
(2) Effect.—Nothing in this subsection establishes that a
project has secured all other Federal authorizations and
permits necessary for construction or operation.
(j) Savings Provisions.—Nothing in this section—
(1) except as provided in subsection (e)(4), authorizes any
take prohibited under the Endangered Species Act of 1973 (16
U.S.C. 1531 et seq.);
(2) authorizes any take of bald or golden eagles without a
valid permit, or otherwise waives any requirement of the Act
of June 8, 1940 (commonly known as the “Bald and Golden
Eagle Protection Act”) (16 U.S.C. 668 et seq.), except for
the preservation of general permit eligibility expressly
provided in subsection (e)(5);
(3) waives any applicable requirement under section 401 of
the Federal Water Pollution Control Act (33 U.S.C. 1341) or
section 307(c)(3)(A) of the Coastal Zone Management Act of
1972 (16 U.S.C. 1456(c)(3)(A));
(4) except as expressly provided in subsection (e)(1)(C),
affects review under section 183a of title 10, United States
Code;
(5) affects any applicable State, local, or Tribal
requirement or any reserved Tribal right;
(6) affects any existing Federal authorization or permit or
precludes a Federal authorization or permit in effect under
otherwise applicable law; or
(7) except as expressly provided in subsection
(e)(4)(E)(v), affects the application of the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or
section 7 of the Endangered Species Act of 1973 (16 U.S.C.
1536) to a Federal agency action.
(k) Application Window.—
(1) In general.—This section applies to any covered
authorization for which a complete application is received
during the 3-year period beginning on the date of enactment
of this Act.
(2) Effect of expiration.—If a review period with respect
to a covered authorization that commences during the period
described in paragraph (1) expires after the end of that
period, each applicable remedy shall remain available and
effective for the authorized activity and duration, subject
to subsection (g).
SA 6962. Mr. HEINRICH (for Mr. King) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place, insert the following:
SEC. . WAIVER AND LIMITATION FOR CERTAIN WIND PROJECTS.
(a) Waiver.—Congress waives the requirement to obtain any
approval, authorization, permit, mitigation agreement, or
similar document from any Federal agency for the wind
projects described in subsection (c).
(b) Limitation.—No Federal agency may take any action to
stop the construction or operation at full capacity of any
wind project described in subsection (c) without first
obtaining an order from the United States Court of Appeals
for the District of Columbia Circuit.
(c) Wind Projects.—The wind projects referred to in
subsections (a) and (b) are as follows:
(1) Big River Wind Project, located in Arlington, Oregon.
(2) Bliss Wind Repowering Project, located in Eagle, New
York.
(3) Brady Island Wind Project, located in Brady, Nebraska.
(4) Campbell Hill Windpower Wind Project, located in
Glenrock, Wyoming.
(5) Cavell Wind Project, located in Dimmitt, Texas.
(6) Deuel Harvest Wind Energy South Project, located in
Brandt, South Dakota.
(7) Goldrush Apple Wind Project, located in Edelstein,
Illinois.
(8) Great Bend Wind Project, located in Davenport,
Washington.
(9) Greenswitch Wind Project, located in Maroa, Illinois.
(10) High Bridge Wind Project, located in Guilford, New
York.
(11) High Majestic II Wind Project, located in Panhandle,
Texas.
(12) Home Range Clean Power Wind Project, located in Garden
City, Kansas.
(13) Imperial Wind Project, located in Shaniko, Oregon.
(14) Knox County Wind Project, located in Oneida, Illinois.
(15) Lariat Wind Project, located in Muleshoe, Texas.
(16) Las Crestas Wind Project, located in Zapata, Texas.
(17) Lazbuddie Wind Energy II Project, located in Friona,
Texas.
(18) Maple Harvest Wind Project, located in Tully, New
York.
(19) Meadow Lake II Repower Project, located in Chalmers,
Indiana.
(20) North Hills Wind Project, located in Cresco, Iowa.
(21) Pecos County Phase II Wind Project, located in Fort
Stockton, Texas.
(22) Prairie Phoenix Wind Repower Project, located in Mart,
Texas.
(23) Project Dumas Wind Project, located in Moore County,
Texas.
(24) Pronghorn H2 Project Wind Project, located in
Glenrock, Wyoming.
(25) Riverside Wind Project, located in Spokane,
Washington.
(26) San Juan Mesa Wind Project, located in Elida, New
Mexico.
(27) Serenity Phase I Wind Project, located in Amarillo,
Texas.
(28) Spring Point Wind Project, located in Shelbyville,
Illinois.
(29) SunZia Wind North Wind Project, located in Clines
Corners, New Mexico.
(30) Thresher Wind Energy Center Wind Project, located in
Plains, Kansas.
(31) Top Crop I and II Wind Project, located in Odell,
Illinois.
(32) Top of the World Windpower Project, located in
Glenrock, Wyoming.
(33) Towner Wind Energy II Project, located in Lamar,
Colorado.
(34) Triton Wind Energy Project, located in Garden City,
Kansas.
(35) Whitetail Wind Project, located in Lancaster,
Wisconsin.
(36) Windswept Plain Wind Project, located in Shelbyville,
Illinois.
(37) Adams County Wind Project, located in Colorado.
(38) Banner Wind Project, located in Nebraska.
(39) Blackwell Wind Project, located in Texas.
(40) Breckinridge Repower Wind Project, located in
Oklahoma.
(41) Canisteo Wind Project, located in New York.
(42) Capricorn Ridge I Repower Wind Project, located in
Texas.
(43) Chapman Ranch Wind Project, located in Texas.
(44) Chinook Flatts Wind Project, located in Colorado.
(45) Cloudwalker Wind Project, located in Washington.
(46) Columbia Wind Project, located in Wisconsin.
(47) Cotton River Wind Project, located in Minnesota.
(48) Crider Valley Wind Project, located in Washington.
(49) Fisher County Wind Project, located in Texas.
(50) Foxglove Wind Project, located in Illinois.
(51) Gusty Windpower Wind Project, located in Texas.
(52) Half Moon Wind Project, located in Illinois.
(53) Hammerhead Wind Project, located in Kansas.
(54) Homestead Wind Project, located in North Dakota.
(55) Horse Hollow I Wind Project, located in Texas.
(56) Horse Hollow II Wind Project, located in Texas.
(57) Horse Hollow IV Wind Project, located in Texas.
(58) Horse Thief Wind Project, located in Kansas.
(59) Lower Snake River II Wind Project, located in
Washington.
(60) Mammoth Plains Wind Project, located in Oklahoma.
(61) Mirando Valley Wind Project, located in Texas.
(62) Musketeer Wind Project, located in Illinois.
(63) North Country Wind Project, located in New York.
(64) Pecos Flat Wind Project, located in Texas.
(65) Pottawattamie County Wind Project, located in Iowa.
(66) Red Lake Wind Project, located in New Mexico.
(67) Riverbend Wind Project, located in Michigan.
(68) Saginaw Wind Project, located in Michigan.
(69) Settler Wind Project, located in Wyoming.
(70) Sioux County Wind Project, located in Nebraska.
(71) Solano V Wind Project, located in California.
(72) Springs Wind Project, located in West Virginia.
(73) Terrace Sands Wind Project, located in Illinois.
(74) Three Flags Wind Project, located in Washington.
(75) Tupper Lake Wind Project, located in Michigan.
(76) Tuscola I Wind Project, located in Michigan.
(77) Vermilion Grove Wind Project, located in Illinois.
(78) Water Valley Wind Project, located in Texas.
(79) Webb County Energy Hub Wind Project, located in Texas.
(80) Windjammer Wind Project, located in Texas.
(81) 41 Wind Project, located in Burleigh County, North
Dakota.
(82) Adam Wind Turbine Wind Project, located in Lee County,
Illinois.
(83) Aledo Wind Project, located in Mercer County,
Illinois.
(84) Anemontana Wind Project, located in Wheatland County,
Montana.
(85) Ashtabula I Repower Wind Project, located in Barnes
County, North Dakota.
(86) Big River Wind Project, located in Des Moines County,
Iowa.
(87) Big Top Mesa I Wind Project, located in Texas.
(88) Big Top Mesa II Wind Project, located in Texas.
(89) Black Maple Wind Project, located in Taylor County,
Iowa.
(90) Blue Lacy Wind Project, located in Wyoming.
(91) Blue Sky/Hill Repower Wind Project, located in Hancock
County, Maine.
(92) Box Car Wind Project, located in Lyon, Murray, and
Pipestone Counties, Minnesota.
(93) Breezy Meadows Wind Project, located in Knox County,
Illinois.
(94) Bronco Wind Project, located in Texas.
(95) BSH Kilgore Wind Project, located in Cherry County,
Nebraska.
(96) Buffalo Branch Wind Project, located in Dade County,
Missouri.
(97) Ciervo Wind Project, located in Jim Hogg County,
Texas.
(98) Crossroads Wind Project, located in Sunflower County,
Mississippi.
(99) Desert Vine Wind Project, located in Cochise County,
Arizona.
(100) Dusty Rose Wind II Wind Project, located in Kit
Carson County, Colorado.
(101) Emmons Logan Repower Wind Project, located in Emmons
County, North Dakota.
(102) Endeavor Wind I Repower Wind Project, located in
Osceola County, Iowa.
(103) Endeavor Wind II Repower Wind Project, located in
Osceola County, Iowa.
(104) Eve Wind Turbine Wind Project, located in Lee County,
Illinois.
(105) Flickertail Wind Project, located in Wells and Eddy
Counties, North Dakota.
(106) Floyd Wind Project, located in Floyd County, Texas.
(107) Floyd East Wind Project, located in Floyd County,
Texas.
(108) Forged Ethic Wind Project, located in Coconino
County, Arizona.
(109) Four Creeks Wind Project, located in Peoria County,
Illinois.
(110) Garden Wind Project, located in Delta County,
Michigan.
(111) Golden Hay Wind Project, located in Kit Carson
County, Colorado.
(112) Goodnight Wind Project, located in Armstrong County,
Texas.
(113) Great Gale Wind Project, located in Hancock County,
Illinois.
(114) Green Sun Wind Project, located in Emmet County,
Iowa.
(115) Halcon Wind Project, located in Starr County, Texas.
(116) Haymaker I Wind Project, located in Wheatland and
Meagher Counties, Montana.
(117) Haymaker IIIa Wind Project, located in Wheatland and
Meagher Counties, Montana.
(118) Haymaker IIIb Wind Project, located in Wheatland and
Meagher Counties, Montana.
(119) Haymaker IIIc Wind Project, located in Wheatland and
Meagher Counties, Montana.
(120) Haymaker IIId Wind Project, located in Wheatland and
Meagher Counties, Montana.
(121) Henryetta Wind Project, located in Okmulgee and
Okfuskee Counties, Oklahoma.
(122) Henryetta Alt Layout Wind Project, located in
Okmulgee and Okfuskee Counties, Oklahoma.
(123) Ida Grove I Wind Project, located in Ida County,
Iowa.
(124) Kansas Republican Wind Project, located in Smith
County, Kansas.
(125) Lava Run Wind Project, located in Apache County,
Arizona.
(126) Lava Run 2 Wind Project, located in Apache County,
Arizona.
(127) Limon III Wind Project, located in Lincoln and Elbert
Counties, Colorado.
(128) Lone Star II Repower Wind Project, located in
Shackelford and Callahan Counties, Texas.
(129) Lucky Star 2 Wind Project, located in Albany and
Carbon Counties, Wyoming.
(130) Magnolia Wind Project, located in Tunica and Quitman
Counties, Mississippi.
(131) Michigan Wind I Repower Wind Project, located in
Huron County, Michigan.
(132) Montgomery Ranch 2 Wind Project, located in Foard
County, Texas.
(133) Murray Wind Project, located in Adams and Madison
Counties, Iowa.
(134) New Salem Wind Project, located in Morton County,
North Dakota.
(135) Notrees Wind Project, located in Ector and Winkler
Counties, Texas.
(136) Number Nine Wind Project, located in Aroostook
County, Maine.
(137) Ogemaw Wind Project, located in Ogemaw County,
Michigan.
(138) Overlands Pass East II Wind Project, located in
Sedgwick County, Colorado.
(139) Roscoe Repower Wind Project, located in Mitchell,
Nolan, Fisher, and Scurry Counties, Texas.
(140) Rose Creek Wind Project, located in Mower County,
Minnesota.
(141) San Juan Wind Project, located in San Juan County,
Utah.
(142) San Juan East Wind Project, located in San Juan
County, Utah.
(143) Sand Lily Wind Project, located in Yuma County,
Colorado.
(144) Sentinel Wind Project, located in Lincoln County,
Colorado.
(145) Silver Oak Wind Project, located in Chaves and Lea
Counties, New Mexico.
(146) Stockcar Wind Project, located in Murray County,
Minnesota.
(147) Switchgrass Wind Project, located in Kit Carson
County, Colorado.
(148) Village Creek Wind Project, located in Cross County,
Arkansas.
(149) Viracocha/Rooney Ranch Wind Project, located in
Alameda County, California.
(150) Whispering Willow South Wind Project, located in
Franklin County, Iowa.
(151) Yellowstone Trail Wind Project, located in Day
County, South Dakota.
SA 6963. Mr. HEINRICH (for Mr. King) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal
than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place, insert the following:
SEC. . WAIVER AND LIMITATION FOR CERTAIN WIND PROJECTS.
(a) Waiver.—Congress waives the requirement to obtain any
approval, authorization, permit, mitigation agreement, or
similar document from any Federal agency for the wind
projects described in subsection (c).
(b) Limitation.—No Federal agency may take any action to
stop the construction or operation at full capacity of any
wind project described in subsection (c) without first
obtaining an order from the United States Court of Appeals
for the District of Columbia Circuit.
(c) Wind Projects.—The wind projects referred to in
subsections (a) and (b) are as follows:
(1) Big River Wind Project, located in Arlington, Oregon.
(2) Bliss Wind Repowering Project, located in Eagle, New
York.
(3) Brady Island Wind Project, located in Brady, Nebraska.
(4) Campbell Hill Windpower Wind Project, located in
Glenrock, Wyoming.
(5) Cavell Wind Project, located in Dimmitt, Texas.
(6) Deuel Harvest Wind Energy South Project, located in
Brandt, South Dakota.
(7) Goldrush Apple Wind Project, located in Edelstein,
Illinois.
(8) Great Bend Wind Project, located in Davenport,
Washington.
(9) Greenswitch Wind Project, located in Maroa, Illinois.
(10) High Bridge Wind Project, located in Guilford, New
York.
(11) High Majestic II Wind Project, located in Panhandle,
Texas.
(12) Home Range Clean Power Wind Project, located in Garden
City, Kansas.
(13) Imperial Wind Project, located in Shaniko, Oregon.
(14) Knox County Wind Project, located in Oneida, Illinois.
(15) Lariat Wind Project, located in Muleshoe, Texas.
(16) Las Crestas Wind Project, located in Zapata, Texas.
(17) Lazbuddie Wind Energy II Project, located in Friona,
Texas.
(18) Maple Harvest Wind Project, located in Tully, New
York.
(19) Meadow Lake II Repower Project, located in Chalmers,
Indiana.
(20) North Hills Wind Project, located in Cresco, Iowa.
(21) Pecos County Phase II Wind Project, located in Fort
Stockton, Texas.
(22) Prairie Phoenix Wind Repower Project, located in Mart,
Texas.
(23) Project Dumas Wind Project, located in Moore County,
Texas.
(24) Pronghorn H2 Project Wind Project, located in
Glenrock, Wyoming.
(25) Riverside Wind Project, located in Spokane,
Washington.
(26) San Juan Mesa Wind Project, located in Elida, New
Mexico.
(27) Serenity Phase I Wind Project, located in Amarillo,
Texas.
(28) Spring Point Wind Project, located in Shelbyville,
Illinois.
(29) SunZia Wind North Wind Project, located in Clines
Corners, New Mexico.
(30) Thresher Wind Energy Center Wind Project, located in
Plains, Kansas.
(31) Top Crop I and II Wind Project, located in Odell,
Illinois.
(32) Top of the World Windpower Project, located in
Glenrock, Wyoming.
(33) Towner Wind Energy II Project, located in Lamar,
Colorado.
(34) Triton Wind Energy Project, located in Garden City,
Kansas.
(35) Whitetail Wind Project, located in Lancaster,
Wisconsin.
(36) Windswept Plain Wind Project, located in Shelbyville,
Illinois.
(37) Adams County Wind Project, located in Colorado.
(38) Banner Wind Project, located in Nebraska.
(39) Blackwell Wind Project, located in Texas.
(40) Breckinridge Repower Wind Project, located in
Oklahoma.
(41) Canisteo Wind Project, located in New York.
(42) Capricorn Ridge I Repower Wind Project, located in
Texas.
(43) Chapman Ranch Wind Project, located in Texas.
(44) Chinook Flatts Wind Project, located in Colorado.
(45) Cloudwalker Wind Project, located in Washington.
(46) Columbia Wind Project, located in Wisconsin.
(47) Cotton River Wind Project, located in Minnesota.
(48) Crider Valley Wind Project, located in Washington.
(49) Fisher County Wind Project, located in Texas.
(50) Foxglove Wind Project, located in Illinois.
(51) Gusty Windpower Wind Project, located in Texas.
(52) Half Moon Wind Project, located in Illinois.
(53) Hammerhead Wind Project, located in Kansas.
(54) Homestead Wind Project, located in North Dakota.
(55) Horse Hollow I Wind Project, located in Texas.
(56) Horse Hollow II Wind Project, located in Texas.
(57) Horse Hollow IV Wind Project, located in Texas.
(58) Horse Thief Wind Project, located in Kansas.
(59) Lower Snake River II Wind Project, located in
Washington.
(60) Mammoth Plains Wind Project, located in Oklahoma.
(61) Mirando Valley Wind Project, located in Texas.
(62) Musketeer Wind Project, located in Illinois.
(63) North Country Wind Project, located in New York.
(64) Pecos Flat Wind Project, located in Texas.
(65) Pottawattamie County Wind Project, located in Iowa.
(66) Red Lake Wind Project, located in New Mexico.
(67) Riverbend Wind Project, located in Michigan.
(68) Saginaw Wind Project, located in Michigan.
(69) Settler Wind Project, located in Wyoming.
(70) Sioux County Wind Project, located in Nebraska.
(71) Solano V Wind Project, located in California.
(72) Springs Wind Project, located in West Virginia.
(73) Terrace Sands Wind Project, located in Illinois.
(74) Three Flags Wind Project, located in Washington.
(75) Tupper Lake Wind Project, located in Michigan.
(76) Tuscola I Wind Project, located in Michigan.
(77) Vermilion Grove Wind Project, located in Illinois.
(78) Water Valley Wind Project, located in Texas.
(79) Webb County Energy Hub Wind Project, located in Texas.
(80) Windjammer Wind Project, located in Texas.
SA 6964. Mr. HEINRICH (for Mr. King) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place, insert the following:
SEC. . ADMINISTRATIVE REQUIREMENTS FOR MILITARY AVIATION
AND INSTALLATION ASSURANCE CLEARINGHOUSE.
(a) In General.—Section 183a of title 10, United States
Code, is amended—
(1) by redesignating subsection (h) as subsection (i); and
(2) by inserting after subsection (g) the following:
“(h) Timelines.—(1) For any project for which the
Secretary of Defense determines, based on the preliminary
review conducted under subsection (c), that the proposed
action may have an adverse impact on operations and readiness
of the armed forces, the Secretary shall complete the review
under subsection (d), conduct any mitigation discussions the
Secretary determines appropriate, and issue a final
determination consistent with subsections (c) and (e),
including whether the proposed project would result in an
unacceptable risk to the national security of the United
States, not later than 180 days after the date on which the
Clearinghouse receives the relevant notice, filing, or
request for review, unless the applicant agrees in writing to
an extension.
“(2) For any project for which the Secretary of Defense
determines, based on the preliminary review conducted under
subsection (c), that the proposed action does not have an
adverse impact on operations and readiness of the armed
forces, the Secretary shall issue a final determination
consistent with subsections (c) and (e), including whether
the proposed project would result in an unacceptable risk to
the national security of the United States, not later than
five days after completion of the preliminary review.
“(3) The Secretary may not extend, restart, or otherwise
delay a deadline established under this subsection based on
requests for additional information, recharacterization of
previously identified issues, ongoing mitigation discussions,
or the absence of an executed mitigation agreement.
“(4) For purposes of this subsection, a notice, filing, or
request for review shall be deemed received by the
Clearinghouse on the earlier of—
“(A) the date on which the Clearinghouse actually receives
such notice, filing, or request; or
“(B) the date that is 60 days after the applicant provides
notice to the Clearinghouse that it has submitted to a
Federal agency information sufficient to initiate review
under this section.
“(5) Failure to meet any deadline under this subsection
shall constitute an unreasonable delay.
“(6) Nothing in this subsection shall be construed to
modify or alter the substantive standards or national
security authorities applicable under this section, but only
to establish procedural requirements governing the timing and
completion of review by the Department of Defense.”.
(b) Applicability.—With respect to a project described in
subsection (h)(1) of section 183a of title 10, United States
Code, for which the relevant notice, filing, or request for
review was submitted before the date of the enactment of this
Act, the Secretary shall comply with the requirements under
such subsection by not later than the later of—
(1) 180 days after the date on which the Military Aviation
and Installation Assurance Siting Clearinghouse received and
recorded the relevant notice, filing, or request for review;
or
(2) 90 days after the date of the enactment of this Act.
SA 6965. Mr. MARKEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place in title V of division A, insert
the following:
SEC. 15__. OFFICE OF PUBLIC ENGAGEMENT AND PARTICIPATION.
(a) Definitions.—In this section:
(1) Chair.—The term “Chair” means the Chairman of the
Commission.
(2) Commission.—The term “Commission” means the Nuclear
Regulatory Commission.
(3) Director.—The term “Director” means the Director of
the Office.
(4) Fund.—The term “Fund” means the Intervenor Trust
Fund established under subsection (i)(1).
(5) Office.—The term “Office” means the Office of Public
Engagement and Participation established under subsection
(b).
(6) Panel.—The term “Panel” means the Atomic Safety and
Licensing Board Panel.
(7) Participant.—The term “participant” has the meaning
given the term in section 2.4 of title 10, Code of Federal
Regulations (as in effect on the date of enactment of this
Act).
(8) Proceeding.—The term “proceeding” means any
proceeding under the jurisdiction of the Panel.
(9) Significant financial hardship.—The term “significant
financial hardship”, with respect to a participant in a
proceeding before the Commission, means that the participant
cannot afford, without undue hardship to that participant or
the applicable entities represented by that participant, to
pay the costs of effective participation in the proceeding,
including attorney's fees, expert witness fees, and other
reasonable costs of participation.
(10) Substantial contribution.—The term “substantial
contribution”, with respect to a participant in a proceeding
before the Commission, means that, as determined by the
Office, in consultation with the Panel, the contributions of
that participant are likely to assist the Commission in
making an order or decision, based on the contentions made by
that participant for the purpose of protecting the health and
safety of the public with respect to issues under the
jurisdiction of the Commission.
(b) Establishment.—Under the authorities provided by
sections 25 and 161 d. of the Atomic Energy Act of 1954 (42
U.S.C. 2035, 2201(d)) and section 201(a) of the Energy
Reorganization Act of 1974 (42 U.S.C. 5841(a)), the
Commission shall establish an office, to be known as the
“Office of Public Engagement and Participation”, not later
than 180 days after the date of enactment of this Act.
(c) Director.—
(1) In general.—The Office shall be administered by a
Director.
(2) Appointment.—The Chair shall initiate the appointment,
subject to the approval of the Commission, of the Director
from among individuals who have demonstrated ability in
public engagement, public administration, or judicial
proceedings.
(3) Term.—Subject to paragraph (7), the Director shall
serve for—
(A) a term of 5 years; and
(B) not more than 2 terms.
(4) Duties.—The Director—
(A) shall be responsible for the discharge of the functions
of the Office; and
(B) may appoint, and assign the duties of, staff of the
Office—
(i) as necessary to carry out the functions of the Office;
and
(ii) in accordance with all applicable provisions of title
5, United States Code.
(5) Supervision.—
(A) In general.—The Director—
(i) shall report to and be under the general supervision of
the Commission; but
(ii) shall not report to, or be subject to supervision by—
(I) any individual member of the Commission, including the
Chair; or
(II) any individual officer or employee of the Commission.
(B) Limitation.—Neither the Commission nor any member,
officer, or employee of the Commission may prevent or
prohibit the Director from carrying out any function of the
Office described in subsection (d).
(6) Compensation.—The Director shall be compensated at a
rate of pay not greater than the maximum rate of pay
prescribed for a senior executive in the Senior Executive
Service under section 5382 of title 5, United States Code.
(7) Expiration of term.—A Director may continue to serve
after the expiration of the term of such Director until a
successor is appointed.
(d) Functions of the Office.—The functions of the Office
shall be—
(1) to support public participation in proceedings before
the Commission;
(2) to serve as a liaison to those who advocate for the
public interest on matters within the jurisdiction of the
Commission;
(3) to provide educational and technical guidance and
assistance to members of the public with respect to
participating in proceedings before the Commission, including
guidance in submitting comments, contentions, and hearing
requests;
(4) to coordinate assistance, including financial
assistance, available to participants in proceedings before
the Commission, including by—
(A) providing widely accessible, plain-language resources
and guidance to the public relating to—
(i) eligibility to request compensation with respect to a
proceeding before the Commission;
(ii) completing and submitting a request for compensation,
including information on the documentation necessary to
demonstrate—
(I) a substantial contribution to the proceeding; and
(II) significant financial hardship; and
(iii) deadlines and any other matters relating to a request
for compensation, as determined under rules promulgated by
the Commission; and
(B) publishing in a single location on a website designated
by the Office and in a timely manner—
(i) a notice of a determination by the Panel of eligibility
or ineligibility to relevant participants with respect to
compensation for participation in a proceeding before the
Commission; and
(ii) notice of a determination by the Panel on up-front and
final compensation, as appropriate, to eligible participants;
(5) to increase opportunities for virtual attendance and
participation by members of the public in Commission meetings
and proceedings;
(6) to facilitate the implementation of recommendations
included in the package of the Commission entitled
“Systematic Review of How Agency Programs, Policies, and
Activities Address Environmental Justice”, dated March 29,
2022, and numbered SECY-22-0025 (including enclosures), or
subsequent documents, as approved and assigned to the Office
by the Commission;
(7) to coordinate assistance to the public with respect to
authorities exercised by the Commission; and
(8) to conduct other activities to facilitate transparency
and opportunity for public engagement with the Commission.
(e) Independent Office.—The Chair—
(1) shall take appropriate actions to ensure the
independence of the Office within the Commission, including
independence from other officers and employees of the
Commission; and
(2) shall not prevent or prohibit the Office from
initiating, carrying out, or completing any support for
public participation, including guidance or assistance, that
the Office determines is necessary and appropriate under this
section.
(f) Compensation.—
(1) In general.—Notwithstanding section 502 of the Energy
and Water Development Appropriations Act, 1993 (5 U.S.C. 504
note; Public Law 102-377), and subject to the availability of
appropriations to the Fund, the Panel, in consultation with
the Office, shall provide compensation for all reasonable
attorney's fees, expert witness fees, and other costs of
participating in any proceeding before the Commission to a
participant, if—
(A) the Panel, in consultation with the Office, determines
that the participation of that participant in that proceeding
without receipt of compensation constitutes a significant
financial hardship with respect to that participant; and
(B) the Office, in consultation with the Panel, determines
that the participation of that participant in that proceeding
would likely provide a substantial contribution to the record
of the proceeding.
(2) Guidelines.—
(A) In general.—Not later than 180 days after the date of
enactment of this Act, the Commission shall promulgate a rule
pursuant to which the Panel may provide compensation under
paragraph (1).
(B) Participant eligibility determination.—In establishing
guidelines under subparagraph (A), the Panel, in consultation
with the Office, shall establish a process pursuant to which
a participant has an opportunity to file with the Panel,
alongside a petition to intervene, a notice of intent to
request compensation, in order to receive, at the same time
that a decision on the petition to intervene is issued, a
notification of the eligibility of that participant to
receive compensation based on the determinations
described in subparagraphs (A) and (B) of paragraph (1).
(C) Up-front compensation.—Pursuant to the rule
promulgated under subparagraph (A), the Panel, in
consultation with the Office, shall establish a process to
provide compensation, in the form of grants, prior to the
conclusion of the applicable proceeding, if—
(i) the participant has received approval to act as a party
to the proceeding under the requirements of section 2.309 of
title 10, Code of Federal Regulations (as in effect on the
date of enactment of this Act); and
(ii) the participant submits a summary of eligible,
reasonable costs that the participant expects to incur as an
acting party to the proceeding.
(3) Effect of outcome of proceeding.—After the Panel has
affirmed the eligibility of a participant to receive, and has
provided, compensation under paragraph (1), the compensation
claim or grant under this subsection shall not be affected by
the outcome of the related proceeding, including any
amendment or reversal of a final decision in the related
proceeding.
(4) Appeal of decisions.—
(A) In general.—A participant may appeal a decision
described in subparagraph (B) to the Commission under the
procedures described in section 2.1407 of title 10, Code of
Federal Regulations (as in effect on the date of enactment of
this Act).
(B) Decision described.—A decision referred to in
subparagraph (A) is any decision made by the Panel relating
to financial assistance or compensation under this section
with respect to the applicable participant.
(g) Annual Report.—
(1) In general.—Not later than one year after the date of
enactment of this Act, and annually thereafter, the Director
shall submit to Congress a report on the activities of the
Office.
(2) Requirements.—Each report under paragraph (1) shall
include, for the year covered by the report—
(A) the number and types of requests for assistance
received by the Office;
(B) an assessment of the most common difficulties
encountered by members of the public with participating or
proposing to participate in proceedings before the
Commission;
(C) an accounting of requests for compensation filed with
the Panel pursuant to subsection (f), including an accounting
of payments made to fulfill approved compensation requests;
and
(D) a list of activities undertaken by the Office to follow
recommendations approved and assigned to the Office by the
Commission and outlined in the package of the Commission
entitled “Systematic Review of How Agency Programs,
Policies, and Activities Address Environmental Justice”,
dated March 29, 2022, and numbered SECY-22-0025 (including
enclosures) or subsequent documents.
(h) No Effect on Existing Public Engagement Standards.—
Nothing in this Act reduces, or may be interpreted as
reducing, the standards for the Commission to engage the
public in any proceeding or decision.
(i) Intervenor Trust Fund.—
(1) In general.—The Commission shall establish a fund, to
be known as the “Intervenor Trust Fund”.
(2) Administration.—The Fund shall be administered by the
Office, in coordination with the Panel.
(3) Use of fund.—Notwithstanding section 502 of the Energy
and Water Development Appropriations Act, 1993 (5 U.S.C. 504
note; Public Law 102-377), amounts in the Fund shall be used
by the Panel to satisfy requests for compensation under
subsection (f), in accordance with rules promulgated by the
Commission under subsections (d)(4)(A)(iii) and (f).
(4) Authorization of appropriations to fund.—
Notwithstanding section 502 of the Energy and Water
Development Appropriations Act, 1993 (5 U.S.C. 504 note;
Public Law 102-377), there are authorized to be appropriated
to the Fund such amounts as may be necessary to satisfy
requests for compensation under subsection (f), to remain
available until expended.
(5) Transfer of funds.—Notwithstanding section 1532 of
title 31, United States Code, the Commission may transfer
amounts from an appropriate appropriations account to the
Fund, as the Commission determines necessary to meet the
budgetary requirements of the Fund.
(j) Use of Existing Authority.—In carrying out this
section, the Commission, to the maximum extent practicable,
shall utilize the existing authority of the Commission under
other law, including—
(1) the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.);
(2) the Energy Reorganization Act of 1974 (42 U.S.C. 5801
et seq.); and
(3) any other applicable law.
SA 6966. Mr. MARKEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 56 of the amendment, strike line 2 and insert the
following:
of the dispute or display.
“(v) Scope of authority.—Nothing in this subparagraph
authorizes the Chairman to waive or alter—
“(I) any substantive obligation or standard under Federal
law;
“(II) any consultation, coordination, concurrence,
authorization, or other procedural obligation under Federal
law with respect to a non-Federal entity, including a State,
Indian Tribe, local government, or private party; or
“(III) any standard for judicial review with respect to an
authorization.”;
SA 6967. Mr. MARKEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of section 2117, add the following:
(g) Environmental Impacts.—
(1) Definitions.—In this subsection:
(A) Administrator.—The term “Administrator” means the
Administrator of the Environmental Protection Agency.
(B) Data center.—The term “data center” means any
facility, or group of facilities with the same owner in the
same utility area that—
(i) primarily contains electronic equipment used to host
information and information systems accessed by other systems
or by users on other devices both in and outside of the State
in which the facility or group of facilities is located;
(ii) is a free-standing structure or a facility within a
larger structure that uses environmental control equipment to
maintain the proper conditions for the operation of
electronic equipment;
(iii) has an energy demand greater than 50 megawatts; and
(iv) meets such other criteria as the Federal
Communications Commission determines to be appropriate for
purposes of this section, including anticircumvention
provisions.
(C) Data center corporation.—The term “data center
corporation” means any corporation, joint-stock company,
partnership, association, business trust, or organized group
of persons, whether incorporated or not, or a receiver or
trustee of such, that owns or proposes to own a data center.
(2) Certificate requirements for data centers.—
(A) Definition.—In this paragraph, the term “Commission”
means the Federal Communications Commission.
(B) Certificate required.—
(i) In general.—Before proposed construction activities
may begin with respect to a data center, the data center
corporation with respect to the data center shall be required
to obtain from the Commission a certificate certifying that
the construction of the data center will not harm the public
interest.
(ii) Evaluation of application.—
(I) In general.—With respect to an application for a
certificate described in clause (i), the Commission shall
evaluate the potential impacts of the applicable data center
on—
(aa) air quality, including local, upstream, and downstream
emissions of air pollutants;
(bb) water quality, including toxic and priority pollutant
concentration levels, temperature, turbidity, and nutrient
levels;
(cc) the local and watershed-level availability and cost of
water, including the impacts on wastewater services;
(dd) the average levels of noise and light within 2 miles
of the proposed site of the data center;
(ee) energy costs and electricity system reliability,
particularly for residential and commercial ratepayers within
the same regional electricity market as the data center, as
determined by the Federal Energy Regulatory Commission;
(ff) the local ecosystem and wildlife;
(gg) the local economy, including through the offering of
public subsidies and tax exemptions;
(hh) community well-being, including the establishment of
community benefits agreements; and
(ii) jobs, particularly the creation of full-time jobs with
wages that are not less than the prevailing wage rates for
the class in the applicable locality.
(II) Consultation.—In conducting an evaluation required
under subclause (I), the Commission shall consult with all
relevant Federal, State, local, Tribal, and regional
authorities (as determined based on the location of the
applicable data center), including—
(aa) the Environmental Protection Agency, the Department of
Energy, the Federal Energy Regulatory Commission, and other
Federal agencies determined appropriate by the Commission;
(bb) local, State, and Tribal—
(AA) environmental protection agencies;
(BB) zoning boards;
(CC) siting and permitting authorities;
(DD) energy and economic development agencies; and
(EE) consumer advocates;
(cc) State public utility commissions;
(dd) Transmission Organizations, as defined in section 3 of
the Federal Power Act (16 U.S.C. 796);
(ee) the regional commission or committee that represents
the interests of States with respect to the relevant regional
electricity market; and
(ff) other relevant Federal, State, local, Tribal, and
regional authorities, as determined appropriate by the
Commission.
(iii) Determination.—The Commission shall issue a
certificate described in clause (i) if, after conducting the
evaluation required under clause (ii), the Commission
determines that the proposed data center will not harm the
public interest.
(iv) Ongoing compliance; enforcement.—After issuing a
certificate under clause (i) with respect to a data center,
the Commission—
(I) shall, not later than 2 years after issuing that
certificate, and once every 2 years thereafter—
(aa) assess whether the data center remains in compliance
with that certificate, as determined by evaluating the data
center pursuant to the requirements under clause (ii); and
(bb) as part of the assessment required under item (aa),
establish a publicly noticed and accessible process through
which affected members of the public may submit documentation
or provide comment with respect to the certificate; and
(II) if the Commission, during an assessment conducted
under subclause (I) of this clause, determines that a data
center does not remain in compliance with that certificate,
as determined as described in subclause (I)(aa) of this
clause, may take action and pursue remedies to ensure that
the data center remains in compliance, including by imposing
fines that are proportionate to the duration and degree by
which the data center is not in compliance.
(C) Savings clause.—Nothing in this paragraph shall
preempt or render void any State or local regulation relating
to the construction or operation of a data center.
(3) Identifying air pollution and disparate impacts of data
center development and investing in community response.—
(A) In general.—The Administrator may—
(i) pursuant to subsections (b) through (e) of section 103
of the Clean Air Act (42 U.S.C. 7403), make grants, enter
into contracts, or carry out other activities described in
that section to identify, monitor, and increase community
response capabilities against environmental or public health
harms from changes in air quality associated with the
construction and operation of data centers and associated
energy infrastructure, with a priority for activities that
serve communities with greater cumulative environmental or
public health burdens; and
(ii) make grants and carry out other activities with
respect to the changes in air quality described in paragraph
(1) authorized under section 105 of the Clean Air Act (42
U.S.C. 7405).
(B) Authorization of appropriations.—
(i) In general.—In addition to any other amounts
authorized to be appropriated to carry out sections 103 and
105 of the Clean Air Act (42 U.S.C. 7403, 7405), there are
authorized to be appropriated to the Administrator for each
of fiscal years 2027 through 2031, to remain available until
expended—
(I) $50,000,000 to carry out subparagraph (A)(i); and
(II) $50,000,000 to carry out subparagraph (A)(ii).
(ii) Administrative expenses.—Of the amounts made
available under subclauses (I) and (II) of clause (i) in a
fiscal year, the Administrator shall reserve 5 percent for
the administrative costs necessary to carry out the
activities funded under those subclauses.
(4) Water quality monitoring.—
(A) In general.—The Administrator may—
(i) in addition to the purposes for which grants may be
provided under section 106 of the Federal Water Pollution
Control Act (33 U.S.C. 1256), make additional grants to, or
enter into cooperative agreements or contracts with, entities
eligible to receive grants under that section for water
quality monitoring and water pollution control related to
existing or expected impacts on water systems occurring as a
result of the construction and operation of data centers and
associated energy infrastructure; and
(ii) make grants to the entities described in clause (i) to
obtain or contract for technical assistance relating to the
purposes described in that clause.
(B) Authorization of appropriations.—In addition to any
other amounts authorized to be appropriated to carry out
section 106 of the Federal Water Pollution Control Act (33
U.S.C. 1256), there are authorized to be appropriated to the
Administrator for each of fiscal years 2027 through 2031, to
remain available until expended—
(i) $100,000,000 to carry out subparagraph (A)(i); and
(ii) $30,000,000 to carry out subparagraph (A)(ii).
(5) Federal resources for mitigation of noise pollution.—
(A) Study.—
(i) In general.—The Administrator shall carry out a study
on the health impacts of noise from data centers and on-site
energy generation, including an examination of—
(I) the selection of noise measurement methodologies by
relevant State and local agencies with respect to that noise;
(II) the threshold at which health impacts from that noise
is felt;
(III) the effectiveness of various noise abatement
methodologies used at data centers and on-site energy
generators; and
(IV) new and emerging noise abatement methodologies that
may, or have the potential to, mitigate the extent of noise
pollution impacts from data centers and on-site energy
generation.
(ii) Report.—
(I) In general.—Not later than 2 years after the date of
enactment of this Act, the Administrator shall submit to
Congress a report describing the results of the study
conducted under clause (i).
(II) Requirements.—The report required under subclause (I)
shall include specific recommendations on new measures that
can be implemented to mitigate the impact of data centers and
on-site energy generation on surrounding communities.
(B) Grants under the quiet communities program.—Section 14
of the Noise Control Act of 1972 (42 U.S.C. 4913) is
amended—
(i) in subsection (b)—
(I) in the matter preceding paragraph (1), by striking
“but not limited to”;
(II) in paragraph (2), by striking “sections 6, 7, and 8
of this Act” and inserting “section 6 or 8, or section
44715 of title 49, United States Code”; and
(III) by redesignating paragraphs (1) through (5) as
subparagraphs (A) through (E), respectively, and indenting
appropriately;
(ii) in subsection (c)—
(I) in the matter preceding paragraph (1), by striking
“but not be limited to” and inserting “in accordance with
Federal authority pursuant to this Act to regulate sources of
noise in interstate commerce”;
(II) in paragraph (1)—
(aa) in subparagraph (C), by striking “and” at the end;
(bb) by redesignating subparagraphs (A) through (D) as
clauses (i) through (iv), respectively, and indenting
appropriately; and
(cc) by adding at the end the following:
“(v) establishing and implementing training programs on
use of noise abatement equipment; and
“(vi) implementing noise abatement plans;”;
(III) by striking the undesignated matter following
paragraph (5); and
(IV) by redesignating paragraphs (1) through (5) as
subparagraphs (A) through (E), respectively, and indenting
appropriately;
(iii) by redesignating subsections (a) through (g) as
paragraphs (1) through (7), respectively, and indenting
appropriately;
(iv) in the matter preceding paragraph (1) (as so
redesignated), by striking “To promote” and inserting the
following:
“(a) In General.—To promote”; and
(v) by adding at the end the following:
“(b) Authorization of Appropriations.—There is authorized
to be appropriated to carry out this section $20,000,000 for
each of fiscal years 2027 through 2031, to remain available
until expended.”.
(6) State and local capacity grants to address data center
environmental impacts.—
(A) Definitions.—In this paragraph:
(i) Cumulative impact.—The term “cumulative impact”,
with respect to pollution impact, means the impact on the
environment resulting from the incremental impact of the
action when added to other past, present, and reasonably
foreseeable future actions.
(ii) Eligible entity.—The term “eligible entity” means a
partnership between—
(I) a State, Tribal, or local government; and
(II) a community-based nonprofit organization.
(iii) Program.—The term “program” means the program
established under subparagraph (B).
(B) Establishment.—The Administrator shall establish a
program to award grants to eligible entities to carry out
activities that benefit disadvantaged communities, as
determined by the Administrator, in accordance with this
paragraph.
(C) Grants.—
(i) In general.—The Administrator shall award grants under
the program to eligible entities to carry out activities
described in clause (ii).
(ii) Eligible activities.—An eligible entity receiving a
grant under the program may use funds from that grant for—
(I) community-led evaluation, monitoring, prevention, and
remediation of air, water, and noise pollution impact,
including cumulative impacts, with an emphasis on projects
that prioritize evaluation, monitoring, prevention, and
remediation of cumulative impacts;
(II) efforts to strengthen local enforcement and technical
capacity for inspectors, engineers, and permitting and
compliance staff with relevant State, Tribal, and local
environmental agencies; and
(III) facilitating engagement of disadvantaged communities,
as determined by the Administrator, in State, Tribal, local,
and intergovernmental zoning, permitting, and regulatory
decisions, including through strategies that increase access
across languages, abilities, and media platforms.
(iii) Term.—The term of a grant under the program shall be
up to 3 years.
(D) Technical assistance.—The Administrator shall provide
technical assistance to eligible entities with respect to
grants awarded under the program.
(E) Authorization of appropriations.—
(i) In general.—There is authorized to be appropriated to
the Administrator for each
of fiscal years 2027 through 2031, to remain available until
expended—
(I) $560,000,000 to award grants under subparagraph (C);
and
(II) $40,000,000 to provide technical assistance under
subparagraph (D).
(ii) Administrative costs.—Of the amounts made available
under clause (i) in a fiscal year, the Administrator shall
reserve 7 percent to carry out this paragraph.
SA 6968. Mr. MARKEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 345, between lines 2 and 3, insert the following:
(3) Interagency consultation.—In developing the Data
Center Community Toolkit under paragraph (1), the Secretary
shall consult relevant Federal agencies in selecting and
verifying information and resources included.
(4) Public comment.—In developing the Data Center
Community Toolkit under paragraph (1), the Secretary shall
solicit comments from the public to guide the types of
resources and information that should be included.
SA 6969. Mr. MARKEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 345, strike lines 4 through 21 and insert the
following:
(1) In general.—At the request of a State, local, or
Tribal government, the Secretary shall—
(A) request the applicable computational load site
developer to provide to the Secretary information, data,
analyses, models, assumptions, estimates, projections, and
other materials relating to the proposed computational load
site;
(B) independently assess that information and those
materials, including by evaluating—
(i) the reasonableness of the assumptions and methodologies
used;
(ii) the reliability of the data;
(iii) whether estimates and projections are adequately
supported by the information provided; and
(iv) the technical reasonableness of the conclusions
reached; and
(C) after receiving and assessing relevant information, the
Secretary shall—
(i) transmit such information back to the applicable State,
local, or Tribal government; and
(ii) make publicly available any information not considered
confidential.
SA 6970. Mr. HEINRICH (for Mr. Wyden) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place, insert the following:
SEC. . PUBLICATION OF REPORTS ON INVESTIGATIONS RELATING
TO EFFECTS ON NATIONAL SECURITY OF THE IMPORT
OF CERTAIN ARTICLES.
Not later than 30 days after the date of the enactment of
this Act, the Secretary of Commerce shall—
(1) publish in the Federal Register—
(A) the report on the findings of the investigation into
the effects of imports of polysilicon and its derivatives on
the national security of the United States that the Secretary
initiated on July 1, 2025, under section 232(b) of the Trade
Expansion Act of 1962 (19 U.S.C. 1862(b)), as required under
paragraph (3)(B) of that section; and
(B) the report on the findings of the investigation into
the effects of imports of wind turbines and their parts and
components on the national security of the United States that
the Secretary initiated on August 13, 2025, under section
232(b) of the Trade Expansion Act of 1962 (19 U.S.C.
1862(b)), as required under paragraph (3)(B) of that section;
and
(2) submit to Congress any portion of either such report
that contains classified information, which may be viewed
only by Members of Congress and their staff with appropriate
security clearances.
SA 6971. Mr. HEINRICH (for Mr. Wyden (for himself, Mr. Merkley, and Ms. Cantwell)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of title II of division B, add the following:
Subtitle H—Prohibition of Construction of Data Centers on Federal Land
SEC. 2271. PROHIBITION OF CONSTRUCTION OF DATA CENTERS ON
FEDERAL LAND.
(a) Definitions.—In this section:
(1) Data center.—The term “data center” has the meaning
given the term in section 453(a) of the Energy Independence
and Security Act of 2007 (42 U.S.C. 17112(a)).
(2) Federal land.—
(A) In general.—The term “Federal land” means—
(i) National Forest System land; and
(ii) land managed by the Secretary of the Interior.
(B) Exclusions.—The term “Federal land” does not
include—
(i) any land located within the boundaries of an Indian
reservation, pueblo, or rancheria; or
(ii) any land not located within the boundaries of an
Indian reservation, pueblo, or rancheria, the title to which
is held—
(I) in trust by the United States for the benefit of an
Indian Tribe or an individual Indian;
(II) by an Indian Tribe or an individual Indian, subject to
restriction against alienation under laws of the United
States; or
(III) by a dependent Indian community.
(3) Indian tribe.—The term “Indian Tribe” has the
meaning given the term in section 4 of the Indian Self-
Determination and Education Assistance Act (25 U.S.C. 5304).
(4) National forest system.—The term “National Forest
System” has the meaning given the term in section 11(a) of
the Forest and Rangeland Renewable Resources Planning Act of
1974 (16 U.S.C. 1609(a)).
(b) Prohibition on Construction of Data Centers.—
Notwithstanding any other provision of law, the construction
of data centers on Federal land is prohibited.
(c) Reversionary Clause Required for Federal Land
Conveyances.—Any conveyance of Federal land occurring on or
after the date of enactment of this Act shall include a
reversionary clause to ensure that the conveyed Federal land
shall revert to the United States if the conveyed Federal
land is used for a data center, unless the use of the
conveyed Federal land for a data center is specifically
authorized by an Act of Congress.
SA 6972. Mr. SCOTT of Florida submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 245, strike line 2 and insert the following:
ance with this subsection.
“(5) Savings provision.—Nothing in this section
authorizes the Commission to allocate the costs from electric
transmission facilities constructed or modified under this
section to public utility retail customers without the
affirmative concurrence of that utility's State Commission as
to the need or cost-effectiveness of those transmission
facilities.”.
On page 268, between lines 18 and 19, insert the following:
“(5) Savings provision.—Nothing in this section
authorizes the Commission to allocate the costs from electric
transmission facilities constructed or modified under this
section to public utility retail customers without the
affirmative concurrence of that utility's State Commission as
to the need or cost-effectiveness of those transmission
facilities.
SA 6973. Mr. SCOTT of Florida (for himself and Mrs. Moody) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
In section 1204, add at the end the following:
(c) Compliance With Biological Opinion and Reinstatement of
Approval of Florida State Dredged and Fill Permitting
Program.—
(1) Definitions.—In this subsection:
(A) Agency action.—
(i) In general.—The term “Agency Action” means the
approval by the Administrator of the Environmental Protection
Agency of the request of the State of Florida for the
assumption by the State of Florida of the administration and
permitting of a State permit program under section 404 of the
Federal Water Pollution Control Act (33 U.S.C. 1344), as
described in the notice of the Environmental Protection
Agency entitled “EPA's Approval of Florida's Clean Water Act
Section 404 Assumption Request” (85 Fed. Reg. 83553
(December 22, 2020)).
(ii) Inclusion.—The term “Agency Action” includes other
activities.
(B) Biological opinion.—
(i) In general.—The term “Biological Opinion” means the
programmatic biological opinion issued by the United States
Fish and Wildlife Service entitled “Programmatic Biological
Opinion for Environmental Protection Agency's Approval of
FDEP's Assumption of the Administration of the Dredge and
Fill Permitting Program under Section 404 of the Clean Water
Act” (FWS Log Nos. 04E00000-2021-F-0001 and 04E00000-2021-B-
0001) and dated November 17, 2020.
(ii) Inclusion.—The term “Biological Opinion” includes
the incidental take statement described on pages 69 through
73 of the programmatic biological opinion described in clause
(i).
(C) Other activities.—The term “other activities” has
the meaning given the term in the glossary of the Biological
Opinion.
(2) Compliance with biological opinion.—For purposes of
the Agency Action—
(A) the Biological Opinion is deemed to be compliant with,
and compliance with the Biological Opinion is deemed to be
compliance with, the requirements of the Endangered Species
Act of 1973 (16 U.S.C. 1531 et seq.); and
(B) no additional consultation with the United States Fish
and Wildlife Service or the National Marine Fisheries Service
under section 7(a) of that Act (16 U.S.C. 1536(a)) is
required.
(3) Reinstatement of agency action.—Notwithstanding any
other provision of law or any court order vacating or setting
aside the Agency Action, the Agency Action is reinstated and
shall have full force and effect beginning on the date of
enactment of this Act.
SA 6974. Mr. HEINRICH (for Mr. Kelly (for himself, Mr. Schiff, Mr. Padilla, and Mr. Gallego)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 181 of the amendment, strike lines 5 through 7 and
insert the following:
(c) Savings Clause.—Nothing in this section—
(1) limits or modifies any authority under any applicable
law, compact, or treaty; or
(2) creates any right or entitlement to the delivery,
release, or availability of a specific quantity of water.
SA 6975. Mr. HEINRICH (for Mr. Welch) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 480, strike line 18 and all that follows
through page 482, line 16, and insert the following:
“(C) Preliminary injunctions.—
“(i) In general.—Subject to clause (ii), a court may
issue a preliminary injunction for the applicable agency
action when—
“(I) there is a substantial likelihood the agency action
violates a Federal law (other than this division or the
National Environmental Policy Act of 1969 (42 U.S.C. 4321 et
seq.));
“(II) necessary to prevent irreparable harm to the
plaintiff;
“(III) the balance of equities favors the plaintiff; and
“(IV) a preliminary injunction is in the public interest.
“(ii) Requirements.—The effective period of a preliminary
injunction issued by a court under clause (i) shall be not
longer than the time the court finds is reasonably
necessary—
“(I) for the correction of the violation described in
clause (i)(I); and
“(II) to prevent the irreparable harm described in clause
(i)(II).
SA 6976. Mr. HEINRICH (for Mr. Welch) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 111, strike line 9 and all that follows
through page 112, line 19, and insert the following:
“(A) In general.—The scope of a certification provided
under this section shall be limited to ensuring, by a
preponderance of the evidence, compliance with water quality
requirements for any activity that may result in a discharge.
“(B) Prohibition.—Notwithstanding subparagraph (A), in
reviewing a certification application for a project described
in subsection (g)(2), no certifying authority may—
“(i) deny certification for any reason other than making a
determination by clear and convincing evidence that—
“(I) no modification to or reasonable condition on the
certification would make it possible to grant the
certification without violating water quality requirements;
or
“(II) after the certifying authority has sent the
communication described in clause (v)(II) of paragraph (3)(C)
and given the applicant a reasonable opportunity to provide
the additional materials or information described in that
communication, the application continues to lack the
information required under clause (ii) and, if applicable,
clause (iii) of that paragraph; or
“(ii) grant certification with conditions, except for
conditions that the certifying authority determines by clear
and convincing evidence are necessary to ensure compliance
with water quality requirements.
SA 6977. Mr. HEINRICH (for Mr. Welch) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 125, strike line 2 and all that follows
through page 130, line 15, and insert the following:
“(1) Burdens of proof.—
“(A) In general.—When reviewing a denial of a
certification under this section, a court shall place the
burden of proof, as described in subparagraph (B), on the
certifying authority to demonstrate that no reasonable
modifications to or reasonable conditions on the
certification would make it possible to grant the
certification without violating water quality requirements.
“(B) Burdens of proof described.—The burden of proof
referred to in subparagraph (A) is—
“(i) in the case of a certification for a project
described in subsection (g)(2), a preponderance of the
evidence; and
“(ii) in the case of any other certification under this
section, clear and convincing evidence.
“(2) Conditions.—When reviewing a challenge to 1 or more
conditions required by a certifying authority under this
section for a project described in subsection (g)(2), a court
shall place the burden of proof on the certifying authority
to demonstrate, by clear and convincing evidence, that the 1
or more challenged conditions are—
“(A) necessary to allow the certification to be made
without violating water quality requirements; and
“(B) the least burdensome condition or set of conditions
for avoiding violation of water quality requirements.
“(g) Special Rule for Certain Certifications.—
“(1) Definition of interstate transmission line project.—
In this subsection, the term `interstate transmission line
project' means a project for the construction, modification,
or upgrade of a transmission facility that is part of the
bulk-power system (as defined in section 215(a) of the
Federal Power Act (16 U.S.C. 824o(a))).
“(2) Limitation on certification requirements for certain
interstate linear infrastructure.—Notwithstanding the first
sentence of subsection (a)(1), any applicant for a
certificate of public convenience and necessity for a project
under section 7 of the Natural Gas Act (15 U.S.C. 717f) or a
Federal authorization or permit required to construct,
modify, or operate an interstate transmission line project
that may result in a discharge into the waters of the United
States shall provide to the Federal licensing or permitting
agency a certification from a certifying authority that such
discharge complies with water quality requirements or a
waiver pursuant to this section.
“(3) Certification of no limitation and standard.—In the
case of any discharge described in this subsection for which
there is not an applicable effluent limitation or other
limitation under sections 301(b) and 302 and for which there
is not an applicable standard under sections 306 and 307, the
certifying authority shall so certify, except that such a
certification shall not satisfy section 511(c).
“(4) Review for compliance.—Notwithstanding subsection
(a)(4)—
“(A) prior to the initial operation of any federally
licensed or permitted facility or activity that may result in
a discharge into the waters of the United States and with
respect to which a certification has been obtained pursuant
to this subsection, which facility or activity is not subject
to a Federal operating license or permit, the licensee or
permittee shall provide an opportunity for the certifying
authority to review the manner in which the facility or
activity shall be operated or conducted for the purposes of
assuring that applicable effluent limitations or other
limitations or other applicable water quality requirements
will not be violated;
“(B) on notification by the certifying authority that the
operation of any federally licensed or permitted facility or
activity described in subparagraph (A) will violate
applicable effluent limitations or other limitations or other
water quality requirements, the applicable Federal agency
may, after public hearing, suspend the Federal license or
permit; and
“(C) if a Federal license or permit is suspended pursuant
to subparagraph (B), the Federal license or permit shall
remain suspended until notification is received from the
certifying authority that there is reasonable assurance that
the facility or activity will not violate the applicable
provisions of sections 301, 302, 303, 306, and 307.
“(5) Limitation and monitoring requirements of certain
linear infrastructure certifications.—Notwithstanding
subsection (d)—
“(A) any certification provided under this subsection
shall set forth any effluent limitations and other
limitations and monitoring requirements necessary to assure
that any discharge subject to this subsection will comply
with the applicable provisions of sections 301, 302, 303,
306, and 307; and
“(B) any limitations and requirements set forth pursuant
to subparagraph (A) shall be imposed by the licensing or
permitting agency as a condition on any Federal license or
permit subject to the provisions of this section.
“(6) Reasonable period of time.—Notwithstanding the
periods of time in subsections (a)(1) and (e)(4), a licensing
or permitting agency shall, categorically or on a case-by-
case basis for each certification application, establish a
reasonable period of time (not to exceed 9 months from the
date of receipt of the certification application) within
which a certifying authority shall issue a final action on
the certification application under this subsection, which
shall account for the time required under applicable State or
Tribal law for public notice and comment periods.
“(h) Definitions.—In this section:
“(1) Certification application.—The term `certification
application' means a request from an applicant for a
certification described in subsection (a).
“(2) Certifying authority.—The term `certifying
authority', with respect to a certification application,
means, as applicable—
“(A) the State or interstate agency to which the
certification application was submitted, including an Indian
Tribe that is treated as a State for purposes of this section
pursuant to section 131.8 of title 40, Code of Federal
Regulations; or
“(B) if no State or interstate agency has the authority to
provide the certification described in subsection (a), the
Administrator.
“(3) Water quality requirements.—
“(A) In general.—The term `water quality requirements'
means—
“(i) the applicable provisions of sections 301, 302, 303,
306, and 307;
“(ii) any Federal and State or Tribal laws (including
regulations) implementing sections 301, 302, 303, 306, and
307 that are applicable to discharges into waters of the
United States; and
“(iii) any other requirements under Federal and State or
Tribal laws (including regulations) that are applicable to
discharges into waters of the United States.
“(B) Exclusion.—The term `water quality requirements'
does not include any Federal and State or Tribal regulations
that solely relate to visual aesthetics that are applicable
to discharges into waters of the United States.”.
SA 6978. Mr. HEINRICH (for Mr. Welch) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 194 of the amendment, strike line 19 and
all that follows through page 195, line 17, and insert the
following:
(ii) reasonable attorney fees and costs of litigation, as
the court determines appropriate; and
(iii) economic damages, including any costs associated with
the applicable denial or delay, as the court determines
appropriate.
SA 6979. Mr. HEINRICH (for Mr. Welch) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 176 of the amendment, strike line 1 and
all that follows through page 178, line 2, and insert the
following:
(III) reasonable attorney fees and costs of litigation, as
the court determines appropriate; and
(IV) any costs associated with the applicable delay in the
construction or operation of the covered project or action,
as the court determines appropriate.
(ii) Savings clause.—Nothing in this subparagraph limits
or supersedes any existing equitable authority of a court to
grant any available form of temporary or injunctive relief
against the Federal department or agency.
(iii) Motion for temporary or preliminary relief.—
Notwithstanding any other provision of this section, on a
motion for temporary or preliminary relief, the reviewing
court shall not consider available cost recovery under
subclause (III) or (IV) of clause (i) in considering whether
harm to the holder of a Federal authorization or permit is
irreparable.
SA 6980. Mr. HEINRICH (for Mr. Welch) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 142 of the amendment, strike line 9 and
all that follows through page 149, line 24, and insert the
following:
(1) in subparagraph (B), in the undesignated matter
following clause (ii)—
(A) by striking “the preceding sentence” and inserting
“subparagraph (B)”; and
(B) by striking “The Secretary” and inserting the
following:
“(C) The Secretary”; and
(2) by inserting after subparagraph (C) (as so designated)
the following:
“(D) If the consultation period proposed to be agreed to
between the Secretary and the Federal agency under
subparagraph (B) extends beyond 180 days and the Secretary
and the Federal agency have not provided a written statement
to, or obtained consent from, a permit or license applicant
under clause (i) or (ii), as applicable, of that subparagraph
during such period, the applicant shall be eligible for
relief under section 706(1) of title 5, United States Code.
“(E)(i) In the case of an agency action that requires the
preparation of an environmental document (as defined in
section 3 of the National Environmental Policy Act of 1969),
the consultation process under subsection (a)(2) shall be
completed by not later than the date on which the applicable
environmental document (as so defined) for the agency action
is completed in accordance with section 107(g) of the
National Environmental Policy Act of 1969 (42 U.S.C.
4336a(g)), unless the Secretary approves an extension of the
deadline due to extraordinary circumstances beyond the
control, and not due to any action, of the consulting
parties.
“(ii) The requirement under clause (i) shall not be
construed to extend the deadlines described in subparagraphs
(A) through (D).”.
SEC. 1303. PROJECTS IN THE OPERATIONAL RIGHT-OF-WAY.
Section 7 of the Endangered Species Act of 1973 (16 U.S.C.
1536) is amended by adding at the end the following:
“(q) Projects in the Operational Right-of-way.—
Notwithstanding subsections (g) and (h), any project that is
categorically excluded from the requirements of the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.)
pursuant to section 1316 of the Moving Ahead for Progress in
the 21st Century Act (23 U.S.C. 109 note; Public Law 112-141)
shall be exempt from paragraphs (2), (3), and (4) of
subsection (a).”.
SEC. 1304. STATE ASSUMPTION OF CONSULTATION RESPONSIBILITIES.
The Endangered Species Act of 1973 is amended by inserting
after section 7 (16 U.S.C. 1536) the following:
“SEC. 7A. STATE ASSUMPTION OF CONSULTATION RESPONSIBILITIES.
“(a) Definitions.—In this section:
“(1) Program.—The term `program' means the program
carried out by the Secretary pursuant to this section.
“(2) Secretary.—The term `Secretary' means the Secretary
of the Interior.
“(3) State agency.—The term `State agency' means any
agency, department, board, commission, or other governmental
entity in a State with primary jurisdiction over
environmental or wildlife management matters in the State, as
determined by the Governor of the State.
“(b) Program.—
“(1) In general.—Except as provided in this subsection,
the Secretary shall carry
out a program under which the Secretary may assign the
consultation responsibilities of the Secretary described in
paragraph (4)(A) to States.
“(2) Limitations on assumptions.—
“(A) In general.—Except as provided in subparagraph (B),
the Secretary may not assign the consultation
responsibilities of the Secretary described in paragraph
(4)(A) to any State for a project or agency action (as
referred to in section 7) that exceeds the boundaries of the
State.
“(B) Limitation.—For any project or agency action (as
referred to in section 7) that is solely within the
boundaries of 1 State, but that is within an area affected
that exceeds the boundaries of the State, a State that
assumes responsibility under paragraph (4) for the project or
agency action (as referred to in section 7) shall consult
with—
“(i) if any other State has assumed responsibility under
that paragraph, the jurisdiction of which is within that area
affected, such State; or
“(ii) if there is no State described in clause (i), the
Secretary.
“(3) Implementing regulation.—
“(A) In general.—Not later than 270 days after the date
of enactment of the Bipartisan American Affordability and
Jobs Act of 2026, the Secretary shall issue a proposed rule
to establish a program that would comply with the
requirements of this section and ensure that approved State
assumption programs adequately carry out the consultation
requirements under section 7 (referred to in this section as
the `implementing regulation').
“(B) Public comment.—The proposed rule issued under
subparagraph (A) shall be made available for public comment
for a period of not less than 60 days, during which the
Secretary shall solicit comment from States on the proposed
rule.
“(C) Limitation.—The rule issued under subparagraph (A)
shall not include any requirement that is not necessary to
carry out this section.
“(4) Assumption of responsibility.—
“(A) In general.—Subject to the requirements of this
section and the implementing regulation, with the written
agreement of the Secretary and a State, which may be in the
form of a memorandum of understanding, the Secretary may
assign, and the State may assume, the consultation
responsibilities of the Secretary within the boundary of the
State under subsections (a), (b), and (c) of section 7.
“(B) Certain projects and agency actions.—A State may not
assume responsibility under the program until the date on
which—
“(i) the implementing regulation takes effect; and
“(ii) the State certifies to the Secretary that the State
has secured the financial, legal, personnel, and other
resources described in subsection (c)(2)(B).
“(C) Federal responsibility.—Any responsibility of the
Secretary not explicitly assumed by the State by written
agreement under the program shall remain the responsibility
of the Secretary.
“(c) State Participation.—
“(1) Requirements for participating states.—Each State is
eligible to participate in the program if the State meets
each requirement described in this section and the
implementing regulation.
“(2) Application.—
“(A) In general.—A State seeking to participate in the
program shall submit to the Secretary an application at such
time, in such manner, and containing such information as the
Secretary may require, in accordance with subparagraph (B).
“(B) Requirements.—As part of the implementing
regulation, the Secretary shall establish requirements
relating to applications submitted by States under
subparagraph (A), including, at a minimum, requirements that
a State provide—
“(i) verification of the financial and legal resources
necessary to carry out the authority that may be granted to
the State under the program;
“(ii) verification of the personnel resources or a plan to
hire the personnel, not later than 1 year after the date on
which the application is approved, necessary to carry out the
authority that may be granted to the State under the program;
and
“(iii) evidence of the notice and solicitation of public
comment by the State relating to participation of the State
in the program, including—
SA 6981. Mr. HEINRICH (for Mr. Welch) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 74 of the amendment, strike line 20 and
all that follows through page 78, line 4, and insert the
following:
“(5) Preliminary injunctions.—
“(A) In general.—Subject to subparagraph (B), a court may
issue a preliminary injunction for an authorization that does
not comply with the requirements of this Act when—
“(i) there is a substantial likelihood the authorization
violates a Federal law other than—
“(I) this Act; or
“(II) division A of subtitle III of title 54, United
States Code;
“(ii) necessary to prevent irreparable harm to the
plaintiff;
“(iii) the balance of equities favors the plaintiff; and
“(iv) a preliminary injunction is in the public interest.
“(B) Requirements.—A preliminary injunction issued by a
court under subparagraph (A) shall last no longer than the
time the court finds is reasonably necessary—
“(i) for the correction of the violation described in
subparagraph (A)(i); and
“(ii) to prevent the irreparable harm described in
subparagraph (A)(ii).
“(6) Treatment of supplemental or revised environmental
documents.—
“(A) In general.—For purposes of a claim—
“(i) a supplemental or revised environmental document for
an authorization, when required by court order, shall be
considered to be a separate environmental document; and
“(ii) the deadline for filing a claim for judicial review
of an authorization described in clause (i) shall be the date
that is 150 days after the date on which the authorization
for which the supplemental environmental document is prepared
is made public by the agency, unless a shorter time is
specified in the Federal law pursuant to which judicial
review is authorized.
“(B) Limitation.—A claim for review of an authorization
described in subparagraph (A)(i) shall be limited to
information contained in the final supplemental environmental
documents that was not contained in a previous environmental
document for the authorization.
“(7) Actions for use of tribal trust resources.—
SA 6982. Mr. HEINRICH (for Mr. Welch) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 140, strike lines 4 through 17 and insert the
following:
ized under the permit would present a danger to human health
or the environment; and
“(C) with respect to a determination regarding a
verification that an activity involving a discharge of
dredged or fill material is authorized by a general permit
issued under this section, the court may not enjoin or
otherwise limit the discharge unless the court finds that the
activity would present a danger to human health or the
environment.
SA 6983. Mr. HEINRICH (for Mr. Welch) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 135, strike line 19 and all that follows
through page 136, line 2, and insert the following:
“(B) Requirement.—Clauses (i) through (iv) of
subparagraph (A) shall only apply to a general permit being
reissued pursuant to that subparagraph if—
“(i) the general permit does not—
“(I) narrow or eliminate preconstruction requirements; or
“(II) raise the threshold for such preconstruction
requirements; or
“(ii) the Secretary has carried out an independent and
publicly available review of the general permit and
determined that the impacts to human health and the
environment are minimal.”.
SA 6984. Mr. MORAN (for himself, Mr. Grassley, and Mr. Schmitt) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 242, strike line 2 and insert the following: the
siting of the applicable facility.
“(6) Land restoration plans.—
“(A) In general.—To preserve, mitigate, and restore
affected property, including farmland, ranchland, and Tribal
land, under this section, the Commission shall require an
applicant for a permit under subsection (b)—
“(i) to file a land restoration plan with the Commission
and provide a copy to each affected landowner;
“(ii) to conduct onsite inspections to determine
compliance with the land restoration plan; and
“(iii) to comply with all requirements of the land
restoration plan as approved by the Commission.
“(B) Corrective action.—If the holder of a permit issued
under subsection (b) fails to comply with the requirements of
this paragraph, the Commission shall issue an order requiring
corrective action, the costs of which shall be borne by the
permit holder.
“(C) Savings provision.—Nothing in this paragraph
precludes measures or requirements for the protection,
mitigation, or restoration of affected property that differ
from those prescribed in this paragraph.”.
SA 6985. Mr. HUSTED (for Mr. Curtis (for himself and Mr. Hickenlooper)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 371 of the amendment, line 19, strike “comprising
less than 10 acres”.
SA 6986. Ms. CANTWELL (for herself, Mr. Wyden, and Mrs. Murray) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place in title II of division A, insert
the following:
SEC. 12__. RULE OF CONSTRUCTION FOR INDIAN TRIBES.
Notwithstanding any other provision of law, nothing in this
title or an amendment made by this title affects the
authority of a Tribal government to impose and implement
approved water quality standards with respect to waters on a
reservation under the jurisdiction of that Tribal government.
SA 6987. Ms. CANTWELL (for herself, Mr. Wyden, and Mrs. Murray) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place in title II of division A, insert
the following:
SEC. 12__. RULE OF CONSTRUCTION FOR INDIAN TRIBES.
Notwithstanding any other provision of law, nothing in this
title or an amendment made by this title affects the
authority of a Tribal government to impose and implement
approved water quality standards with respect to waters on a
reservation under the jurisdiction of that Tribal government.
SA 6988. Ms. CANTWELL (for herself, Mr. Wyden, Mr. Merkley, and Mrs. Murray) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 422, line 20, strike “are reasonably related to
the effects of” and insert “reasonably related to”.
SA 6989. Mr. MERKLEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 110, strike line 8 and all that follows
through page 111, line 7, and insert the following:
“(1) Effect of certain certification actions.—
“(A) Certification.—If a certifying authority grants a
certification application, the agency with jurisdiction over
the Federal license or permit for which the certification
application was made shall consider water quality
requirements satisfied for the purpose of considering the
application for the Federal license or permit.
“(B) Certification with conditions.—
“(i) In general.—If a certifying authority grants a
certification application with conditions, the agency with
jurisdiction over the Federal license or permit for which the
certification application was made shall consider water
quality requirements satisfied for the purpose of considering
the application for the Federal license or permit, subject to
the conditions included in the certification.
“(ii) Savings clause.—Nothing in this subparagraph
affects paragraph (2)(B).
“(C) Waiver of certification.—If a certifying authority
waives the certification requirement for a certification
application, the Federal licensing or permitting agency for
which the certification application was made shall review the
certification application for compliance with water quality
requirements.
SA 6990. Mr. BOOKER (for Mr. Durbin) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 74 of the amendment, strike line 20 and
all that follows through page 77, line 2.
On page 77, line 3 of the amendment, strike “(7)” and
insert “(5)”.
On page 78, line 3 of the amendment, strike “(8)” and
insert “(6)”.
SA 6991. Mr. GALLEGO (for himself and Mr. Kelly) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Strike section 2215.
SA 6992. Ms. CANTWELL (for herself and Ms. Murkowski) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of section 1204, add the following:
(c) EPA Final Determinations.—Notwithstanding any other
provision of law, each determination of the Administrator of
the Environmental Protection Agency under section 404(c) of
the Federal Water Pollution Control Act (33 U.S.C. 1344(c))
made during the period that begins on January 1, 2023, and
ends on the date of enactment of this Act shall have the
force and effect of law.
SA 6993. Ms. CANTWELL (for herself, Mr. Wyden, Mr. Merkley, and Mrs. Murray) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 422, line 20, strike “are reasonably related to
the effects of” and insert “reasonably related to”.
SA 6994. Ms. CANTWELL (for herself, Mr. Wyden, and Mrs. Murray) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 145 of the amendment, strike line 21 and
all that follows through page 146, line 16, and insert the
following:
“(2) Limitations on assumptions.—The Secretary may not
assign the consultation responsibilities of the Secretary
described in paragraph (4)(A) to any State for a project or
agency action (as referred to in section 7) that—
“(A) exceeds the boundaries of the State;
“(B) may affect a species—
“(i) the range of which extends beyond the boundaries of
the State, including a species that occurs in, or migrates
through, Federal waters; or
“(ii) for which the Secretary shares responsibility under
this Act with another head of another Federal agency; or
“(C) affects in any way Indian country (as defined in
section 1151 of title 18, United States Code) or the treaty
or Trust-protected resources of an Indian Tribe (as defined
in section 4 of the Indian Self-Determination and Education
Assistance Act (25 U.S.C. 5304)).
SA 6995. Ms. CANTWELL (for herself and Mr. Wyden) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
In section 1401, add at the end the following:
(d) Exclusion of Certain Federal Land in Alaska.—
(1) Definitions.—In this subsection:
(A) Arctic national wildlife refuge.—
(i) In general.—The term “Arctic National Wildlife
Refuge” means the Arctic National Wildlife Refuge designated
under section 303(2) of the Alaska National Interest Lands
Conservation Act (Public Law 96-487; 94 Stat. 2390).
(ii) Inclusion.—The term “Arctic National Wildlife
Refuge” includes the Coastal Plain (as defined in section
20001(a) of Public Law 115-97 (16 U.S.C. 3143 note)).
(B) Covered activity.—The term “covered activity” means
any project, action, or activity, including any lease sale,
lease, exploration, seismic survey, road, pipeline, or right-
of-way, that is located wholly or partially on Federal land
within—
(i) the Arctic National Wildlife Refuge; or
(ii) the National Petroleum Reserve in Alaska.
(C) National petroleum reserve in alaska.—The term
“National Petroleum Reserve in Alaska” means the National
Petroleum Reserve in Alaska designated under section 102 of
the Naval Petroleum Reserves Production Act of 1976 (42
U.S.C. 6502).
(2) Exclusion.—Subsection (b) shall not apply to—
(A) any Federal authorization or permit, lease, or other
Federal approval for a covered activity; or
(B) any action by a Federal department or agency with
respect to a covered activity.
(3) Savings clause.—Nothing in this subsection shall limit
the authority of any Federal department or agency under any
other provision of law with respect to a covered activity.
SA 6996. Ms. DUCKWORTH (for herself and Mr. Grassley) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Starting on page 238 of the amendment, line 7, strike all
that follows through page 269, line 9, and insert the
following:
(1) in the matter preceding paragraph (1), by striking
“Except” and all that follows through “finds that” and
inserting “Except as provided in subsections (d)(1) and (i),
the Commission shall, after notice and an opportunity for
hearing, including a public comment period of at least 90
days, issue one or more permits to individual or joint
applicants for the construction or modification of electric
transmission facilities necessary in the national interest if
the Commission finds that”;
(2) in paragraph (1)—
(A) in subparagraph (A)(i), by inserting “or
modification” after “siting”; and
(B) in subparagraph (C)—
(i) in the matter preceding clause (i), by inserting “or
modification” after “siting”; and
(ii) in clause (i), by striking “the later of” in the
matter preceding subclause (I) and all that follows through
the semicolon at the end of subclause (II) and inserting
“the date on which the application was filed with the State
commission or other entity;”; and
(3) by striking paragraphs (2) through (6) and inserting
the following:
“(2) the proposed facilities will be used for the
transmission of electric energy in interstate or foreign
commerce;
“(3) the proposed construction or modification is
consistent with the public interest;
“(4) the proposed construction or modification will
protect or benefit consumers, provide improved reliability,
and facilitate just and reasonable rates;
“(5) the electric transmission facilities—
“(A) are—
“(i) capable of transmitting electric energy at a voltage
of not less than 230 kilovolts; or
“(ii) necessary to safely and reliably interconnect 1 or
more facilities described in clause (i) for which the permit
is provided; or
“(B) in the case of facilities that include advanced
transmission conductors (including superconductors), as
defined by the Commission, are capable of transmitting
electric energy at voltages determined to be appropriate by
the Commission for facilities of a comparable throughput
specifically with respect to an application for an individual
project under this section;
“(6) if applicable, the proposed modification (including
reconductoring) will maximize, to the extent reasonable and
economical, the transmission capabilities of existing towers,
structures, or rights-of-way; and
“(7) if applicable, and to the maximum extent practicable
and reasonable, the proposed construction will be sited—
“(A) near and parallel to roads, the rights-of-way of
railways, or along division lines of lands, according to a
government survey;
“(B) so as not to interfere with the use by the public of
highways or streams; and
“(C) so as not to unnecessarily interfere with the use of
any land by the affected landowner.”.
(c) State Siting and Consultation.—Section 216 of the
Federal Power Act (16 U.S.C. 824p) is amended by striking
subsection (d) and inserting the following:
“(d) State Siting and Consultation.—
“(1) Preservation of state siting authority.—The
Commission shall have no authority to issue a permit under
subsection (b) for the construction or modification of an
electric transmission facility within a State except as
provided in paragraph (1) of that subsection.
“(2) Consultation.—In any proceeding before the
Commission under subsection (b), the Commission shall afford
each State in which a transmission facility covered by the
permit is or will be located, each affected Federal agency
and Indian Tribe, private property owners, and other
interested persons, a reasonable opportunity to present their
views and recommendations with respect to the need for and
impact of a facility covered by the permit.
“(3) Landowner input.—In authorizing the construction or
modification of an electric transmission facility under
subsection (b), the Commission shall take into account
landowner input.
“(4) State record.—In any proceeding before the
Commission under subsection (b), each State in which a
transmission facility covered by the permit is or will be
located may file with the Commission, and the Commission
shall consider, any part of the State record, if applicable,
that the State finds to be relevant to the determination of
the Commission.
“(5) Pre-filing processes.—Any Commission-related pre-
filing processes relating to an application submitted under
subsection (c) may commence before, but shall commence no
later than, an application is submitted to the applicable
State commission or other entity that has authority to
approve the siting of the applicable facility.”.
(d) Rights-of-Way.—Section 216(e) of the Federal Power Act
(16 U.S.C. 824p(e)) is amended by striking “or a State” in
paragraph (1) and by striking “shall conform as nearly as
practicable to the practice and procedure in a similar action
or proceeding in the courts of the State in which the
property is located” in paragraph (3) and inserting “shall
be in accordance with rule 71.1 of the Federal Rules of Civil
Procedure.”.
(e) Cost Allocation.—
(1) In general.—Section 216 of the Federal Power Act (16
U.S.C. 824p) is amended by striking subsection (f) and
inserting the following:
“(f) Cost Allocation.—
“(1) Transmission tariffs.—For the purposes of this
section and except as provided in paragraph (2), any
transmitting utility that owns, controls, or operates, or
proposes to construct, electric transmission facilities with
respect to which the Commission finds that the criteria set
forth in paragraphs (2) through (5) and, if applicable, (6)
of subsection (b) are satisfied, and any entity that will
become a transmitting utility on completion of 1 or more
proposed electric transmission facilities with respect to
which the Commission finds that those criteria are satisfied,
shall file a tariff or tariff revision with the Commission
pursuant to section 205 and the regulations of the Commission
allocating the costs of those new or modified electric
transmission facilities. The issuance of a permit under
subsection (b) shall not be required to make, or otherwise
act as a prerequisite to making, that filing pursuant to
section 205, provided that the Commission finds that the
criteria set forth in paragraphs (2) through (5) and, as
applicable, (6) or (7) of subsection (b) are satisfied with
respect to the applicable facilities.
“(2) Exception.—In the case of an exempt transmitting
utility (as defined in section 225(a)) that owns, controls,
or operates electric transmission facilities described in
paragraph (1), the Commission, notwithstanding section
211A(c), shall require the exempt transmitting utility to
provide transmission
services over such facilities pursuant to section 211A and
the regulations of the Commission allocating the costs of the
new or modified transmission facilities.
“(3) Transmission benefits.—The Commission shall require
that tariffs or tariff revisions filed under this section are
just and reasonable and allocate the costs of providing
service to customers that benefit, in accordance with the
cost-causation principle and at least roughly commensurate
with the benefits, including through—
“(A) improved reliability;
“(B) reduced congestion;
“(C) reduced power losses;
“(D) greater carrying capacity that delivers improved
reliability or reductions in the cost of delivered power;
“(E) reduced operating reserve requirements; and
“(F) improved access to generation that achieves
reductions in the cost of delivered power.
“(4) Ratepayer protection.—Customers that receive no
benefit, or benefits that are trivial in relation to the
costs sought to be allocated, from existing or proposed
electric transmission facilities the costs of which are
allocated pursuant to paragraph (1) shall not be
involuntarily allocated any of the costs of those
transmission facilities, provided, however, that nothing in
this section shall prevent a transmitting utility from
recovering all or part of such costs through voluntary
agreement with its customers and allocating any remaining
costs in accordance with this subsection.”.
(2) Savings provision.—If the Federal Energy Regulatory
Commission finds that the considerations under paragraphs (2)
through (5) and, as applicable, (6) or (7) of subsection (b)
of section 216 of the Federal Power Act (16 U.S.C. 824p) (as
amended by subsection (b)) are satisfied, nothing in this
section or the amendments made by this section shall be
construed to exclude transmission facilities located on the
outer Continental Shelf from being eligible for cost
allocation established under subsection (f)(1) of that
section (as amended by paragraph (1)).
(f) Coordination of Federal Authorizations for Transmission
Facilities.—Section 216(h) of the Federal Power Act (16
U.S.C. 824p(h)) is amended—
(1) in paragraph (1), by adding at the end the following:
“(C) The term `Federal authorization' includes a
certification under section 401 of the Federal Water
Pollution Control Act (33 U.S.C. 1341) from a certifying
authority (as defined in subsection (h) of that section) and
any other permit, license, concurrence, or approval of a
State administrative agency required under Federal law, other
than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451
et seq.), in order to site a transmission facility.”;
(2) in paragraph (2), by striking the period at the end and
inserting the following: “, except that—
“(A) the Commission shall act as the lead agency in the
case of facilities permitted under subsection (b) or section
225; and
“(B) the Department of the Interior shall act as the lead
agency in the case of facilities located on a lease,
easement, or right-of-way granted by the Secretary of the
Interior under section 8(p)(1)(C) of the Outer Continental
Shelf Lands Act (43 U.S.C. 1337(p)(1)(C)).”;
(3) in each of paragraphs (3), (4)(B), (4)(C), (5)(B),
(6)(A), (7)(A), (7)(B)(i), (8)(A)(i), and (9), by striking
“Secretary” each place it appears and inserting “lead
agency”;
(4) in paragraph (4)(A), by striking “As head of the lead
agency, the Secretary” and inserting “The lead agency”;
(5) in paragraph (5)(A), by striking “As lead agency head,
the Secretary” and inserting “The lead agency”;
(6) in paragraph (7)—
(A) in subparagraph (A), by striking “18 months after the
date of enactment of this section” and inserting “18 months
after the date of enactment of the Bipartisan American
Affordability and Jobs Act of 2026”; and
(B) in subparagraph (B)(i), by striking “1 year after the
date of enactment of this section” and inserting “18 months
after the date of enactment of the Bipartisan American
Affordability and Jobs Act of 2026”; and
(7) by adding at the end the following:
“(10) Any order or action of a Federal agency or State
administrative agency acting pursuant to Federal law to
issue, condition, or deny a Federal authorization shall be
subject to judicial review in the same courts in which an
order of the Commission is subject to judicial review under
section 313, and a court shall have jurisdiction over the
action in accordance with the third sentence of subsection
(b) of that section, the courts described in that section
having original and exclusive jurisdiction over such
actions.”.
(g) Interstate Compacts.—Section 216(i) of the Federal
Power Act (16 U.S.C. 824p(i)) is amended—
(1) in paragraph (3), by striking “, including facilities
in national interest electric transmission corridors”; and
(2) in paragraph (4)—
(A) in subparagraph (A), by striking “; and” and
inserting a period;
(B) by striking subparagraph (B); and
(C) by striking “in disagreement” in the matter preceding
subparagraph (A) and all that follows through “(A) the” in
subparagraph (A) and inserting “unable to reach an agreement
on an application seeking approval by the”.
(h) Transmission Infrastructure Investment.—Section
219(b)(4) of the Federal Power Act (16 U.S.C. 824s(b)(4)) is
amended—
(1) in subparagraph (A), by striking “and” after the
semicolon at the end;
(2) in subparagraph (B), by striking the period at the end
and inserting “; and”; and
(3) by adding at the end the following:
“(C) all prudently incurred costs associated with payments
to jurisdictions impacted by electric transmission facilities
developed pursuant to section 216 or 225.”.
(i) Jurisdiction.—Section 216 of the Federal Power Act (16
U.S.C. 824p) is amended by striking subsection (k) and
inserting the following:
“(k) Jurisdiction.—
“(1) ERCOT.—This section shall not apply within the area
referred to in section 212(k)(2)(A).
“(2) Other utilities.—
“(A) In general.—For the purposes of this section, the
Commission shall have jurisdiction over all transmitting
utilities, including transmitting utilities described in
section 201(f), but excluding any ERCOT utility (as defined
in section 212(k)(2)(B)) and any exempt transmitting utility
(as defined in section 225(a)) that does not voluntarily
subject itself to Commission jurisdiction for the purposes of
this section.
“(B) Clarification.—Being subject to Commission
jurisdiction for the purposes of this section shall not make
an entity described in section 201(f) a public utility for
the purposes of section 201(e).”.
(j) Conforming Amendments.—
(1) Section 50151(b) of Public Law 117-169 (42 U.S.C.
18715(b)) is amended by striking “facilities designated by
the Secretary to be necessary in the national interest under
section 216(a) of the Federal Power Act (16 U.S.C. 824p(a))”
and inserting “facilities in a geographic area identified
under section 224 of the Federal Power Act”.
(2) Section 1222 of the Energy Policy Act of 2005 (42
U.S.C. 16421) is amended—
(A) in subsection (a)(1)(A), by striking “in a national
interest electric transmission corridor designated under
section 216(a)” and inserting “in a geographic area
identified under section 224”; and
(B) in subsection (b)(1)(A), by striking “in an area
designated under section 216(a)” and inserting “in a
geographic area identified under section 224”.
(3) Section 40106(h)(1)(A) of the Infrastructure Investment
and Jobs Act (42 U.S.C. 18713(h)(1)(A)) is amended by
striking “in an area designated as a national interest
electric transmission corridor pursuant to section 216(a) of
the Federal Power Act 16 U.S.C. 824p(a)” and inserting “in
a geographic area identified under section 224 of the Federal
Power Act”.
SEC. 2102. RECONDUCTORING AND OTHER ACTIVITIES IN EXISTING
RIGHTS-OF-WAY.
(a) Categorical Exclusion for Reconductoring.—The Federal
Power Act is amended by inserting after section 216 (16
U.S.C. 824p) the following:
“SEC. 216A. GRID CAPACITY EXPANSION IN EXISTING RIGHTS-OF-
WAY.
“(a) Definitions.—In this section:
“(1) Applicable electrical standard.—The term `applicable
electrical standard' includes—
“(A) a reliability standard (as defined in section
215(a)); and
“(B) an applicable clause of the National Electrical
Safety Code published by the Institute of Electrical and
Electronics Engineers Standards Association.
“(2) Covered area.—The term `covered area' means an
area—
“(A) within an existing right-of-way; or
“(B) within the minimum additional area adjacent to an
existing right-of-way, provided that the total additional
area is not more than \1/4\ mile from the boundary of the
right-of-way, that is necessary—
“(i) to comply with applicable electrical standards; or
“(ii) to complete an activity described in subsection (b).
“(3) Covered facility.—The term `covered facility' means
an existing electric transmission or distribution facility or
associated infrastructure (including an electrical
substation) that is located within a covered area.
“(b) Exemptions.—
“(1) In general.—Activities to maintain or increase the
transmission capacity of the electric grid within a covered
area, and any Federal agency action authorizing such
activities shall not be considered to be—
“(A) a major Federal action for purposes of the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or
“(B) an undertaking for purposes of section 306108 of
title 54, United States Code.
“(2) Inclusions.—The activities described in paragraph
(1) include—
“(A) any repair, maintenance, replacement, upgrade,
rebuilding, modification, optimization, minor relocation of,
or addition to, a covered facility, including—
“(i) reconductoring;
“(ii) an increase in operating voltage;
“(iii) a circuit addition or adjustment;
“(iv) installation of advanced transmission technologies
(as defined in section 1223(a) of the Energy Policy Act of
2005 (42 U.S.C. 16422(a))); and
“(v) installation of grid-enhancing advanced transmission
technologies (as defined in section 232(a));
“(B) any minimum widening of an existing right-of-way
associated with an activity described in subparagraph (A)
that—
“(i) is necessary to comply with applicable electrical
standards; or
“(ii) remains within a covered area;
“(C) an addition of energy storage at or near a covered
facility; and
“(D) the addition of a parallel circuit within an existing
right-of-way.”.
(b) Interstate Natural Gas Pipeline Modernization Within
Existing Corridors.—Section 7 of the Natural Gas Act (15
U.S.C. 717f) is amended by adding at the end the following:
“(i) Covered Pipeline Activities.—
“(1) Definitions.—In this subsection:
“(A) Covered activity.—The term `covered activity' means
any repair, maintenance, replacement, upgrade, rebuilding,
modification, optimization, minor relocation, looping,
compression, capacity-enhancement project, or addition to a
covered facility.
“(B) Covered area.—The term `covered area' means—
“(i) an existing right-of-way; and
“(ii) the footprint of original construction previously
authorized and environmentally reviewed under the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.),
together with any minimum additional area adjacent to an
existing right-of-way, provided that the total additional
area is not more than \1/4\ mile from the boundary of the
right-of-way, that is necessary to complete a covered
activity.
“(C) Covered facility.—The term `covered facility' means
an existing interstate natural gas pipeline or associated
infrastructure, including a compressor station, meter
station, regulator station, valve site, launcher, receiver,
storage-related facility, or similar facility located within
a covered area.
“(2) Environmental review.—A covered activity and any
Federal agency action authorizing that covered activity—
“(A) shall not be considered a major Federal action under
the National Environmental Policy Act of 1969 (42 U.S.C. 4321
et seq.) if the covered activity remains within a covered
area; and
“(B) shall not be considered an undertaking for purposes
of section 306108 of title 54, United States Code, if the
covered activity remains within a covered area.
“(3) Rule of construction.—Nothing in this subsection
affects the applicability of any requirement under—
“(A) the Federal Water Pollution Control Act (33 U.S.C.
1251 et seq.) (commonly known as the `Clean Water Act');
“(B) the Clean Air Act (42 U.S.C. 7401 et seq.); or
“(C) any other applicable Federal law not expressly
addressed by this subsection.”.
(c) Pipeline Construction.—Section 7 of the Natural Gas
Act (15 U.S.C. 717f) (as amended by subsection (b)) is
amended by adding at the end the following:
“(j) Pipeline Construction.—To the maximum extent
practicable and reasonable, the proposed construction of an
interstate natural gas pipeline shall be sited—
“(1) near and parallel to roads, the rights-of-way of
railways, or along division lines of lands, according to a
government survey;
“(2) so as not to interfere with the use by the public of
highways or streams; and
“(3) so as not to unnecessarily interfere with the use of
any land by an affected landowner.”.
SEC. 2103. TRANSMISSION PLANNING.
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is
amended by adding at the end the following:
“SEC. 224. TRANSMISSION STUDY.
“(a) In General.—Not later than 1 year after the date of
enactment of this section and every 3 years thereafter, the
Secretary of Energy (referred to in this section as the
`Secretary'), in consultation with affected States and Indian
Tribes, shall conduct a study of electric transmission
capacity constraints and congestion.
“(b) Report.—
“(1) In general.—Not less frequently than once every 3
years, the Secretary shall issue a report based on the study
under subsection (a) or other information relating to
electric transmission capacity constraints and congestion.
“(2) Opportunity for comment.—Before issuing a report
under paragraph (1), the Secretary shall—
“(A) provide an opportunity for comment to affected States
and Indian Tribes; and
“(B) take into consideration any comments received under
subparagraph (A) in preparing the report.
“(3) Identification of areas with capacity constraints and
congestion.—After considering alternatives and
recommendations from interested parties (including any
comments received from affected States and Indian Tribes),
the Secretary may identify in a report issued under paragraph
(1) any geographic area that—
“(A) is experiencing electric energy transmission capacity
constraints or congestion that adversely affects consumers;
or
“(B) is expected to experience such energy transmission
capacity constraints or congestion.
“(c) Consultation.—Not less frequently than once every 3
years, the Secretary, in conducting the study under
subsection (a) and issuing the report under subsection (b),
shall consult with affected transmission planning regions (as
defined in section 225(a)) and any appropriate regional
entity referred to in section 215.
“(d) Alaska.—The Secretary—
“(1) shall, in consultation with the State of Alaska and
affected Indian Tribes, consider any intrastate transmission
capacity constraints and congestion within the State of
Alaska in the study under subsection (a); and
“(2) in issuing the report under subsection (b), may,
subject to the approval of the Regulatory Commission of
Alaska, identify any geographic area in the State of Alaska
that—
“(A) is experiencing electric energy transmission capacity
constraints or congestion that adversely affects consumers;
or
“(B) is expected to experience such energy transmission
capacity constraints or congestion.
“SEC. 225. PLANNING FOR TRANSMISSION FACILITIES THAT ENHANCE
GRID RELIABILITY, AFFORDABILITY, AND
RESILIENCE.
“(a) Definitions.—In this section:
“(1) Commission.—The term `Commission' means the Federal
Energy Regulatory Commission.
“(2) ERO.—The term `ERO' has the meaning given the term
in section 215(a).
“(3) Exempt transmitting utility.—The term `exempt
transmitting utility' means a transmitting utility that is a
State or any political subdivision of a State, an electric
cooperative that receives financing under the Rural
Electrification Act of 1936 (7 U.S.C. 901 et seq.) or that
sells less than 4,000,000 megawatt hours of electricity per
year, or any agency, authority, or instrumentality of any one
or more of the foregoing, or any corporation which is wholly
owned, directly or indirectly, by any one or more of the
foregoing.
“(4) Improved reliability.—The term `improved
reliability' means that, on balance, considering each of the
matters described in subparagraphs (A) through (D),
reliability is improved in a material manner that benefits
customers through at least one of the following:
“(A) Facilitating compliance with a mandatory standard for
reliability approved by the Commission under section 215.
“(B) A reduction in expected unserved energy, loss of load
hours, or loss of load probability (as defined by the ERO).
“(C) Facilitating compliance with a tariff requirement or
process for resource adequacy on file with the Commission.
“(D) Any other similar material improvement, including a
reduction in correlated outage risk.
“(5) Interregional transmission facility.—The term
`interregional transmission facility' means a transmission
facility that—
“(A) is located within 2 or more neighboring transmission
planning regions; or
“(B) significantly impacts the ability of 1 or more
transmission planning regions to transmit electric energy
among neighboring transmission planning regions.
“(6) Regional transmission facility.—The term `regional
transmission facility' means a transmission facility that—
“(A) is located within 1 transmission planning region; and
“(B) is not an interregional transmission facility.
“(7) Transmission planning region.—
“(A) In general.—The term `transmission planning
region'—
“(i) when used in a geographical sense, means a region for
which the Commission determines that electric transmission
planning is appropriate, such as a region established in
accordance with Order No. 1000 of the Commission, entitled
`Transmission Planning and Cost Allocation by Transmission
Owning and Operating Public Utilities' (76 Fed. Reg. 49842
(August 11, 2011)); and
“(ii) when used in a corporate sense, means the
Transmission Organization or other entity responsible for
planning or operating electric transmission facilities within
a region described in clause (i).
“(B) Exclusion.—The term `transmission planning region'
does not include the Electric Reliability Council of Texas or
the region served by members of the Electric Reliability
Council of Texas.
“(b) Jurisdiction.—
“(1) ERCOT.—This section shall not apply within the area
referred to in section 212(k)(2)(A).
“(2) Other utilities.—
“(A) In general.—For the purposes of this section, the
Commission shall have jurisdiction over all transmitting
utilities, including transmitting utilities described in
section 201(f), but excluding any ERCOT utility (as defined
in section 212(k)(2)(B)) and any exempt transmitting utility
that does not voluntarily subject itself to Commission
jurisdiction for the purposes of this section.
“(B) Clarification.—Being subject to Commission
jurisdiction for the purposes of this section shall not make
an entity described in section 201(f) a public utility for
the purposes of section 201(e).
“(c) Rulemaking Requirement.—Not later than 180 days
after the date of enactment of this section, the Commission
shall, consistent with the requirements of this section, by
rule—
“(1) require each transmission planning region to
establish a process for planning for regional transmission
facilities in accordance with this section;
“(2) require neighboring transmission planning regions to
jointly establish a process for planning interregional
transmission facilities in accordance with this section;
“(3) require each transmission planning region to submit
to the Commission for approval—
“(A) a regional transmission planning process; and
“(B) a joint interregional transmission planning process
with each of its neighboring transmission planning regions,
which requirement may, at the discretion of the transmission
planning region, be satisfied through the submission of—
“(i) a separate joint interregional transmission planning
process with each of its neighboring transmission planning
regions; or
“(ii) 1 or more joint interregional transmission planning
processes, any of which may be submitted with any 1 or more
of its neighboring transmission planning regions; and
“(4) establish rate treatments for regional and
interregional transmission planning and cost allocation.
“(d) Transmission Planning Process Elements.—The
Commission shall require, within the rule under subsection
(c), that regional and joint interregional transmission
planning processes contain the following elements:
“(1) Compatibility.—A common set of input assumptions and
models, on a consistent timeline, that—
“(A) allow for the joint identification and selection of
specific interregional transmission facilities, and
individual identification and selection of specific regional
transmission facilities, by transmission planning regions,
for construction or modification, including through the use
of advanced transmission conductors (including
superconductors) and reconductoring;
“(B) consider, to the extent reasonable and economical,
modifications that maximize the transmission capabilities of
existing towers, structures, or rights-of-way; and
“(C) consider interactions with existing regional,
interregional, and supplemental transmission plans and
planning processes, including the consolidated planning
process established under section 228(a).
“(2) Transmission benefits.—A common set of benefits for
regional and interregional transmission planning and cost
allocation, including—
“(A) improved reliability;
“(B) reduced congestion;
“(C) reduced power losses;
“(D) greater carrying capacity that delivers improved
reliability or reductions in the cost of delivered power;
“(E) reduced operating reserve requirements; and
“(F) improved access to generation that achieves
reductions in the cost of delivered power.
“(3) Selection criteria.—Criteria governing the selection
by transmission planning regions, for construction or
modification, of regional and interregional transmission
facilities that—
“(A) provide improved reliability;
“(B) protect or benefit consumers; and
“(C) are consistent with the public interest.
“(4) State and tribal participation.—Any right, role,
engagement period, or opportunity afforded to States or
political subdivisions of a State under a rule issued under
subsection (c), or under any order described in subsection
(h)(1), shall be afforded on a commensurate basis to Indian
Tribes or subdivisions of Indian Tribes.
“(e) Deadline; Planning Cycles.—The regional and joint
interregional transmission planning processes required to be
submitted to the Commission pursuant to the rule under
subsection (c) shall be—
“(1) submitted to the Commission not later than 2 years
after the date of enactment of this section; and
“(2) conducted, including the identification of
transmission needs and the evaluation and selection of
transmission facilities in accordance with subsection (d),
not less frequently than once every 4 years, with the first
planning cycle commencing not later than 1 year after the
date on which the Commission approves the applicable planning
process under subsection (f)(2).
“(f) Commission Review.—The Commission shall—
“(1) review each regional and joint interregional
transmission planning process submitted pursuant to the rule
under subsection (c); and
“(2) approve the regional or joint interregional
transmission planning process if the Commission finds that
the process—
“(A) meets the requirements of subsection (d);
“(B) allocates costs in accordance with subsection (g);
“(C) meets the requirement of sections 205 and 206 that
all rates, charges, terms, and conditions will be just and
reasonable and not unduly discriminatory or preferential; and
“(D) is consistent with the public interest.
“(g) Cost Allocation.—
“(1) Transmission tariffs.—For the purposes of this
section and except as provided in paragraph (2), any
transmitting utility that owns, controls, or operates, or
proposes to construct, electric transmission facilities
selected in a regional or joint interregional transmission
plan for the purposes of cost allocation pursuant to a
transmission planning process approved under subsection
(f)(2) or described in subsection (h)(1) shall file a tariff
or tariff revision with the Commission pursuant to section
205 and the regulations of the Commission allocating the
costs of the new or modified transmission facilities.
“(2) Exception.—In the case of an exempt transmitting
utility that owns, controls, or operates electric
transmission facilities described in paragraph (1), the
Commission, notwithstanding section 211A(c), shall require
the exempt transmitting utility to provide transmission
services over such facilities pursuant to section 211A and
the regulations of the Commission allocating the costs of the
new or modified transmission facilities.
“(3) Requirement.—The Commission shall require that
tariffs or tariff revisions filed under this section are just
and reasonable and allocate the costs of providing service to
customers that benefit, in accordance with the cost-causation
principle and at least roughly commensurate with the
benefits, including through the benefits described in
subsection (d)(2).
“(4) Ratepayer protection.—Customers that receive no
benefit, or benefits that are trivial in relation to the
costs sought to be allocated, from electric transmission
facilities constructed or modified under this section shall
not be involuntarily allocated any of the costs of those
transmission facilities.
“(h) Compliance With This Section.—A Commission order or
rulemaking regarding transmission planning that is effective
as of the date of enactment of this section, including orders
published in the Federal Register on April 28, 2025, December
6, 2024, and June 11, 2024, shall constitute compliance with
the regional transmission planning and cost allocation
requirements of this section and relieves the Commission of
the requirements under subsection (c)(1).
“(i) Construction Permit.—For the purposes of obtaining a
construction permit under section 216(b), a project that is
selected by 1 or more transmission planning regions pursuant
to a regional or joint interregional transmission plan in
accordance with this section shall be considered to satisfy
paragraphs (2) through (5) and, as applicable, (6) or (7) of
that section.
SA 6997. Ms. DUCKWORTH submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 249, strike line 23 and all that follows
through page 256, line 2, and insert the following:
(j) Land Restoration.—Section 216 of the Federal Power Act
(16 U.S.C. 824p) is amended—
(1) by redesignating subsections (j) and (k) as subsections
(k) and (l), respectively; and
(2) by inserting after subsection (i) the following:
“(j) Land Restoration.—
“(1) In general.—Not later than 180 days after the date
of enactment of the Bipartisan American Affordability and
Jobs Act of 2026, the Commission, in consultation with the
Secretary of Agriculture, the Secretary of the Interior,
affected States and Indian Tribes, and relevant stakeholders,
shall issue rules establishing standards for the restoration
of affected property during and after construction of
electric transmission facilities, including—
“(A) standards relating to—
“(i) topsoil separation and replacement;
“(ii) temporary and permanent repair to drain tile;
“(iii) removal of rocks and debris from the right-of-way;
“(iv) restoration of areas of soil compaction;
“(v) restoration of terraces, waterways, and other erosion
control structures;
“(vi) revegetation of untilled land;
“(vii) future installation of drain tile or soil
conservation structures;
“(viii) restoration of land slope and contour;
“(ix) restoration of areas used for field entrances and
temporary roads;
“(x) construction in wet conditions; and
“(xi) designation of a point of contact for affected
landowner inquires or claims; and
“(B) any other standard that the Commission determines is
necessary to ensure that affected landowners are able to use
affected property to as similar an extent as possible to the
use of that property before the construction of an electric
transmission facility.
“(2) Inspections.—
“(A) In general.—The Commission shall require, and
establish procedures for the conduct of, an on-site
inspection for compliance with the standards established
under paragraph (1).
“(B) Requirement.—An on-site inspection under
subparagraph (A) shall be conducted by an independent
professional engineer that—
“(i) is familiar with the standards established under
paragraph (1); and
“(ii) does not have a conflict of interest with respect to
the inspection.
“(C) Cost.—The cost of an inspection under subparagraph
(A) shall be borne by the holder of the permit for the
applicable electric transmission facility.
“(3) Remedies.—
“(A) Initial notice and corrective action.—
“(i) In general.—If, pursuant to an inspection under
paragraph (2), an inspector finds a violation of a standard
established under paragraph (1), a land restoration plan
described in paragraph (4), or an independent
agreement on land restoration, the inspector conducting the
inspection shall—
“(I) give oral notice of the violation, followed by a
written notice, to the holder of the permit for the
applicable electric transmission facility; and
“(II) order that permit holder to take corrective action
to come into compliance and remedy the violation, the cost of
which shall be borne by that permit holder.
“(ii) Cessation of construction activity.—If an
inspection under paragraph (2) occurs during the construction
of an electric transmission facility and the inspector finds
a violation of a standard established under paragraph (1), a
land restoration plan described in paragraph (4), or an
independent agreement on land restoration, the inspector may
issue an order to temporarily halt construction activity
until the permit holder remedies the violation.
“(B) Further action.—
“(i) In general.—If, after receiving notice of a
violation under subparagraph (A)(i), a permit holder does not
remedy the violation identified in the notice, the Commission
shall issue an order requiring corrective action to be taken,
including a timeline for completion.
“(ii) Timeline extension.—The Commission may extend or
alter a timeline established under clause (i) if the permit
holder is actively cooperating with the Commission—
“(I) to remedy the violation identified in the notice
provided under subparagraph (A)(i); and
“(II) to take the corrective action identified in the
order issued under clause (i).
“(iii) Further remedies.—If a permit holder fails to
comply with an order requiring corrective action under clause
(i) within the timeline established by the Commission (as
extended or altered under clause (ii), if applicable), the
Commission—
“(I) may revoke the permit; and
“(II) shall impose a civil penalty equal to the sum
obtained by adding—
“(aa) $100,000; and
“(bb) the reasonable cost, as determined by the
Commission, in consultation with the affected landowners, of
the land remediation activities necessary to remedy the
violation identified in the notice provided under
subparagraph (A)(i).
“(C) Distribution of civil penalty; affected landowner
compensation.—The amount of any civil penalty collected
under subparagraph (B)(iii)(II) shall be distributed as
follows:
“(i) The amount described in item (aa) of that
subparagraph shall be retained by the Commission.
“(ii) The amount described in item (bb) of that
subparagraph shall be provided proportionately to affected
landowners based on the estimated cost of necessary land
remediation activities on the affected property of each
affected landowner.
“(D) Judicial review.—
“(i) In general.—An affected landowner alleging a
violation of any requirement of this subsection, including
violation of a standard established under paragraph (1), an
inspection requirement under paragraph (2), or an order
issued under paragraph (3), may bring a civil action against
the permit holder in—
“(I) the district court of the United States for the
judicial district in which the affected property is located;
or
“(II) the appropriate court of the State in which the
affected property is located.
“(ii) Remedies.—In an action under clause (i), a court
may order all appropriate relief, including injunctive relief
and compensatory, punitive, and incidental damages, including
attorney fees.
“(4) Land restoration plans.—
“(A) In general.—An applicant for a construction permit
under subsection (b) shall file with the application for that
permit under subsection (c) a written land restoration plan
describing how the construction activity will meet the
standards established under paragraph (1).
“(B) Copies of land restoration plan.—An applicant
described in subparagraph (A) shall provide a copy of the
land restoration plan described in that subparagraph to all
affected landowners.
“(5) Independent land restoration agreements.—
Notwithstanding the standards established under paragraph
(1), an applicant for a construction permit under subsection
(b) may, in lieu of or in addition to issuing a land
restoration plan under paragraph (4), enter into written
independent land restoration agreements with affected
landowners.
“(6) Inspections under independent land restoration
agreements.—If an inspection under paragraph (2) is to occur
at a construction site for which an independent land
restoration agreement exists as described in paragraph (5), a
copy of the independent land restoration agreement shall be
provided to the inspector.”.
(k) Conforming Amendments.—
(1) Section 50151(b) of Public Law 117-169 (42 U.S.C.
18715(b)) is amended by striking “facilities designated by
the Secretary to be necessary in the national interest under
section 216(a) of the Federal Power Act (16 U.S.C. 824p(a))”
and inserting “facilities in a geographic area identified
under section 224 of the Federal Power Act”.
(2) Section 1222 of the Energy Policy Act of 2005 (42
U.S.C. 16421) is amended—
(A) in subsection (a)(1)(A), by striking “in a national
interest electric transmission corridor designated under
section 216(a)” and inserting “in a geographic area
identified under section 224”; and
(B) in subsection (b)(1)(A), by striking “in an area
designated under section 216(a)” and inserting “in a
geographic area identified under section 224”.
(3) Section 40106(h)(1)(A) of the Infrastructure Investment
and Jobs Act (42 U.S.C. 18713(h)(1)(A)) is amended by
striking “in an area designated as a national interest
electric transmission corridor pursuant to section 216(a) of
the Federal Power Act 16 U.S.C. 824p(a)” and inserting “in
a geographic area identified under section 224 of the Federal
Power Act”.
SEC. 2102. RECONDUCTORING AND OTHER ACTIVITIES IN EXISTING
RIGHTS-OF-WAY.
(a) Categorical Exclusion for Reconductoring.—The Federal
Power Act is amended by inserting after section 216 (16
U.S.C. 824p) the following:
“SEC. 216A. GRID CAPACITY EXPANSION IN EXISTING RIGHTS-OF-
WAY.
“(a) Definitions.—In this section:
“(1) Applicable electrical standard.—The term `applicable
electrical standard' includes—
“(A) a reliability standard (as defined in section
215(a)); and
“(B) an applicable clause of the National Electrical
Safety Code published by the Institute of Electrical and
Electronics Engineers Standards Association.
“(2) Covered area.—The term `covered area' means an
area—
“(A) within an existing right-of-way; or
“(B) within the minimum additional area adjacent to an
existing right-of-way, provided that the total additional
area is not more than \1/4\ mile from the boundary of the
right-of-way, that is necessary—
“(i) to comply with applicable electrical standards; or
“(ii) to complete an activity described in subsection (b).
“(3) Covered facility.—The term `covered facility' means
an existing electric transmission or distribution facility or
associated infrastructure (including an electrical
substation) that is located within a covered area.
“(b) Exemptions.—
“(1) In general.—Activities to maintain or increase the
transmission capacity of the electric grid within a covered
area, and any Federal agency action authorizing such
activities shall not be considered to be—
“(A) a major Federal action for purposes of the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or
“(B) an undertaking for purposes of section 306108 of
title 54, United States Code.
“(2) Inclusions.—The activities described in paragraph
(1) include—
“(A) any repair, maintenance, replacement, upgrade,
rebuilding, modification, optimization, minor relocation of,
or addition to, a covered facility, including—
“(i) reconductoring;
“(ii) an increase in operating voltage;
“(iii) a circuit addition or adjustment;
“(iv) installation of advanced transmission technologies
(as defined in section 1223(a) of the Energy Policy Act of
2005 (42 U.S.C. 16422(a))); and
“(v) installation of grid-enhancing advanced transmission
technologies (as defined in section 232(a));
“(B) any minimum widening of an existing right-of-way
associated with an activity described in subparagraph (A)
that—
“(i) is necessary to comply with applicable electrical
standards; or
“(ii) remains within a covered area;
“(C) an addition of energy storage at or near a covered
facility; and
“(D) the addition of a parallel circuit within an existing
right-of-way.”.
(b) Interstate Natural Gas Pipeline Modernization Within
Existing Corridors.—Section 7 of the Natural Gas Act (15
U.S.C. 717f) is amended by adding at the end the following:
“(i) Covered Pipeline Activities.—
“(1) Definitions.—In this subsection:
“(A) Covered activity.—The term `covered activity' means
any repair, maintenance, replacement, upgrade, rebuilding,
modification, optimization, minor relocation, looping,
compression, capacity-enhancement project, or addition to a
covered facility.
“(B) Covered area.—The term `covered area' means—
“(i) an existing right-of-way; and
“(ii) the footprint of original construction previously
authorized and environmentally reviewed under the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.),
together with any minimum additional area adjacent to an
existing right-of-way, provided that the total additional
area is not more than \1/4\ mile from the boundary of the
right-of-way, that is necessary to complete a covered
activity.
“(C) Covered facility.—The term `covered facility' means
an existing interstate natural gas pipeline or associated
infrastructure, including a compressor station, meter
station, regulator station, valve site, launcher, receiver,
storage-related facility, or similar facility located within
a covered area.
“(2) Environmental review.—A covered activity and any
Federal agency action authorizing that covered activity—
“(A) shall not be considered a major Federal action under
the National Environmental Policy Act of 1969 (42 U.S.C. 4321
et seq.) if the covered activity remains within a covered
area; and
“(B) shall not be considered an undertaking for purposes
of section 306108 of title 54, United States Code, if the
covered activity remains within a covered area.
“(3) Rule of construction.—Nothing in this subsection
affects the applicability of any requirement under—
“(A) the Federal Water Pollution Control Act (33 U.S.C.
1251 et seq.) (commonly known as the `Clean Water Act');
“(B) the Clean Air Act (42 U.S.C. 7401 et seq.); or
“(C) any other applicable Federal law not expressly
addressed by this subsection.”.
(c) Land Restoration for Interstate Natural Gas
Pipelines.—Section 7 of the Natural Gas Act (15 U.S.C. 717f)
(as amended by subsection (b)) is amended by adding at the
end the following:
“(j) Land Restoration.—
“(1) In general.—Not later than 180 days after the date
of enactment of the Bipartisan American Affordability and
Jobs Act of 2026, the Commission, in consultation with the
Secretary of Agriculture, the Secretary of the Interior,
affected States and Indian Tribes, and relevant stakeholders,
shall issue rules establishing standards for the restoration
of affected property during and after construction of
interstate pipelines, including—
“(A) standards relating to—
“(i) topsoil separation and replacement;
“(ii) temporary and permanent repair to drain tile;
“(iii) removal of rocks and debris from the right-of-way;
“(iv) restoration of areas of soil compaction;
“(v) restoration of terraces, waterways, and other erosion
control structures;
“(vi) revegetation of untilled land;
“(vii) future installation of drain tile or soil
conservation structures;
“(viii) restoration of land slope and contour;
“(ix) restoration of areas used for field entrances and
temporary roads;
“(x) construction in wet conditions; and
“(xi) designation of a point of contact for affected
landowner inquires or claims; and
“(B) any other standard that the Commission determines is
necessary to ensure that affected landowners are able to use
affected property to as similar an extent as possible to the
use of that property before the construction of a pipeline.
“(2) Inspections.—
“(A) In general.—The Commission shall require, and
establish procedures for the conduct of, an on-site
inspection for compliance with the standards established
under paragraph (1).
“(B) Requirement.—An on-site inspection under
subparagraph (A) shall be conducted by an independent
professional engineer that—
“(i) is familiar with the standards established under
paragraph (1); and
“(ii) does not have a conflict of interest with respect to
the inspection.
“(C) Cost.—The cost of an inspection under subparagraph
(A) shall be borne by the holder of the certificate of public
convenience and necessity for the applicable pipeline.
“(3) Remedies.—
“(A) Initial notice and corrective action.—
“(i) In general.—If, pursuant to an inspection under
paragraph (2), an inspector finds a violation of a standard
established under paragraph (1), a land restoration plan
described in paragraph (4), or an independent agreement on
land restoration, the inspector conducting the inspection
shall—
“(I) give oral notice of the violation, followed by a
written notice, to the holder of the certificate of public
convenience and necessity for the applicable interstate
pipeline; and
“(II) order that holder to take corrective action to come
into compliance and remedy the violation, the cost of which
shall be borne by that holder.
“(ii) Cessation of construction activity.—If an
inspection under paragraph (2) occurs during the construction
of an interstate pipeline and the inspector finds a violation
of a standard established under paragraph (1), a land
restoration plan described in paragraph (4), or an
independent agreement on land restoration, the inspector may
issue an order to temporarily halt construction activity
until the holder of the certificate of public convenience and
necessity remedies the violation.
“(B) Further action.—
“(i) In general.—If, after receiving notice of a
violation under subparagraph (A)(i), a holder of a
certificate of public convenience and necessity does not
remedy the violation identified in the notice, the Commission
shall issue an order requiring corrective action to be taken,
including a timeline for completion.
“(ii) Timeline extension.—The Commission may extend or
alter a timeline established under clause (i) if the holder
of the certificate of public convenience and necessity is
actively cooperating with the Commission—
“(I) to remedy the violation identified in the notice
provided under subparagraph (A)(i); and
“(II) to take the corrective action identified in the
order issued under clause (i).
“(iii) Further remedy.—If a holder of a certificate of
public convenience and necessity fails to comply with an
order requiring corrective action under clause (i) within the
timeline established by the Commission (as extended or
altered under clause (ii), if applicable), the Commission—
“(I) may revoke the certificate of public convenience and
necessity; and
“(II) shall impose a civil penalty equal to the sum
obtained by adding—
“(aa) $100,000; and
“(bb) the reasonable cost, as determined by the
Commission, in consultation with the affected landowners, of
the land remediation activities necessary to remedy the
violation identified in the notice provided under
subparagraph (A)(i).
“(C) Distribution of civil penalty; affected landowner
compensation.—The amount of any civil penalty collected
under subparagraph (B)(iii)(II) shall be distributed as
follows:
“(i) The amount described in item (aa) of that
subparagraph shall be retained by the Commission.
“(ii) The amount described in item (bb) of that
subparagraph shall be provided proportionately to affected
landowners based on the estimated cost of necessary land
remediation activities on the affected property of each
affected landowner.
“(D) Judicial review.—
“(i) In general.—An affected landowner alleging a
violation of any requirement of this subsection, including
violation of a standard established under paragraph (1), an
inspection requirement under paragraph (2), or an order
issued under paragraph (3), may bring a civil action against
the holder of the certificate of public convenience and
necessity in—
“(I) the district court of the United States for the
judicial district in which the affected property is located;
or
“(II) the appropriate court of the State in which the
affected property is located.
“(ii) Remedies.—In an action under clause (i), a court
may order all appropriate relief, including injunctive relief
and compensatory, punitive, and incidental damages, including
attorney fees.
“(4) Land restoration plans.—
“(A) In general.—An applicant for a certificate of public
convenience and necessity under this section shall file with
the application for that certificate a written land
restoration plan describing how the construction activity
will meet the standards established under paragraph (1).
“(B) Copies of land restoration plan.—An applicant
described in subparagraph (A) shall provide a copy of the
land restoration plan described in that subparagraph to all
affected landowners.
“(5) Independent land restoration agreements.—
Notwithstanding the standards established under paragraph
(1), an applicant for a certificate of public convenience and
necessity under this section may, in lieu of or in addition
to issuing a land restoration plan under paragraph (4), enter
into written independent land restoration agreements with
affected landowners.
“(6) Inspections under independent land restoration
agreements.—If an inspection under paragraph (2) is to occur
at a construction site for which an independent land
restoration agreement exists as described in paragraph (5), a
copy of the independent land restoration agreement shall be
provided to the inspector.”.
SA 6998. Ms. DUCKWORTH submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 72, line 8 of the amendment, strike “150 days”
and insert “4 years”.
On page 77, line 15 of the amendment, strike “150 days”
and insert “4 years”.
Beginning on page 108 of the amendment, strike line 20 and
all that follows through page 109, line 7.
On page 136, line 23 of the amendment, strike “150 days”
and insert “4 years”.
On page 137, line 10 of the amendment, strike “150 days”
and insert “4 years”.
On page 137, lines 22 and 23 of the amendment, strike “150
days” and insert “4 years”.
On page 162, line 20 of the amendment, strike “150 days”
and insert “4 years”.
On page 351, line 11 of the amendment, strike “150 days”
and insert “4 years”.
On page 486, line 1 of the amendment, strike “150 days”
and insert “4 years”.
SA 6999. Ms. MURKOWSKI (for herself, Mr. Schatz, Ms. Cantwell, Mr. Gallego, Mr. Lujan, and Mr. Hickenlooper) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 461, strike line 8 and all that follows
through page 464, line 13, and insert the following:
“(ix) the continuation, operation, maintenance, or post-
approval implementation of a project, activity, or program
after the determination has been made under subsection (c),
except that a subsequent discrete decision of a Federal
agency to amend or materially modify a determination made
under subsection (c) is itself an undertaking, to the extent
provided in this section.
“(C) Rule of construction with respect to indian tribes
and native hawaiian organizations.—
“(i) In general.—Notwithstanding subparagraph (A) and
clauses (i) and (ii) of subparagraph (B), a project,
activity, or program receiving Federal financial assistance
shall be considered an undertaking for purposes of this
section if—
“(I) the Federal agency providing the financial assistance
has discretionary authority to approve, condition, or modify
the use of the assistance for the project, activity, or
program; and
“(II) based on reasonably available information, including
information provided by an Indian tribe or Native Hawaiian
organization, the Federal agency knows or has reason to
believe that the project, activity, or program may affect a
property of traditional religious and cultural importance to
an Indian tribe or Native Hawaiian organization.
“(ii) Determination.—
“(I) In general.—The determination under clause (i)(II)
shall be made as part of the initial determination of the
Federal agency of whether a project, activity, or program
constitutes an undertaking under subsection (c)(2).
“(II) Information.—In making such a determination under
clause (i)(II), the Federal agency shall seek information
from any Indian tribe or Native Hawaiian organization
reasonably identified as attaching religious and cultural
significance to properties in the geographic area potentially
affected.
“(iii) Limitation.—Nothing in this subparagraph—
“(I) requires a separate archaeological survey, formal
determination of eligibility for inclusion in the National
Register, or other identification effort solely for purposes
of determining whether a project, activity, or program
constitutes an undertaking under clause (i);
“(II) requires a Federal agency to determine whether a
project, activity, or program will have an adverse effect on
a historic property before determining whether the project,
activity, or program constitutes an undertaking under clause
(i);
“(III) alters the requirements applicable to the
identification and evaluation of historic properties or
consultation with Indian tribes or Native Hawaiian
organizations after a project, activity, or program is
determined to constitute an undertaking; or
“(IV)(aa) extends the deadline for determining whether a
project, activity, or program constitutes an undertaking
under subsection (c)(2); or
“(bb) requires the Federal agency to delay the
determination pending the receipt of information from an
Indian tribe or Native Hawaiian organization.”; and
(4) by adding at the end the following:
“(c) Consultation.—
“(1) In general.—The responsibilities of a Federal agency
under this section shall be limited to historic properties
within the area of potential effects identified by the
Federal agency.
“(2) Initiation and report.—
“(A) Determination.—
“(i) In general.—Not later than 30 days after the date of
receipt of a request for review of a proposed project,
activity, or program under this section, the applicable
Federal official shall determine whether the proposed
project, activity, or program is an undertaking subject to
the requirements of this section.
“(ii) Potential effect.—If an applicable Federal official
determines that the applicable undertaking is a type of
activity that does not have the potential to cause any effect
on a historic property (assuming a historic property is
present), the applicable Federal official shall have no
further obligation under this section.
“(iii) Applicability of other provisions.—Subject to
paragraph (7)(B)(ii), if the review of an undertaking is
governed by a Federal agency program alternative established
under section 800.14 of title 36, Code of Federal Regulations
(or a successor regulation), or this section, including an
alternate procedure, programmatic agreement, exempted
category, standard treatment, or program comment, the
applicable Federal official shall carry out this paragraph in
accordance with that program alternative, subject to
paragraph (4), subparagraphs (A) and (B) of paragraph (5),
and paragraph (6).
“(B) Report on undertaking.—
“(i) In general.—If the applicable Federal official
determines under subparagraph (A) that the proposed project,
activity, or program is an undertaking, the applicable
Federal official shall prepare a report that includes—
“(I) a determination regarding the area of potential
effects for the undertaking;
“(II) identification of any historic properties within the
area of potential effects; and
“(III) description of the adverse effects, if any, of the
undertaking on historic properties within the area of
potential effects.
“(ii) Mandatory solicitation of information.—In making a
determination under subparagraph (A)(i), the applicable
Federal official shall seek, discuss, as appropriate, and
incorporate, as applicable, information from each applicable
State Historic Preservation Officer, Tribal Historic
Preservation Officer, Indian tribe, or Native Hawaiian
organization, local government, and project, activity, or
program applicant, if the information is communicated to the
applicable Federal official not later than 30 days after the
date on which the Federal official submits a request for such
information.
SA 7000. Ms. MURKOWSKI (for herself, Mr. Schatz, Ms. Cantwell, Mr. Gallego, and Mr. Lujan) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 491 of the amendment, strike lines 17 through 22
and insert the following:
“For each of fiscal years 2027 through 2036, there is
authorized to be appropriated, from the unappropriated
balance of the Historic Preservation Fund on September 30,
2026, or the general fund of the Treasury, $400,000,000 for
deposit in the Historic Preservation Fund, from which the
Secretary shall provide grants to Tribal Historic
Preservation Officers and other capacity grants to carry out
this division, including grants administered pursuant to
section 302907 for Indian tribes and Native Hawaiian
organizations to establish, enhance, or expand their capacity
to carry out their responsibilities under this division.”.
SA 7001. Mr. HEINRICH (for Mr. Booker (for himself and Mr. Durbin)) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 74 of the amendment, strike line 20 and
all that follows through page 78, line 4, and insert the
following:
“(5) Treatment of supplemental or revised environmental
documents.—
“(A) In general.—For purposes of a claim—
“(i) a supplemental or revised environmental document for
an authorization, when required by court order, shall be
considered to be a separate environmental document; and
“(ii) the deadline for filing a claim for judicial review
of an authorization described in clause (i) shall be the date
that is 150 days after the date on which the authorization
for which the supplemental environmental document is prepared
is made public by the agency, unless a shorter time is
specified in the Federal law pursuant to which judicial
review is authorized.
“(B) Limitation.—A claim for review of an authorization
described in subparagraph (A)(i) shall be limited to
information contained in the final supplemental environmental
documents that was not contained in a previous environmental
document for the authorization.
“(6) Actions for use of tribal trust resources.—
SA 7002. Mr. MARKEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 111, strike line 16 and all that follows
through page 130, line 15, and insert the following:
“(i) deny certification for any reason other than making a
reasoned determination based on the record that—
“(I) no modification to or reasonable condition on the
certification would make it possible to grant the
certification without violating water quality requirements;
or
“(II) after the certifying authority has sent the
communication described in clause (v)(II) of paragraph (3)(C)
and given the applicant a reasonable opportunity to provide
the additional materials or information described in that
communication, the application continues to lack the
information required under clause (ii) and, if applicable,
clause (iii) of that paragraph; or
“(ii) grant certification with conditions, except for
conditions that the certifying authority, through a reasoned
determination based on the record, determines are necessary
to ensure compliance with water quality requirements.
“(C) Savings provision.—Nothing in this paragraph allows
a Federal licensing or permitting agency to refuse to include
conditions from a certifying authority in a Federal license
or permit if the certifying authority determines the
conditions are necessary to ensure compliance with water
quality requirements.
“(3) Required procedures.—
“(A) Notice and hearings.—Taking into account State or
Tribal law, as appropriate, and the review period described
in paragraph (4), each certifying authority shall establish
procedures for—
“(i) public notice in the case of all certification
applications;
“(ii) to the extent the certifying authority determines to
be appropriate, public hearings in connection with specific
certification applications; and
“(iii) a prefiling meeting as described in subparagraph
(B).
“(B) Prefiling meeting.—
“(i) Request.—Before submitting a certification
application, the prospective applicant may request a
prefiling meeting with the certifying authority—
“(I) to ensure that the certifying authority receives
early notification of projects for which a certification
under subsection (a) is necessary; and
“(II) to discuss informational needs with the certifying
authority before submitting the application.
“(ii) Response required.—If a prospective applicant
requests a prefiling meeting with a certifying authority
pursuant to clause (i), the certifying authority shall—
“(I) respond to the request not later than 30 days after
the date on which the request is received; and
“(II) hold the prefiling meeting with the prospective
applicant not later than 60 days after the date on which the
request is received.
“(C) Certification applications.—
“(i) Application in writing.—A certification application
shall be made in writing to the applicable certifying
authority.
“(ii) Requirements for complete application.—A complete
certification application shall consist of the following:
“(I) Identification of each applicant for the Federal
license or permit with respect to which the certification
application is made.
“(II) A statement that information included in the
certification application is truthful, accurate, and
complete, to the best knowledge of each such applicant.
“(III) In the case of a certification application with
respect to an individual permit or license—
“(aa) identification of the Federal license or permit that
is the subject of the certification application with respect
to which the certification is requested;
“(bb) identification of any activity the conduct of which
is subject to the Federal license or permit;
“(cc) identification of the location and nature of any
discharge that may result from the activity, and the location
of the receiving waters;
“(dd) a description of means that may be used to monitor,
control, or manage any such discharge; and
“(ee) a list of all other Federal, interstate, Tribal,
State, or local agency authorizations related to the
requirement for a certification under subsection (a), and any
approval or denial of such an authorization already received.
“(IV) Any additional materials required by the applicable
certifying authority pursuant to clause (iii), subject to the
condition that the additional materials shall only be
required with respect to certification applications submitted
after the date on which the regulation described in that
clause has been promulgated.
“(iii) Additional materials.—
“(I) In general.—A certifying authority may promulgate
regulations establishing materials to be required in
completed certification applications in addition to the
materials described in subclauses (I) through (III) of clause
(ii) that the certifying authority determines are necessary
to demonstrate to the certifying authority compliance with
water quality requirements.
“(II) Requirement.—In promulgating regulations under
subclause (I), a certifying authority shall only base the
determination regarding what additional materials are needed
on what can reasonably be expected of an applicant at the
time at which a certification application is submitted.
“(III) Effect of failure to promulgate.—Beginning on or
after December 31, 2027, if a certifying authority fails to
promulgate regulations under subclause (I), a certification
application to that certifying authority shall be considered
complete if the certification application includes all of the
items described in subclauses (I) through (III) of clause
(ii).
“(IV) Transition.—Prior to December 31, 2027, a
certifying authority may require materials beyond the
materials described in subclauses (I) through (III) of clause
(ii) without promulgating regulations under subclause (I)
through a single written notice applicable to all applicants
submitting certification applications if the certifying
authority determines that those additional materials are
necessary to demonstrate to the certifying authority
compliance with water quality requirements and the additional
materials are those that can be reasonably expected of an
applicant at the time at which a certification application is
submitted.
“(iv) Acknowledgment of receipt.—Not later than 3 days
after the date on which an applicant submits to a certifying
authority a certification application for an individual
Federal license or permit, the certifying authority shall
acknowledge receipt of the certification application in
writing.
“(v) Notification of complete application or
identification of missing materials.—Not later than 90 days
after the date on which a certifying authority acknowledges
receipt of a certification application under clause (iv), the
certifying authority shall—
“(I) provide the applicant a written notification that the
certification application is complete; or
“(II) identify to the applicant in writing all specific
additional materials or information described in clauses (ii)
and, if applicable, (iii) necessary for the certification
application to be considered complete, including, for each
such additional piece of material or information, a
description of the water quality requirement for which the
additional material or information is needed in order to
evaluate compliance with that water quality requirement.
“(vi) Petition to court.—
“(I) Right to petition.—An applicant may petition for
judicial review of an alleged failure by a certifying
authority to act in accordance with clauses (ii) through (v)
by filing a written petition in a court of competent
jurisdiction.
“(II) Considerations.—In reviewing a petition under this
subclause, a reviewing court shall consider—
“(aa) the administrative record, which shall consist of
the materials required to be submitted under clause (ii);
“(bb) any materials or information identified by
certifying authority as missing pursuant to a notification
under clause (v)(II);
“(cc) the information submitted by the applicant to the
certifying authority; and
“(dd) any evidence presented to the court by the applicant
that suggests that the defense of the certifying authority to
the petition is pretextual.
“(III) Court order.—If a court, in reviewing a petition
under this clause, finds that a certifying authority has
failed to act in accordance with any of clauses (ii), (iv),
and (v), the court shall provide injunctive relief, as
appropriate, to give effect to this section.
“(D) Denials of certification for individual license or
permit.—If a certifying authority denies a certification
application for an individual license or permit, the
certifying authority shall provide to the applicant and the
applicable Federal licensing or permitting agency—
“(i) the specific water quality requirements that the
certifying authority determined will be violated if
certification were granted;
“(ii) a statement explaining why the certifying authority
determined the identified water quality requirements will be
violated; and
“(iii) if the denial is due to insufficient information, a
description of the specific water quality data or
information, if any, that would be needed to evaluate whether
granting certification will comply with water quality
requirements.
“(4) Review period.—
“(A) In general.—Subject to subparagraph (C) and in
consultation with each certifying authority, a licensing or
permitting agency shall, categorically or on a case-by-case
basis for each certification application, establish a
reasonable period of time (not to exceed 1 year from the date
of receipt of the certification application) within which a
certifying authority shall issue a final action on the
certification application, which shall account for time
required under applicable State or Tribal law for public
notice and comment periods, if any.
“(B) Failure to act.—If a certifying authority fails or
refuses to issue a final action as described in paragraph (6)
on a certification application by the end of the reasonable
period of time established under subparagraph (A) and the
reasonable period of time has not been extended in accordance
with subparagraph (C), the requirement for a certification
under subsection (a) shall be waived, except that the
reasonable period of time shall restart in the event that the
certification application is voluntarily withdrawn by the
applicant and the applicant submits a new certification
application.
“(C) Requirement for extension.—With respect to a
certification application, the reasonable period of time
established under subparagraph (A) may only be extended if—
“(i) the extension is requested, in writing, by the
applicant; and
“(ii) the certifying authority concurs, in writing, with
the extension.
“(5) Waiver of certification requirement.—
“(A) In general.—A certifying authority may, at any time
during the reasonable period of time described in paragraph
(4), affirmatively waive the requirement for a certification
under subsection (a).
“(B) No judicial review.—Notwithstanding any other
provision of Federal law, including any provision of this
section, a waiver of the requirement for a certification
under this section shall not be subject to judicial review.
“(6) Final action.—Not later than the date on which the
reasonable period of time established under paragraph (4) for
a certification application ends or on the date of a waiver
pursuant to paragraph (5)(A), as applicable, the certifying
authority shall apply
only 1 of the following final actions to the certification
application:
“(A) The certification application is granted.
“(B) The certification application is granted with
conditions.
“(C) The certification application is denied.
“(D) The certification requirements under subsection (a)
have been waived in accordance with paragraph (4) or (5) with
respect to the certification application.
“(f) Judicial Review.—
“(1) Burdens of proof.—When reviewing a denial of a
certification under this section, a court shall place the
burden of proof on the certifying authority to demonstrate
that no reasonable modifications to or reasonable conditions
on the certification would make it possible to grant the
certification without violating water quality requirements.
“(2) Conditions.—When reviewing a challenge to 1 or more
conditions required by a certifying authority under this
section, a court shall place the burden of proof on the
certifying authority to demonstrate that the 1 or more
challenged conditions are—
“(A) necessary to allow the certification to be made
without violating water quality requirements; and
“(B) the least burdensome condition or set of conditions
for avoiding violation of water quality requirements.
“(g) Special Rule for Certain Certifications.—
“(1) Definition of interstate transmission line project.—
In this subsection, the term `interstate transmission line
project' means a project for the construction, modification,
or upgrade of a transmission facility that is part of the
bulk-power system (as defined in section 215(a) of the
Federal Power Act (16 U.S.C. 824o(a))).
“(2) Limitation on certification requirements for certain
interstate linear infrastructure.—Notwithstanding the first
sentence of subsection (a)(1), any applicant for a
certificate of public convenience and necessity for a project
under section 7 of the Natural Gas Act (15 U.S.C. 717f) or a
Federal authorization or permit required to construct,
modify, or operate an interstate transmission line project
that may result in a point source discharge into the waters
of the United States shall provide to the Federal licensing
or permitting agency a certification from a certifying
authority that such point source discharge complies with
water quality requirements or a waiver pursuant to this
section.
“(3) Certification of no limitation and standard.—In the
case of any point source discharge described in this
subsection for which there is not an applicable effluent
limitation or other limitation under sections 301(b) and 302
and for which there is not an applicable standard under
sections 306 and 307, the certifying authority shall so
certify, except that such a certification shall not satisfy
section 511(c).
“(4) Review for compliance.—Notwithstanding subsection
(a)(4)—
“(A) prior to the initial operation of any federally
licensed or permitted facility or activity that may result in
a point source discharge into the waters of the United States
and with respect to which a certification has been obtained
pursuant to this subsection, which facility or activity is
not subject to a Federal operating license or permit, the
licensee or permittee shall provide an opportunity for the
certifying authority to review the manner in which the
facility or activity shall be operated or conducted for the
purposes of assuring that applicable effluent limitations or
other limitations or other applicable water quality
requirements will not be violated;
“(B) on notification by the certifying authority that the
operation of any federally licensed or permitted facility or
activity described in subparagraph (A) will violate
applicable effluent limitations or other limitations or other
water quality requirements, the applicable Federal agency
may, after public hearing, suspend the Federal license or
permit; and
“(C) if a Federal license or permit is suspended pursuant
to subparagraph (B), the Federal license or permit shall
remain suspended until notification is received from the
certifying authority that there is reasonable assurance that
the facility or activity will not violate the applicable
provisions of sections 301, 302, 303, 306, and 307.
“(5) Limitation and monitoring requirements of certain
linear infrastructure certifications.—Notwithstanding
subsection (d)—
“(A) any certification provided under this subsection
shall set forth any effluent limitations and other
limitations and monitoring requirements necessary to assure
that any point source discharge subject to this subsection
will comply with the applicable provisions of sections 301,
302, 303, 306, and 307; and
“(B) any limitations and requirements set forth pursuant
to subparagraph (A) shall be imposed by the licensing or
permitting agency as a condition on any Federal license or
permit subject to the provisions of this section.
“(6) Reasonable period of time.—Notwithstanding the
periods of time in subsections (a)(1) and (e)(4), a licensing
or permitting agency shall, categorically or on a case-by-
case basis for each certification application, establish a
reasonable period of time (not to exceed 9 months from the
date of receipt of the certification application) within
which a certifying authority shall issue a final action on
the certification application under this subsection, which
shall account for the time required under applicable State or
Tribal law for public notice and comment periods.
“(h) Definitions.—In this section:
“(1) Certification application.—The term `certification
application' means a request from an applicant for a
certification described in subsection (a).
“(2) Certifying authority.—The term `certifying
authority', with respect to a certification application,
means, as applicable—
“(A) the State or interstate agency to which the
certification application was submitted, including an Indian
Tribe that is treated as a State for purposes of this section
pursuant to section 131.8 of title 40, Code of Federal
Regulations; or
“(B) if no State or interstate agency has the authority to
provide the certification described in subsection (a), the
Administrator.
“(3) Water quality requirements.—The term `water quality
requirements' means—
“(A) the applicable provisions of sections 301, 302, 303,
306, and 307;
“(B) any Federal and State or Tribal laws (including
regulations) implementing sections 301, 302, 303, 306, and
307 that are applicable to discharges into waters of the
United States; and
“(C) any State or Tribal laws related to aquatic
environmental health, recreational water quality, or other
water quality requirements applicable to discharges to waters
of a State.”.
SA 7003. Mrs. BRITT submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 296, line 22, insert “or section 2107 of the
Bipartisan American Affordability and Jobs Act of 2026”
after “section”.
SA 7004. Mr. HEINRICH (for Ms. Smith) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 169 of the amendment, strike line 22 and
all that follows through page 172, line 2, and insert the
following:
(1) Covered project or action.—
(A) In general.—The term “covered project or action”
means a project or action with a non-Federal project sponsor
that has secured all necessary Federal authorizations or
permits for construction or operation.
(B) Exclusion.—The term “covered project or action” does
not include initial authorizations or rights to develop where
additional approvals, authorizations, or permits are required
for construction or operation.
(2) Federal authorization or permit.—The term “Federal
authorization or permit” means an authorization, permit,
record of decision, right-of-way, finding of no significant
impact, verification, extension, construction and operations
plan, biological opinion, incidental take statement,
concurrence, variance, departure, determination, or any other
similar approval or order that is necessary, including any
determination by a Federal department or agency that
additional authorizations or permits are not necessary, for
the construction or operation at normal capacity of a
project.
(b) Maintenance of Authorizations and Permits.—
(1) In general.—For covered projects or actions, a Federal
department or agency shall not take any new action that would
revoke, rescind, withdraw, terminate, suspend, vacate,
remand, reopen, materially amend, or materially alter a
Federal authorization or permit in effect on or after
November 6, 2026, or take any other action to interfere with
or prevent the construction or operation at normal capacity
of a project that has secured all necessary Federal
authorizations and permits, unless—
(A) the Federal department or agency takes such action in
response to an order by a court of competent jurisdiction;
(B) the holder of the Federal authorization or permit has
materially breached the terms of the Federal authorization or
permit or otherwise materially violated applicable law;
(C) the Federal authorization or permit was obtained
through fraud, intentional concealment, or material
misrepresentation;
(D) such action is necessary to prevent immediate,
specific, urgent, substantial, and proximate harm or damage
to life, property, human health, the environment, national
security, or defense that is based on new information that
was not considered in the underlying environmental review
process or final agency action for the Federal authorization
or permit;
(E) the Federal department or agency has received a request
from the holder of the Federal authorization or permit for
the covered project or action to take such action;
(F) such action is taken pursuant to any applicable law or
regulation; or
(G) the Federal authorization or permit was issued in
violation of, in conflict with, ultra vires of, or in ways
not permitted by, Federal law or regulations, as determined
by the issuing Federal department or agency.
SA 7005. Mr. OSSOFF (for himself and Mr. Warnock) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of section 2213, add the following:
(f) In general.—The applicable Secretary shall ensure an
appropriate process for permitting eligible projects under
this section.
SA 7006. Mr. MORAN (for himself, Mr. Grassley, and Mr. Schmitt) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
On page 242, strike line 2 and insert the following:
the siting of the applicable facility.
“(6) Land restoration.—
“(A) In general.—In acting on applications for permits
issued under subsection (b), the Commission shall apply
practices and procedures related to the preservation and
restoration of affected property, including farmland,
ranchland, and Tribal land, and mitigation of impacts to such
property, that are no less protective than the practices and
procedures that the Commission applies when reviewing
applications under section 7 of the Natural Gas Act (15
U.S.C. 717f).
“(B) Corrective action.—If the holder of a permit issued
under subsection (b) fails to comply with any requirement or
condition imposed by the Commission that is related to the
preservation or restoration of, or mitigation of impacts to,
affected property, the Commission may issue an order
requiring corrective action, the costs of which shall be
borne by the permit holder.
“(C) Savings provision.—Nothing in this paragraph
precludes measures or requirements for the protection,
mitigation, or restoration of affected property that differ
from those prescribed in this paragraph.”.
SA 7007. Mr. WARNOCK (for himself and Mr. Ossoff) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of section 1205, add the following:
(f) In General.—the applicable Secretary shall ensure an
appropriate process for permitting and certifying projects
under this section.
SA 7008. Mr. MERKLEY submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 141 of the amendment, strike line 10 and
all that follows through page 142, line 2, and insert the
following:
“(2)(A) The terms `best scientific and commercial data
available' and `best scientific data available' mean
scientific information, including traditional ecological
knowledge, that is available to the Secretary and is
accurate, reliable, and relevant to the matter under
consideration, including information derived from peer-
reviewed research, agency studies and monitoring,
scientifically credible data and analyses, expert judgment,
and other scientifically valid sources.
“(B) In determining whether scientific information is
accurate, reliable, and relevant under subparagraph (A), the
Secretary shall consider—
“(i) the extent to which the information accurately
estimates, identifies, or describes the condition, process,
or relationship at issue;
“(ii) the appropriateness and transparency of the
scientific methods, data, assumptions, and analyses used;
“(iii) the consistency of the information with established
scientific principles and the extent to which uncertainty,
limitations, and conflicting evidence are disclosed;
“(iv) the relevance of the information to the ecological,
geographic, spatial, and temporal scales of the decision; and
“(v) the degree to which the information has been
independently reviewed, tested, corroborated, or otherwise
subjected to scientific scrutiny.”; and
Beginning on page 144 of the amendment, strike line 21 and
all that follows through page 161, line 22.
On page 164, line 3 of the amendment, strike “2031—” and
all that follows through “Act.” on line 7 and insert “2031
to carry out section 7 of the Endangered Species Act of 1973