SA 6956. Mr. BENNET (for himself, Mr. Schiff, and Mr. Lujan) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 47 of the amendment, strike line 4 and
all that follows through page 72, line 24, and insert the
following:
“(c) Public Review.—
“(1) Publication in federal register.—Each Federal agency
shall publish each draft environmental impact statement and
environmental assessment prepared for a proposed agency
action in the Federal Register.
“(2) Public comment; tribal consultation.—
“(A) In general.—Each draft environmental impact
statement and environmental assessment prepared for a
proposed agency action published under paragraph (1) shall
include a request for—
“(i) Tribal consultation, subject to the condition that
the Federal agency submits a written request for such Tribal
consultation to each relevant Indian Tribe after publication
of such draft document in the Federal Register; and
“(ii) public comment on alternatives or impacts on the
relevant information, studies, or analyses with respect to
the proposed agency action.
“(B) Comment and consultation period.—The lead agency
shall establish, with respect to each draft environmental
impact statement and environmental assessment published under
paragraph (1)—
“(i) a Tribal consultation period of not less than 45
days, to begin after the date on which the lead agency
submits a request for Tribal consultation with each relevant
Indian Tribe; and
“(ii) a public comment period of not less than 45 days, to
begin after the date on which the draft document is published
in the Federal Register.”;
(2) in subsection (e), by redesignating paragraphs (1) and
(2) as paragraphs (2) and (1), respectively, and moving the
paragraphs so as to appear in numerical order;
(3) in subsection (f)—
(A) in the subsection heading, by inserting “and Use of
Existing Documents” after “Preparation”;
(B) by striking “A lead agency” and inserting the
following:
“(1) In general.—A lead agency”; and
(C) by adding at the end the following:
“(2) Existing documents.—On the request of a project
sponsor, a lead agency shall consider and, as appropriate,
adopt, tier to, or incorporate by reference, the analysis and
documentation prepared for a proposed agency action or
similar agency action under Federal law or the laws and
procedures of a State or an Indian Tribe as the
documentation, or part of the documentation, required to
complete an environmental review, if the analysis and
documentation were developed pursuant to Federal law or the
laws and procedures of the State or Indian Tribe that serve a
similar function as compliance by
the lead agency with this Act, as determined by the lead
agency.”;
(4) in subsection (g)—
(A) by striking paragraph (1) and inserting the following:
“(1) In general.—
“(A) Environmental assessments.—
“(i) In general.—Except as provided in section
106(b)(1)(B) or paragraph (2), with respect to a proposed
agency action, a lead agency shall complete and make public
the environmental assessment, if applicable, not later than
the date that is 1 year after the earlier of, as applicable—
“(I) the date on which the lead agency determines that
section 106(b)(1)(A) requires the preparation of an
environmental assessment with respect to the proposed agency
action; and
“(II) the date on which the lead agency notifies the
project sponsor that the application for the proposed agency
action is complete.
“(ii) Additional requirements.—On completion of an
environmental assessment—
“(I)(aa) not later than 7 days after the date on which the
lead agency completes and makes public the environmental
assessment, the lead agency shall issue a finding of no
significant impact;
“(bb) not later than 90 days after the date on which the
lead agency completes and makes public the environmental
assessment, all Federal agencies participating in the
environmental review shall issue and make public a decision
on all outstanding authorizations for the proposed agency
action; and
“(cc) not later than 120 days after the date on which the
lead agency completes and makes public the environmental
assessment, all Federal agencies not participating in the
environmental review shall issue and make public a decision
on all outstanding authorizations for the proposed agency
action; or
“(II) not later than 7 days after the date on which the
lead agency completes the environmental assessment, the lead
agency shall publish a notice of intent to prepare an
environmental impact statement.
“(B) Environmental impact statements.—
“(i) In general.—Except as provided in paragraph (2),
with respect to a proposed agency action, the lead agency
shall publish an environmental impact statement, if
applicable, not later than the date that is 2 years after the
earlier of, as applicable—
“(I) the date on which the lead agency determines that
section 102(2)(C) requires the issuance of an environmental
impact statement with respect to the proposed agency action;
and
“(II) the date on which the lead agency notifies the
project sponsor that the application for the proposed agency
action is complete.
“(ii) Additional requirements.—
“(I) Record of decision.—Not later than 45 days after the
date on which the lead agency publishes an environmental
impact statement for a proposed agency action, the lead
agency shall issue a record of decision.
“(II) Issuance of authorizations.—
“(aa) In general.—Not later than 90 days after the date
on which the lead agency publishes an environmental impact
statement for a proposed agency action, all Federal agencies
participating in the environmental review shall issue a
decision on all outstanding authorizations for the proposed
agency action.
“(bb) Federal agencies not participating.—Not later than
120 days after the date on which the lead agency publishes an
environmental impact statement for a proposed agency action,
all Federal agencies not participating in the environmental
review shall issue and make public a decision on all
outstanding authorizations for the proposed agency action.
“(iii) Savings provision.—Nothing in this subparagraph
prohibits an agency from issuing an environmental impact
statement and record of decision in a single document.
“(C) Dispute resolution.—
“(i) Definition of eligible dispute or delay.—In this
subparagraph, the term `eligible dispute or delay' means a
dispute or delay with respect to the preparation of an
environmental document, a comment by a Federal agency
required by Federal law, or an authorization involving more
than 1 Federal agency for which a project sponsor sends a
notification to the Chairman under clause (ii).
“(ii) Notification of dispute.—The Chairman, in
consultation with each Federal agency participating in the
preparation of an environmental document for a proposed
agency action, shall, to the maximum extent practicable to
meet the deadlines established under this subsection and the
schedule developed under subsection (a)(1)(C)(iv), facilitate
resolution of an eligible dispute or delay, including an
anticipated delay, between those Federal agencies with
respect to preparation of an environmental document, a
comment by a Federal agency required by Federal law, or an
authorization not later than 30 days after the date of
receipt of a notification from a project sponsor.
“(iii) Determination of resolution.—If an eligible
dispute or delay, including an anticipated delay, described
in clause (ii) remains unresolved by the date that is 30 days
after the date on which a notification is received under that
clause, the Chairman, not later than 14 days after that date,
shall determine a resolution and order the relevant agencies
to the eligible dispute or delay, including an anticipated
delay, to act in accordance with that determination as soon
as practicable.
“(iv) Final resolution.—Notwithstanding any other
provision of law, any order given or action taken by the
Chairman in resolution of an eligible dispute or delay,
including an anticipated delay, under clause (iii)—
“(I) shall be final and conclusive;
“(II) shall not be subject to judicial review; and
“(III) shall, for purposes of judicial review of the
ultimate agency action and all other Federal law, constitute
full compliance with and satisfaction of any requirement for
interagency consultation, interagency coordination,
interagency concurrence, interagency authorization, or other
interagency procedural obligation under Federal law that is
the subject of the dispute or delay.”;
(B) in paragraph (2)—
(i) by inserting “applicable” before “deadline described
in paragraph (1)”;
(ii) by striking “in consultation with the applicant” and
inserting “with the approval of the project sponsor”; and
(iii) by striking “such environmental impact statement or
environmental assessment” and inserting “the applicable
environmental document”; and
(C) by striking paragraph (3) and inserting the following:
“(3) Failure to act.—
“(A) In general.—If, after 30 days have passed from the
date on which the Chairman determines that a key permitting
agency has not acted in accordance with a determination under
subparagraph (C)(iii) of paragraph (1) and causes a failure
to comply with a deadline in accordance with that paragraph
or an extended deadline in accordance with paragraph (2),
each relevant agency CERPO of the key permitting agency and
each career employee of the key permitting agency within the
Senior Executive Service (as defined in section 2101a of
title 5, United States Code) that has supervisory authority
over personnel in the key permitting agency and that has a
substantive role or responsibility in reviewing the
applicable environmental document or authorization that
remains unpublished or unissued, shall spend not less than 50
percent of the workweek, as determined pursuant to title 5,
United States Code, or other applicable law, to remedy the
failure.
“(B) No travel outside duty station.—
“(i) In general.—If, after 60 days have passed from the
date on which a deadline described in paragraph (1) or (2)
was failed to be met and the key permitting agency has not
published or made public the applicable environmental
document and has not issued all outstanding authorizations,
as described in those paragraphs, with respect to a proposed
agency action, the head of the relevant key permitting agency
shall not travel more than 25 miles from their official duty
station for the purposes of official business until the key
permitting agency has published or made public the applicable
environmental document and issued all outstanding
authorizations related to the proposed agency action that are
not in compliance with the requirements of this subsection.
“(ii) Corps of engineers.—For purposes of clause (i), the
Assistant Secretary of the Army for Civil Works shall be
considered to be the head of the Corps of Engineers.
“(C) Exception.—This paragraph shall not apply to the
Secretary of Defense.
“(4) Causes of action.—
“(A) Definition of court of competent jurisdiction.—In
this paragraph, the term `court of competent jurisdiction'
means—
“(i) if a court has jurisdiction over an applicable
proposed agency action pursuant to any other provision of
Federal law other than this Act, such court; or
“(ii) if no such court exists under clause (i)—
“(I) the district court of the United States for the
district in which a substantial part of the applicable
proposed agency action is situated; or
“(II) the United States District Court for the District of
Columbia.
“(B) Right to petition.—A project sponsor may obtain
judicial review of the compliance by a Federal agency with
the relevant deadline established under paragraph (1) or (2)
by filing a written petition in a court of competent
jurisdiction.
“(C) Exceptions.—The failure of a Federal agency to
publish in the Federal Register or make public an
environmental document or issue a decision on all necessary
authorizations shall not be considered failure to comply with
the deadlines established under paragraph (1) or (2) if the
Federal agency proves by clear and convincing evidence that
the failure was caused by—
“(i) a natural disaster, act of God, or act of war that
reasonably impaired the ability of the Federal agency to
comply with the relevant deadline established under paragraph
(1) or (2);
“(ii) a national emergency for which the only available
response is to delay the publication or making public the
environmental document or withhold decisions on the relevant
authorizations by the relevant deadline established under
paragraph (1) or (2);
“(iii) the publication or making public of the
environmental document or issuance of the authorization
violating the statutory obligations of the Federal agency;
“(iv) the completed application of the project sponsor
under section 110 being based on fraud or material
misrepresentations of fact;
“(v) the project sponsor withholding information necessary
to the ability of the Federal agency to comply with its
statutory obligations in publishing or making public an
environmental document or issuing a decision on all necessary
authorizations, after the Federal agency has made a
reasonable and timely request for such information; or
“(vi) a lapse in appropriations of more than 2 weeks
affecting 1 or more of the relevant agencies involved in the
preparation of the environmental documents or authorizations.
“(D) Remedy.—If a court of competent jurisdiction finds
that a Federal agency has failed to act in accordance with
this subsection, the court shall provide injunctive relief,
as appropriate, to give effect to this section and retain
jurisdiction to ensure compliance with any such relief.
“(E) Expedited procedures; time to decide.—The reviewing
court shall—
“(i) establish an expedited schedule for briefing and
disposition;
“(ii) issue a decision as expeditiously as practicable,
but not later than 120 days after the date on which the
petition is filed, absent extraordinary circumstances; and
“(iii) if the petition for relief is granted, issue an
order requiring a decision on the covered application not
later than 60 days after the date on which the order is
issued.”; and
(5) in subsection (h)—
(A) in paragraph (1)—
(i) in the matter preceding subparagraph (A), by striking
“the Committee on Natural Resources of the House of
Representatives and the Committee on Environment and Public
Works of the Senate” and inserting “the Chairman, not later
than April 15 of each year,”; and
(ii) by striking subparagraphs (A) and (B) and inserting
the following:
“(A) identifies each environmental document that was not
completed by each lead agency by the deadline described in
subsection (g) and provides an explanation for the failure to
meet the deadline;
“(B) identifies each environmental document the
preparation of which commenced before the date of enactment
of the Fiscal Responsibility Act of 2023 (Public Law 118-5;
137 Stat. 10) and is not yet complete at the time of the
report and provides an explanation for the failure to
complete the environmental document;
“(C) details the on-time completion rate of each key
permitting agency in adhering to applicable deadlines
described in subsection (g); and
“(D) details the progress of each key permitting agency in
adhering to those deadlines as compared to the completion
rate during the preceding year.”;
(B) in paragraph (2)—
(i) in subparagraph (A), by striking “such environmental
assessment and environmental impact statement” and inserting
“applicable environmental document”;
(ii) by striking subparagraph (B) and inserting the
following:
“(B) the earlier of—
“(i) with respect to an environmental assessment, as
applicable—
“(I) the date on which the lead agency determines that
section 106(b)(1)(A) requires the preparation of an
environmental assessment with respect to the proposed agency
action; and
“(II) the date on which the lead agency notifies the
project sponsor that the application for the proposed agency
action is complete; and
“(ii) with respect to an environmental impact statement,
as applicable—
“(I) the date on which the lead agency determines that
section 102(2)(C) requires the issuance of an environmental
impact statement with respect to the proposed agency action;
and
“(II) the date on which the lead agency notifies the
project sponsor that the application for the proposed agency
action is complete; and”; and
(iii) in subparagraph (C), by striking “environmental
assessment and environmental impact statement” and inserting
“environmental document”; and
(C) by adding at the end the following:
“(3) Compilation.—The Chairman shall—
“(A) compile the reports received by the heads of lead
agencies under paragraph (1) each year;
“(B) provide recommendations on how to improve the
performance of Federal agencies in adhering to the deadlines
described in subsection (g); and
“(C) submit that compilation of those reports and those
recommendations to the Committee on Environment and Public
Works of the Senate and Committee on Natural Resources of the
House of Representatives by not later than June 15 of the
applicable year.”.
SEC. 1107. PROGRAMMATIC ENVIRONMENTAL DOCUMENT.
Section 108 of the National Environmental Policy Act of
1969 (42 U.S.C. 4336b) is amended, in each of paragraphs (1)
and (2), by striking “5 years” and inserting “10 years”.
SEC. 1108. USE OF CATEGORICAL EXCLUSIONS BY OTHER AGENCIES.
Section 109 of the National Environmental Policy Act of
1969 (42 U.S.C. 4336c) is amended to read as follows:
“SEC. 109. USE OF CATEGORICAL EXCLUSIONS BY OTHER AGENCIES.
“(a) Agency Notification to Council.—
“(1) Available categorical exclusions.—Not later than 30
days after the date of enactment of the Bipartisan American
Affordability and Jobs Act of 2026, each Federal agency shall
submit to the Council a notification of all categorical
exclusions of the agency, specifying whether the categorical
exclusion was administratively created, established by
Congress, or adopted pursuant to subsection (c).
“(2) New categorical exclusions.—Not later than 7 days
after the date on which a Federal agency administratively
creates a categorical exclusion, a categorical exclusion
under the jurisdiction of the applicable Federal agency is
established by Congress, or the Federal agency adopts a
categorical exclusion of another Federal agency pursuant to
subsection (c), the Federal agency shall submit to the
Chairman a notification of the creation, establishment, or
adoption, as applicable, of that categorical exclusion.
“(b) Record of Categorical Exclusions.—The Council shall
maintain, on the website of the Council, an accurate and
publicly available record of each categorical exclusion
that—
“(1) is created by a Federal agency;
“(2) has been established by Congress; or
“(3) has been adopted by a Federal agency pursuant to
subsection (c).
“(c) Adoption of Categorical Exclusions by Other
Agencies.—
“(1) In general.—A Federal agency may adopt a categorical
exclusion of another Federal agency listed in the record
required under subsection (b) for which the categorical
exclusion was established consistent with this subsection.
“(2) Requirements.—In adopting a categorical exclusion
under paragraph (1), a Federal agency shall—
“(A) identify the categorical exclusion included on the
record described in subsection (b) that covers a category of
proposed agency actions or related actions;
“(B) consult with the Federal agency that established the
categorical exclusion or carries out a categorical exclusion
established by Congress to ensure that the proposed adoption
of the categorical exclusion to a category of proposed agency
actions is appropriate; and
“(C) publicly document adoption of the categorical
exclusion.”.
SEC. 1109. APPLICATIONS FOR AUTHORIZATIONS.
Section 110 of the National Environmental Policy Act of
1969 (42 U.S.C. 4336d) is amended to read as follows:
“SEC. 110. APPLICATIONS FOR AUTHORIZATIONS.
“(a) Application Sufficiency.—
“(1) Notification of complete or incomplete application.—
Unless a shorter deadline is specified by law, in connection
with a proposed agency action for which a project sponsor
submitted an application for an authorization to a Federal
agency, not later than 60 days after the date on which the
project sponsor submits the application, the Federal agency
shall—
“(A) document receipt of the application; and
“(B)(i) notify the project sponsor that the application is
complete; or
“(ii) notify the project sponsor that the application is
incomplete and request, in writing, any additional
information that the Federal agency needs to determine that
the application is complete.
“(2) Agency determination.—
“(A) Complete determination.—If a Federal agency
determines that an application is complete under paragraph
(1)(B)(i), the Federal agency shall, not later than 60 days
after the date on which the Federal agency makes that
determination, unless a shorter period is provided for by
law—
“(i) notify the project sponsor that the Federal agency
has determined that—
“(I) the proposed agency action—
“(aa) is excluded pursuant to a categorical exclusion; or
“(bb) is not a major Federal action; or
“(II) no further agency action is required;
“(ii) notify the project sponsor that the agency has
determined that preparation of an environmental assessment is
necessary; or
“(iii) issue a notice of intent to prepare an
environmental impact statement for the proposed agency
action.
“(B) Incomplete determination.—If a Federal agency
requests additional information under paragraph (1)(B)(ii),
the deadlines described in subparagraph (A) shall be based on
the date on which the Federal agency receives the additional
information instead of the date on which the determination is
made.
“(3) Applicability to other law.—If a law provides for a
shorter period with respect to a determination by a Federal
agency that an application submitted by a project sponsor to
the Federal agency is complete—
“(A) nothing in this Act supersedes such shorter period;
and
“(B) the Federal agency shall commence its reviews under
sections 106 and 107 and paragraph (2)(A) on receipt of a
notice of staking or similar pre-permit submission
notification.
“(b) Additional Application Information.—Unless otherwise
required by law, in addition to any information required by a
Federal agency for an application for authorization for a
proposed agency action requiring the preparation of an
environmental document, a project sponsor shall submit to the
applicable Federal agency—
“(1) a list of each known Federal, State, Tribal, or local
authorization required to complete the proposed agency
action;
“(2) a record of stakeholder engagement for the proposed
agency action as of the date of the application; and
“(3) a brief description of a statement of purpose and
need for the proposed agency action, including, to the extent
practicable, the location of the project and any known
alternatives.”.
SEC. 1110. JUDICIAL REVIEW.
Title I of the National Environmental Policy Act of 1969
(as amended by section 1102(b)(1)) is amended by inserting
after section 110 (42 U.S.C. 4336d) the following:
“SEC. 111. JUDICIAL REVIEW.
“(a) Definition of Claim.—In this section, the term
`claim' means a claim that—
“(1) is filed on or after the date of enactment of the
Bipartisan American Affordability and Jobs Act of 2026; and
“(2) seeks judicial review under any provision of Federal
law of an authorization based on a claim that an
environmental review failed to be properly conducted pursuant
to the requirements of this Act.
“(b) Limitations on Claims.—Notwithstanding any other
provision of law, a claim shall be barred unless the claim—
“(1) is filed not later than 150 days after the date on
which, unless a shorter deadline is specified under Federal
law—
“(A) in the case of a claim in which an environmental
impact statement was prepared, the applicable authorization
was published in the Federal Register; and
“(B) in the case of any other claim, the authorization was
made public;
“(2) in the case of an environmental document for which an
opportunity for comment was provided, and for which the
opportunity for public comment occurs after the date of
enactment of the Bipartisan American Affordability and Jobs
Act of 2026, the claim is filed by a party that submitted a
substantive comment during a public comment period associated
with that environmental document, with such comment being