SA 6961. Mr. HEINRICH (for Mr. King) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
At the end of subtitle B of title II of division B of the
amendment, add the following:
SEC. 2216. TEMPORARY EXPEDITED AUTHORIZATIONS FOR LOW-
CONFLICT WIND ENERGY PROJECTS ON PRIVATE LAND.
(a) Definitions.—In this section:
(1) Administrator.—The term “Administrator” means the
Administrator of the Federal Aviation Administration.
(2) Aircraft detection lighting system.—The term
“aircraft detection lighting system” means a sensor-based
system that activates obstruction lighting only when an
aircraft is detected nearby, as described in Federal Aviation
Administration Advisory Circular 70/7460-1.
(3) Application.—The term “application” includes a
notice, preconstruction notification, request, and any other
submission provided by a project sponsor to a Federal agency
for the purpose of obtaining from the agency a covered
authorization.
(4) Bird and bat conservation strategy.—The term “bird
and bat conservation strategy” means a project-specific
strategy to avoid, minimize, and compensate for impacts to
birds and bats, as described in the Land-Based Wind Energy
Guidelines.
(5) Covered authorization.—
(A) In general.—The term “covered authorization” means
an authorization, determination, approval, verification,
concurrence, or permit described in any of paragraphs (1)
through (4) of subsection (e).
(B) Exclusion.—The term “covered authorization” does not
include a general permit described in subsection (e)(5).
(6) Director.—The term “Director” means the Director of
the United States Fish and Wildlife Service.
(7) Eligible project.—The term “eligible project” means
a wind energy project that meets the applicable criteria
described in subsection (c).
(8) Federal authorization or permit.—The term “Federal
authorization or permit” has the meaning given the term in
section 1401(a).
(9) Habitat conservation plan.—The term “habitat
conservation plan” means a conservation plan described in
section 10(a)(2)(A) of the Endangered Species Act of 1973 (16
U.S.C. 1539(a)(2)(A)).
(10) IPaC species screening.—The term “IPaC species
screening” means a screening for a listed species or a
designated critical habitat using the Information for
Planning and Consultation system of the United States Fish
and Wildlife Service (or any successor system).
(11) Land-based wind energy guidelines.—The term “Land-
Based Wind Energy Guidelines” means the voluntary Land-Based
Wind Energy Guidelines issued by the United States Fish and
Wildlife Service in March 2012 (as in effect on the date of
enactment of this Act).
(12) Listed.—The term “listed”, with respect to a
species of animals or plants, means that the species is
listed as an endangered species or a threatened species under
section 4 of the Endangered Species Act of 1973 (16 U.S.C.
1533).
(13) Local field office.—The term “local field office”,
with respect to a project, means the field office of the
United States Fish and Wildlife Service with jurisdiction
over the area in which the project is located.
(14) Nationwide permit.—The term “nationwide permit”
means a general permit issued on a nationwide basis under
section 404(e) of the Federal Water Pollution Control Act (33
U.S.C. 1344(e)).
(15) Project sponsor.—The term “project sponsor” means
an entity, including any private, public, or public-private
entity, seeking an authorization for a wind energy project.
(16) Remedy.—The term “remedy” means a result described
in subsection (e) that applies in a case in which a Federal
agency fails to provide a response by the applicable deadline
under this section.
(17) Single and complete project; special aquatic sites.—
The terms “single and complete project” and “special
aquatic sites” have the meanings given those terms in
section 330.2 of title 33, Code of Federal Regulations (or a
successor regulation).
(18) Standard conservation measure.—The term “standard
conservation measure” means any measure described in
subsection (g)(4), including any applicable supplement to
such a measure under subsection (h).
(19) Standard crossing design.—The term “standard
crossing design” means a water crossing design described in
subsection (c)(2)(C).
(20) Standard marking and lighting.—The term “standard
marking and lighting” means full obstruction marking and
lighting in accordance with Federal Aviation Administration
Advisory Circular 70/7460-1.
(21) Wind energy project.—The term “wind energy project”
means a land-based wind energy generation facility on
privately owned land, including any new construction,
repowering, or expansion of such a facility, and any
associated facilities, on privately owned land.
(b) Requirement to Act.—
(1) In general.—A Federal agency shall act on a complete
application for a covered authorization for an eligible
project by the applicable deadline under subsection (e).
(2) Failure to act.—Except as otherwise expressly provided
in this section, if a Federal agency fails to issue a timely,
reasoned written determination with respect to a complete
application for a covered authorization in accordance with
paragraph (1), the applicable remedy shall take effect,
without further agency action, on receipt by the agency of
notice under subsection (g)(1)(A)(i).
(3) No regulations.—No regulations shall be required to
implement this section.
(4) Effect.—Nothing in this section authorizes any project
or activity requiring an approval not covered by this
section.
(c) Eligible Project Criteria.—A wind energy project shall
be considered to be an eligible project if the project
sponsor certifies that the wind energy project meets each of
the following criteria:
(1) Land and siting.—
(A) Facilities and roads.—All turbines, substations,
operations and maintenance facilities, and access roads are
located entirely on privately owned land.
(B) No federal interest.—The wind energy project involves
no Federal land, Federal mineral estate, Federal funding, or
Federal right-of-way.
(C) Federal nexus.—The only Federal nexuses of the wind
energy project are 1 or more of the following:
(i) Review by the Federal Aviation Administration under
section 44718 of title 49, United States Code, including any
necessary—
(I) coordination with the Department of Defense under
section 183a of title 10, United States Code; and
(II) authorization by the Federal Communications
Commission.
(ii) Discrete crossings of waters of the United States by a
road, collection line, or transmission line requiring
authorization under section 404 of the Federal Water
Pollution Control Act (33 U.S.C. 1344).
(iii) Consultation under section 7, or authorization under
section 10, of the Endangered Species Act of 1973 (16 U.S.C.
1536, 1539) arising from—
(I) a crossing described in clause (ii); or
(II) construction or operation of the wind energy project.
(iv) Registration for, or renewal of, a general permit for
incidental take of eagles under section 22.250 of title 50,
Code of Federal Regulations (as in effect on the date of
enactment of this Act), solely as provided in subsection
(e)(5).
(D) Protected areas.—No component of the wind energy
project is located within a unit of the National Wildlife
Refuge System, a designated critical habitat, a component of
the National Wild and Scenic Rivers System, or a unit of the
National Park System, or on land held in trust by the United
States for the benefit of an Indian Tribe.
(E) Surveys and studies.—The project sponsor has completed
the site-specific avian use and species surveys and studies
recommended in the Land-Based Wind Energy Guidelines, except
for any such study that is inapplicable to the wind energy
project, as determined by a qualified wildlife professional
based on site-specific conditions, with a supporting
explanation included in the application for the covered
authorization.
(F) Participation.—
(i) In general.—The project sponsor has provided to each
relevant unit of local government, affected community, and
landowner—
(I) written notice of the proposed wind energy project; and
(II) a reasonable opportunity to provide input regarding
the wind energy project.
(ii) Failure to respond.—A failure by a recipient to
respond to a written notice under clause (i) shall not—
(I) affect the eligibility of the applicable wind energy
project; or
(II) delay any remedy with respect to the wind energy
project.
(2) Waters.—
(A) Nationwide permit.—Each single and complete project
crossing waters of the United States qualifies for a
nationwide permit, including with respect to applicable
acreage and linear-foot limitations.
(B) Effect on special aquatic sites and navigable waters.—
The wind energy project does not affect any special aquatic
sites or any navigable waters for which an individual permit
under section 10 of the Act of March 3, 1899 (commonly known
as the “Rivers and Harbors Act of 1899”) (30 Stat. 1151,
chapter 425; 33 U.S.C. 403), would be required.
(C) Standard crossing design.—Each water crossing of the
wind energy project uses a standard crossing design,
including bottomless culverts or bridges for roads and
horizontal directional drilling or boring for collection and
transmission lines, where feasible.
(3) Species.—
(A) Screening.—The wind energy project has completed an
IPaC species screening.
(B) Effect.—Either—
(i) no listed species or designated critical habitat is
present at any crossing of the wind energy project; or
(ii) the project sponsor commits to implement the standard
conservation measures for each listed species present at such
a crossing, including seasonal work windows, buffers, erosion
and sediment controls, and any applicable compensatory
mitigation requirements.
(C) Bird and bat conservation strategies and monitoring.—
The project sponsor—
(i) has prepared or will prepare a bird and bat
conservation strategy; and
(ii) will conduct not less than 1 year of post-construction
monitoring, in accordance with the Land-Based Wind Energy
Guidelines.
(4) Aviation.—
(A) Exclusion areas.—
(i) In general.—No turbine of the wind energy project is
or will be located within an airport or military-airspace
exclusion area in which construction is expressly prohibited
by Federal law in effect on the date of enactment of this
Act, including any applicable airport-protection surface or
exclusion area established under Federal aviation law.
(ii) Identification.—The project sponsor identifies any
applicable airport or military-airspace siting restriction in
the notice submitted with respect to the wind energy project
under part 77 of title 14, Code of Federal Regulations (or
successor regulations).
(iii) Proximity.—For purposes of this subsection,
proximity to an airport, military training route, or airspace
designated under part 73 of title 14, Code of Federal
Regulations (or successor regulations), without an applicable
prohibition on construction shall not make a wind energy
project ineligible.
(iv) Effect.—Nothing in this subparagraph constitutes a
determination under section 44718 of title 49, United States
Code.
(B) Marking and lighting.—The project sponsor commits to
comply with the applicable requirements of subsection (g)(2).
(5) Process.—
(A) Historic properties.—A cultural resources screening
identifies no historic property listed or eligible for
listing in the National Register of Historic Places within
the area of potential effects of any Department of the Army
authorization sought for the wind energy project, or a
responsible Federal agency has completed consultation under
section 306108 of title 54, United States Code, with respect
to each affected historic property.
(B) Attestation.—The project sponsor—
(i) certifies the truthfulness of each submission under
this section;
(ii) executes an enforceable compliance undertaking
document; and
(iii) documents compliance with any applicable
decommissioning or mitigation financial assurance
requirements, including any financial assurances required
under an applicable habitat conservation plan.
(C) Approvals.—
(i) In general.—The project sponsor obtains all applicable
State and local approvals before carrying out any activity
for which such an approval is required.
(ii) Phases.—An approval described in clause (i) for a
subsequent phase of a wind energy project shall not be
required in order to obtain a remedy for an earlier phase of
the wind energy project.
(d) Authorizations.—
(1) In general.—A project sponsor may seek only such
covered authorizations for an eligible project as are
required to carry out the eligible project.
(2) Limitations.—
(A) Secretary of the army.—No authorization from the
Secretary of the Army shall be required with respect to an
eligible project unless the eligible project involves 1 or
more activities subject to—
(i) section 404 of the Federal Water Pollution Control Act
(33 U.S.C. 1344); or
(ii) section 10 of the Act of March 3, 1899 (commonly known
as the “Rivers and Harbors Act of 1899”) (30 Stat. 1151,
chapter 425; 33 U.S.C. 403).
(B) FAA and fcc.—No approval from the Administrator or the
Federal Communications Commission for an aircraft detection
lighting system shall be required with respect to an eligible
project unless the eligible project proposes to use an
aircraft detection lighting system.
(e) Review Periods and Remedies.—
(1) Federal aviation administration.—
(A) Determination of no hazard.—
(i) In general.—For each turbine and meteorological tower
of an eligible project, the Administrator shall issue a
determination under section 44718 of title 49, United States
Code, not later than 15 days after the earlier of—
(I) the date of receipt of a finding or notice of no
unacceptable risk under subparagraph (C); and
(II) the date of expiration of the applicable review period
under subparagraph (C), including any extension agreed to by
the project sponsor.
(ii) Failure to act.—If the Administrator fails to issue a
determination described in clause (i) by the applicable
deadline under that clause, unless the Secretary of Defense
has issued a timely finding of unacceptable risk under
subparagraph (C), the applicable turbine or meteorological
tower—
(I) shall, on receipt by the Administrator of notice under
subsection (g)(1)(A)(i), be deemed to have received an
interim determination of no hazard; and
(II) may be constructed and operated with standard marking
and lighting, subject to other applicable law.
(iii) Subsequent adverse determinations.—
(I) In general.—Any subsequent adverse determination
relating to a turbine or meteorological tower described in
clause (i) shall—
(aa) apply prospectively; and
(bb) identify each specific hazard and practicable
mitigation measures.
(II) Limitations.—The Administrator—
(aa) shall provide a reasonable opportunity for compliance
with the mitigation measures described in subclause (I)(bb);
and
(bb) may not require removal or cessation of an existing
turbine or meteorological tower except as necessary to
address an imminent and specific danger to air navigation.
(iv) Effect.—Nothing in this subparagraph grants any
airspace authorization required under any other provision of
law (including regulations).
(B) Aircraft detection lighting systems.—
(i) In general.—The Administrator shall act on a complete
application for approval of an aircraft detection lighting
system not later than 90 days after the date of receipt of
the application, including any required coordination with the
Secretary of Defense.
(ii) Failure to act.—Failure by the Administrator to act
in accordance with clause (i) shall not—
(I) constitute approval of an aircraft detection lighting
system; or
(II) prevent construction or operation of an aircraft
detection lighting system with standard marking and lighting.
(C) Department of defense coordination.—Notwithstanding
provisions to the contrary in subsections (c)(1) and (e) of
section 183a of title 10, United States Code, and subsections
(f) and (g) of section 44718 of title 49, United States Code,
the following shall apply:
(i) Referral.—Not later than 5 days after the date on
which the Administrator receives from a project sponsor a
complete application for an eligible project, the
Administrator shall transmit to the Military Aviation and
Installation Assurance Siting Clearinghouse a copy of the
application, together with any supporting information
necessary for review by the Secretary of Defense under this
subparagraph.
(ii) Initial review.—Not later than 45 days after the date
on which the Administrator receives from a project sponsor a
complete application for an eligible project, the Secretary
of Defense shall notify the Administrator and the project
sponsor, in writing, that—
(I) the applicable eligible project presents no
unacceptable risk to national security;
(II) a specifically identified potential adverse impact of
the eligible project may be resolved through 1 or more
identified mitigation measures; or
(III) the Secretary of Defense has made a finding of
unacceptable risk with respect to the eligible project, in
accordance with section 183a(e) of title 10, United States
Code.
(iii) Mitigation.—
(I) Negotiation.—If the Secretary of Defense provides
notice under clause (ii)(II), the Secretary of Defense and
the project sponsor shall have not more than 45 additional
days to negotiate the mitigation measures described in that
clause, unless the project sponsor agrees in writing to an
extension.
(II) Execution and notice.—If mitigation is agreed to
under subclause (I), the Secretary of Defense shall—
(aa) execute the mitigation agreement; and
(bb) not later than 10 days after the date of execution,
transmit to the Administrator the resulting findings.
(III) Failure to resolve.—The Secretary of Defense may
issue a finding of unacceptable risk under section 183a(e) of
title 10, United States Code, with respect to an eligible
project during the applicable mitigation period under this
clause if an identified risk cannot be resolved through
mitigation.
(iv) Failure to act.—
(I) In general.—If the Secretary of Defense fails to
provide notice by the applicable deadline under clause (ii),
or fails to execute a mitigation agreement or issue a finding
of unacceptable risk by the applicable deadline under clause
(iii), the project sponsor may provide to the Secretary of
Defense a notice under subsection (g)(1)(A)(i).
(II) Effect of notice.—On receipt of a notice under
subclause (I)—
(aa) the Secretary of Defense shall be deemed to have made
a finding of no unacceptable risk for purposes of section
183a(e) of title 10, United States Code, and subsections (f)
and (g) of section 44718 of title 49, United States Code; and
(bb) the Administrator shall proceed without further action
required by the Secretary of Defense.
(III) Treatment.—A timely finding of unacceptable risk by
the Secretary of Defense pursuant to this subparagraph shall
not be deemed to be a finding of no unacceptable risk under
subclause (II)(aa).
(v) National security.—Nothing in this subparagraph—
(I) affects the implementation or effect of section
183a(e)(1)(B) of title 10, United States Code; or
(II) limits any action necessary to address a subsequently
identified imminent and specific threat to national security.
(2) Federal communications commission.—
(A) In general.—Not later than 60 days after the date of
receipt of a complete application for a radio authorization
or antenna structure registration or modification required
for an aircraft detection lighting system involved in an
eligible project, the Federal Communications Commission shall
approve or deny the authorization, registration, or
modification.
(B) Failure to act.—
(i) In general.—Subject to clause (ii), failure by the
Federal Communications Commission to act in accordance with
subparagraph (A) shall not—
(I) be considered to be approval by the Federal
Communications Commission; or
(II) waive an authorization otherwise required to be
obtained from the Federal Communications Commission for an
eligible project.
(ii) Limitation.—The absence of an authorization described
in subparagraph (A) shall not prevent or delay the
construction or operation of the applicable eligible project
using standard marking and lighting, subject to otherwise
applicable law.
(3) Department of the army.—
(A) Nationwide permit preconstruction notifications.—
(i) In general.—The Secretary of the Army, acting through
the Chief of Engineers (referred to in this paragraph as the
“Secretary”), shall issue a determination, in writing
(including conducting any required consultation), with
respect to a complete preconstruction notification under an
applicable nationwide permit not later than, as applicable—
(I) 45 days after the date of receipt of the notification;
or
(II) 60 days after the date of receipt of the notification
in any case in which consultation under section 7 of the
Endangered Species Act of 1973 (16 U.S.C. 1536) or section
306108 of title 54, United States Code, is required.
(ii) Failure to act.—Notwithstanding part 330 of title 33,
Code of Federal Regulations (or successor regulations), on a
failure by the Secretary to issue a determination in
accordance with clause (i) and receipt by the Secretary of
notice under subsection (g)(1)(A)(i), the verification that
is the subject of that determination shall be deemed to be
issued for any activity carried out in accordance with, as
applicable—
(I) a nationwide permit;
(II) any regional conditions; and
(III) subsection (g).
(iii) Endangered species act requirements.—Notwithstanding
section 330.4(f) of title 33, Code of Federal Regulations (or
a successor regulation), or a nationwide permit condition
requiring separate written confirmation of the Chief of
Engineers under section 7 of the Endangered Species Act of
1973 (16 U.S.C. 1536), work may proceed under a deemed
verification under clause (ii) if the requirements of section
7 of the Endangered Species Act of 1973 (16 U.S.C. 1536) are
satisfied in accordance with—
(I) subparagraph (A) or (B) of paragraph (4); or
(II) another applicable provision of law.
(iv) Other requirements.—
(I) Treatment.—A deemed verification under clause (ii)
shall not be considered to constitute—
(aa) a certification under section 401 of the Federal Water
Pollution Control Act (33 U.S.C. 1341); or
(bb) completion of consultation required under section
306108 of title 54, United States Code.
(II) Requirement.—A certification or consultation
requirement described in subclause (I) shall be independently
satisfied or waived under applicable law before any work
described in clause (iii) commences.
(B) Approved jurisdictional determinations.—
(i) In general.—The Secretary shall issue a verification
with respect to a complete application for an approved
jurisdictional determination relating to an eligible project
not later than 45 days after the date of receipt of the
application.
(ii) Failure to act.—On failure by the Secretary to issue
a verification described in clause (i) by the applicable
deadline under that clause and receipt by the Secretary of
notice under subsection (g)(1)(A)(i), a delineation described
in subsection (g)(3)(D) shall be deemed to be accepted for
purposes of the eligible project, without determining
jurisdiction over any other affected property.
(4) United states fish and wildlife service.—
(A) Informal consultation.—
(i) In general.—The Director shall issue a written
determination with respect to a complete application for
concurrence in a determination by a Federal agency under
section 7(a)(2) of the Endangered Species Act of 1973 (16
U.S.C. 1536(a)(2)) that an eligible
project is not likely to adversely affect a listed species or
designated critical habitat not later than 30 days after the
date of receipt of the application.
(ii) Failure to act.—On failure by the Director to issue a
written determination described in clause (i) by the
applicable deadline under that clause and receipt by the
Director of notice under subsection (g)(1)(A)(i)—
(I) concurrence of the Director shall be deemed to be
provided for purposes of section 7(a)(2) of the Endangered
Species Act of 1973 (16 U.S.C. 1536(a)(2)) solely for the
eligible project and effects of the eligible project
described in the request; but
(II) no incidental take not otherwise authorized by law
shall be considered to be authorized, subject to subsection
(g).
(B) Programmatic formal consultation.—
(i) In general.—The Director shall issue a written
determination with respect to a complete request to confirm
that a crossing of an eligible project meets the express
coverage criteria of an existing programmatic biological
opinion issued under section 7(b) of the Endangered Species
Act of 1973 (16 U.S.C. 1536(b)) not later than 60 days after
the date of receipt of the request.
(ii) Failure to act.—On failure by the Director to issue a
written determination described in clause (i) by the
applicable deadline under that clause and receipt by the
Director of notice under subsection (g)(1)(A)(i), coverage
shall be deemed to be confirmed by the Director only to the
extent that the applicable crossing meets the criteria
referred to in clause (i).
(iii) Incidental take statement.—Section 7(o)(2) of the
Endangered Species Act of 1973 (16 U.S.C. 1536(o)(2)) shall
apply only to a take involved in an eligible project that is
within the scope and limits, and subject to the terms, of an
existing incidental take statement.
(C) Incidental take permits for construction.—
(i) In general.—The Director shall issue a written
determination with respect to a complete application for a
permit under section 10(a)(1)(B) of the Endangered Species
Act of 1973 (16 U.S.C. 1539(a)(1)(B)) for a take incidental
to the construction of an eligible project not later than 180
days after the date of receipt of the application.
(ii) Failure to act.—On failure by the Director to issue a
written determination described in clause (i) by the
applicable deadline under that clause and receipt by the
Director of notice under subsection (g)(1)(A)(i), an
incidental take during the construction of the applicable
eligible project shall be authorized by operation of
subparagraph (E), solely within the limits, and subject to
the conditions, described in that subparagraph and subsection
(g).
(iii) Effect.—Nothing in this subparagraph authorizes
construction that requires an approval under any other
provision of law (including regulations).
(D) Incidental take permits for operations affecting listed
bats.—
(i) In general.—The Director shall issue a written
determination with respect to a complete application for a
permit under section 10(a)(1)(B) of the Endangered Species
Act of 1973 (16 U.S.C. 1539(a)(1)(B)) for a take of listed
bats incidental to the operation of an eligible project not
later than 180 days after the date of receipt of the
application.
(ii) Failure to act.—On failure by the Director to issue a
written determination described in clause (i) by the
applicable deadline under that clause and receipt by the
Director of notice under subsection (g)(1)(A)(i), an
incidental take of listed bats during the operation of the
applicable eligible project shall be authorized by operation
of subparagraph (E), solely within the limits, and subject to
the conditions, described in that subparagraph and subsection
(g).
(E) Statutory incidental take authorization.—
(i) Operation of law.—
(I) In general.—Notwithstanding paragraphs (1) and (2) of
section 10(a) of the Endangered Species Act of 1973 (16
U.S.C. 1539(a)), if the Director fails to issue a written
determination by an applicable deadline under subparagraph
(C) or (D), the incidental take described in the relevant
complete application and the accompanying habitat
conservation plan shall be considered to be authorized by
operation of this section on receipt by the Director of
notice under subsection (g)(1)(A)(i), without any further
agency action, finding, consultation, or approval.
(II) Effect.—An authorization under this clause shall have
the force and effect of a permit issued under section
10(a)(1)(B) of the Endangered Species Act of 1973 (16 U.S.C.
1539(a)(1)(B)).
(ii) Limitations.—An authorization under clause (i)—
(I) extends only to the applicable listed species,
activities, geographic area, term, and quantified incidental
take expressly identified in the complete application and
accompanying habitat conservation plan;
(II) is subject to all applicable avoidance, minimization,
mitigation, monitoring, reporting, funding, and other
enforceable conditions of that habitat conservation plan and
subsection (g); and
(III) does not authorize any take beyond the limits
described in subclause (I).
(iii) Complete applications.—
(I) In general.—To be eligible to be considered to be
complete under this subparagraph, an application shall
include a habitat conservation plan containing the
information described in subparagraph (A) of section 10(a)(2)
of the Endangered Species Act of 1973 (16 U.S.C. 1539(a)(2))
and evidence supporting each finding described in
subparagraph (B) of that section, including assurances of
adequate funding.
(II) Incompleteness.—A materially incomplete application
shall not qualify for an authorization under clause (i),
subject to the completeness procedures described in
subsection (f).
(iv) Public participation.—
(I) In general.—Not later than 30 days after the date of
receipt of a complete application, the Director shall—
(aa) publish the application and the accompanying habitat
conservation plan; and
(bb) provide not less than 30 days for written public
comment regarding that application and habitat conservation
plan.
(II) Action by project sponsor.—If the Director fails to
publish an application or habitat conservation plan by the
applicable deadline under subclause (I), the project sponsor
may publish the applicable materials and provide an
opportunity for comment through a publicly accessible website
and submission to the Director of relevant notice.
(III) Response.—A project sponsor shall submit to the
Director a response to any material comments under this
clause before the applicable authorization takes effect.
(IV) No extension.—Failure by the Director to publish,
review, or respond to any comments under this clause shall
not extend the 180-day period described in subparagraph
(C)(i) or (D)(i), as applicable.
(V) Requirement.—An authorization under clause (i) may not
take effect until—
(aa) the applicable comment period under this clause
concludes; and
(bb) the project sponsor submits a response to those
comments under subclause (III).
(v) Environmental review and consultation.—
(I) In general.—An authorization under clause (i)—
(aa) shall be conferred directly by this section; and
(bb) notwithstanding the National Environmental Policy Act
of 1969 (42 U.S.C. 4321 et seq.) and section 7 of the
Endangered Species Act of 1973 (16 U.S.C. 1536), shall not
require an environmental assessment, environmental impact
statement, finding of no significant impact, record of
decision, biological opinion, or further consultation as a
condition of validity or effectiveness.
(II) Application.—This clause—
(aa) applies solely to a statutory incidental take
authorization under clause (i); and
(bb) does not exempt any Federal agency action or
authorization from any otherwise applicable requirement.
(vi) Enforcement.—
(I) In general.—The Director may enforce the terms, take
limits, and conditions of an authorization under clause (i)
to the same extent as if the authorization were a permit
issued under section 10(a)(1)(B) of the Endangered Species
Act of 1973 (16 U.S.C. 1539(a)(1)(B)), subject to subsection
(g)(1)(D).
(II) Treatment.—No subsequent agency documentation or
acknowledgment shall be required to establish an
authorization under clause (i).
(5) Eagle general permits.—
(A) In general.—An eligible project that satisfies the
eligibility criteria for a general permit for incidental take
of eagles associated with wind energy operations under
sections 22.210 and 22.250 of title 50, Code of Federal
Regulations (as in effect on the date of enactment of this
Act), shall remain eligible to register for and renew such a
permit, notwithstanding any subsequent change in those
eligibility criteria or a general suspension of new
registrations under section 22.210(e) of that title (as so in
effect), if the eligible project continues to satisfy the
criteria in effect on that date of enactment.
(B) Requirements.—The registration, issuance, renewal, and
compliance of an eligible project described in subparagraph
(A) shall remain subject to the general-permit requirements
in effect on the date of enactment of this Act, including
with respect to certifications, fees, conditions, and
enforcement.
(C) Effect.—Nothing in this paragraph—
(i) authorizes an eagle take; or
(ii) requires an eligible project to seek an eagle take
permit.
(f) Complete Applications and Review Periods.—
(1) Commencement of review period.—
(A) In general.—Except as provided in subsection (e)(1),
for any determination or coordination with the Secretary of
Defense required under subsection (e), each applicable review
period under that subsection shall be considered to begin on
the date on which the applicable Federal agency receives a
complete application for a covered authorization for an
eligible project.
(B) Determinations of no hazard.—The 15-day period
described in clause (i) of subsection (e)(1)(A) shall be
considered to begin on the applicable date described in
subclause (I) or (II) of that clause, without regard to the
date on which notice under subsection (g)(1)(A)(i) is
provided.
(2) Completeness of applications.—
(A) In general.—An application shall be considered to be
complete for purposes of this subsection if the application
contains the information required under the publicly
available requirements of the applicable agency, as in effect
on the date of enactment of this Act.
(B) Notice of deficiency.—
(i) In general.—Not later than 15 days after the date of
receipt of a complete application, an agency may issue 1
written notice identifying any specific missing information
reasonably necessary with respect to the covered
authorization that is the subject of the application.
(ii) Completeness.—An application described in clause (i)
shall be—
(I) absent a notice under that clause, deemed to be
complete on the date of submission; or
(II) if a notice under that clause is issued by an agency,
complete on submission to the agency of the information
identified in the notice.
(C) Agency obligations.—An agency—
(i) may not extend a review period under this section
through—
(I) successive requests for information under subparagraph
(B)(i); or
(II) requests for information beyond the applicable
requirements published by the agency; and
(ii) shall bear the burden of identifying, in a timely
written notice under subparagraph (B)(i), any deficiency in
an application.
(3) Treatment of certain agency actions.—
(A) In general.—A request by an agency for additional
information, a referral by an agency, or provision by an
agency of a notice that review remains pending shall not be
considered to be a determination by the agency for purposes
of this section.
(B) Adverse determinations.—
(i) In general.—A written denial or adverse determination
issued by an agency by an applicable deadline under this
section shall identify—
(I) the statutory or regulatory grounds for the denial or
determination;
(II) the material facts supporting those grounds; and
(III) where legally available, specific measures that would
permit approval by the agency.
(ii) Treatment.—A denial by an agency under this section—
(I) shall not be deemed to be an approval; and
(II) remains subject to otherwise applicable administrative
and judicial review.
(4) Conditions required.—A remedy shall apply with respect
to an eligible project only if the eligible project complies
with the applicable conditions described in subsection (g).
(g) Conditions for Remedies.—To receive a remedy under
this subsection, an eligible project shall comply with the
following conditions, as applicable:
(1) All federal agencies.—
(A) Notice and effect of failure to act.—
(i) In general.—If a Federal agency fails to issue a
written determination by an applicable deadline under
subsection (e), the project sponsor may submit to the office
of the agency that is designated to receive covered
authorization applications a written notice of the missed
deadline, including by electronic submission.
(ii) Remedy.—On receipt of a notice under clause (i), the
applicable remedy described in subsection (e) shall take
effect by operation of law, without further agency action,
determination, acknowledgment, or approval, subject to the
conditions and limitations of this section.
(iii) Prohibition.—An agency may not delay or withhold a
remedy by declining to receive or acknowledge a notice under
clause (i).
(iv) Effect of certain actions.—A request for additional
information, referral, or notice of continuing review by an
agency shall not—
(I) extend a deadline under this section; or
(II) prevent a remedy from taking effect.
(B) Build as filed.—
(i) In general.—A remedy shall be provided for an eligible
project activity only to the extent that the activity is
described in an application for a covered authorization under
this section.
(ii) Material changes.—A material change affecting the
eligibility or environmental effects of an eligible project
shall—
(I) require the submission of an updated application; and
(II) cause the review period for the applicable covered
authorization to recommence.
(C) Conditions.—The eligible project shall comply with—
(i) the applicable conservation measures described in
paragraph (4); and
(ii) for any activity requiring a nationwide permit, the
applicable general and regional conditions of the nationwide
permit, including conditions relating to any certification
under section 401 of the Federal Water Pollution Control Act
(33 U.S.C. 1341), in effect on the date of submission of an
application for a covered authorization for the eligible
project.
(D) Oversight.—
(i) In general.—An agency may inspect and prospectively
suspend or revoke a remedy for a documented material
violation or newly discovered material fact affecting the
eligibility of an eligible project, subject to the condition
that the agency shall provide to the project sponsor—
(I) a written notice identifying the grounds for the
suspension or revocation; and
(II) a reasonable opportunity to cure, to the extent
practicable.
(ii) Immediate action.—Notwithstanding clause (i), an
agency may take immediate action pursuant to that clause in
order to prevent imminent harm to human safety or a listed
species.
(iii) Limitations.—A suspension under this subparagraph—
(I) shall be limited to the applicable activity; and
(II) shall not be broader than necessary.
(iv) Effect.—Agency oversight under this subparagraph
shall not extend, or reestablish the availability of, a
remedy solely because the agency failed to act by an
applicable deadline under this section.
(E) Records.—The project sponsor shall—
(i) maintain a record of all filings, notices, and
compliance records under this section; and
(ii) make those items available to a Federal agency on
request.
(2) FAA and fcc.—
(A) Standard marking and lighting.—
(i) In general.—The eligible project shall use standard
marking and lighting until—
(I) the applicable aircraft detection lighting system is
approved by the Administrator;
(II) all Federal Communications Commission authorizations
required for the operation of the aircraft detection lighting
system are obtained; and
(III) the aircraft detection lighting system commences
operation.
(ii) Prohibition.—An eligible project may not operate an
aircraft detection lighting system before each approval and
authorization described in clause (i) is obtained.
(B) Notice of construction.—The project sponsor shall file
each notice of construction required by the Administrator
with respect to an applicable aircraft detection lighting
system.
(3) Department of the army.—
(A) Nationwide permits.—All work on an eligible project
shall remain within the terms, including acreage and linear-
foot limitations, of the applicable nationwide permit.
(B) Crossing designs; erosion and sediment controls.—The
eligible project shall use standard crossing designs and
erosion and sediment controls.
(C) Special aquatic sites.—No work on an eligible project
shall occur in special aquatic sites.
(D) Delineations.—A delineation submitted with a request
for an approved jurisdictional determination under this
section shall be prepared—
(i) in accordance with the 1987 Corps of Engineers Wetlands
Delineation Manual and any applicable regional supplement to
that manual;
(ii) by a qualified professional wetland scientist; and
(iii) with the field survey completed within the
appropriate season.
(4) United states fish and wildlife service.—
(A) Conservation measures.—
(i) In general.—The eligible project shall implement the
standard conservation measures, including avoidance, seasonal
work windows, buffers, and trenchless methods, at all
crossings.
(ii) Additional measures.—In addition to the standard
conservation measures, an eligible project relying on a
remedy under subparagraph (C)(ii) or (D)(ii) of subsection
(e)(4) shall implement the measures included in the
applicable habitat conservation plan.
(B) Listed bats.—If listed bats may be present onsite of
an eligible project, the eligible project—
(i) shall limit tree removal to the minimum required for
construction, and mark clearing limits in the field before
clearing;
(ii)(I) shall avoid tree removal in suitable habitat during
the pup season (May 1 through July 31), or during such other
dates as the local field office may establish; and
(II) if avoidance described in subclause (I) is not
possible, shall—
(aa) conduct visual emergence surveys of trees 9 inches or
more in diameter at breast height; and
(bb) delay removal of such trees if listed bats are
observed;
(iii) shall not remove any documented roost tree, or any
tree located within 150 feet of a documented maternity roost;
(iv) shall schedule bridge and culvert work—
(I) outside the pup season described in clause (ii)(I); and
(II) during the winter season, when listed bats are known
to use a structure, as established in cooperation with the
local field office;
(v) shall use downward-facing, full cut-off lighting, and
direct temporary lighting away from suitable habitat, except
for lighting required under paragraph (2);
(vi) shall ensure that fueling and other spill-risk
activities are conducted not less than 300 feet from any
caves, sinkholes, losing streams, and springs in karst areas;
and
(vii) during nighttime hours in the autumn migration season
specified in the bird and bat conservation strategy or
habitat conservation plan submitted with a complete
application, when ambient temperature exceeds 50 degrees
Fahrenheit, shall feather turbine blades so that rotor speed
does not exceed 3 revolutions per minute at wind speeds below
the cut-in speed, which shall be not less than 3, and not
more than 4, meters per second, as specified in the bird and
bat conservation strategy or habitat conservation plan,
subject to the conditions that—
(I) the specified season and cut-in speed shall apply
without further approval by the local field office under this
section;
(II) a facility operating on the date of enactment of this
Act shall implement this clause to the extent feasible; and
(III) any more-protective condition contained in an
applicable habitat conservation plan shall control.
(C) Listed plants.—If a listed plant may be present onsite
of an eligible project, the eligible project shall—
(i) mark listed plant areas and maintain a 50-foot buffer
from those areas;
(ii) avoid ground disturbance, vegetation removal, and
hydrologic changes in suitable listed plant habitat; and
(iii) clean equipment before entering the eligible project
site.
(D) Other listed species.—
(i) In general.—For any other listed species identified in
an IPaC species screening, the project sponsor shall
implement applicable species-specific conservation measures
published as of the date of enactment of this Act or
established in an applicable conservation strategy or habitat
conservation plan submitted with the applicable complete
application.
(ii) Deemed authorizations.—A deemed take authorization
under subparagraph (C)(ii) or (D)(ii) of subsection (e)(4)
shall extend to a listed species described in clause (i) only
to the extent that the habitat conservation plan submitted
with the applicable complete application—
(I) specifies measures in accordance with section
10(a)(2)(A) of the Endangered Species Act of 1973 (16 U.S.C.
1539(a)(2)(A)); and
(II) expressly identifies the listed species and any
authorized take of that species.
(iii) Treatment.—No additional approval by a local field
office or subsequent publication of any measure shall be
required solely to invoke a remedy under this section.
(E) Monitoring.—The eligible project shall complete not
less than 1 year of post-construction monitoring in
accordance with the Land-Based Wind Energy Guidelines.
(F) Stop work.—
(i) In general.—If a listed species is encountered during
construction of the eligible project in circumstances not
addressed by the applicable conservation measures or habitat
conservation plan—
(I) the project sponsor shall—
(aa) suspend work only at the affected location;
(bb) notify the United States Fish and Wildlife Service of
the encounter; and
(cc) implement applicable avoidance measures;
(II) any activities unaffected by the encounter may
continue; and
(III) an activity affected by the encounter may resume when
the activity can proceed in compliance with the applicable
covered authorization and conservation measures.
(ii) Effect.—Nothing in this subparagraph authorizes an
otherwise prohibited take.
(5) Eagle general permits.—
(A) In general.—An eligible project relying on a general
permit described in subsection (e)(5) shall comply with the
applicable conditions of that permit, including avoidance,
minimization, monitoring, reporting, and compensatory
mitigation.
(B) Effect.—Nothing in this section authorizes—
(i) an eagle nest take; or
(ii) any activity outside the scope of an applicable permit
described in subparagraph (A).
(h) Standard Conditions.—
(1) In general.—Not later than 90 days after the date of
enactment of this Act, the Administrator, the Secretary of
the Army, and the Director shall publish standard conditions
for purposes of implementing subsection (g).
(2) Scope.—A publication under paragraph (1)—
(A) may clarify any applicable eligibility criteria; but
(B) may not—
(i) add any applicable eligibility criterion;
(ii) impose any substantive obligation beyond the
obligations described in subsection (g); or
(iii) delay, or impose a condition on, an available remedy.
(3) Failure to publish.—A failure by the Administrator,
the Secretary of the Army, or the Director to publish
standard conditions under paragraph (1) shall not affect any
deadline or remedy under this section.
(4) Rulemaking not required.—A rulemaking under section
553 of title 5, United States Code, shall not be required for
a publication under this subsection.
(i) Relationship to Section 1401.—
(1) In general.—An authorization arising by operation of
law under subsection (e)(4)(E), and any other covered
authorization deemed to be effective under subsection (e),
shall be treated as a Federal authorization or permit for
purposes of section 1401 to the extent necessary for the
applicable activity.
(2) Effect.—Nothing in this subsection establishes that a
project has secured all other Federal authorizations and
permits necessary for construction or operation.
(j) Savings Provisions.—Nothing in this section—
(1) except as provided in subsection (e)(4), authorizes any
take prohibited under the Endangered Species Act of 1973 (16
U.S.C. 1531 et seq.);
(2) authorizes any take of bald or golden eagles without a
valid permit, or otherwise waives any requirement of the Act
of June 8, 1940 (commonly known as the “Bald and Golden
Eagle Protection Act”) (16 U.S.C. 668 et seq.), except for
the preservation of general permit eligibility expressly
provided in subsection (e)(5);
(3) waives any applicable requirement under section 401 of
the Federal Water Pollution Control Act (33 U.S.C. 1341) or
section 307(c)(3)(A) of the Coastal Zone Management Act of
1972 (16 U.S.C. 1456(c)(3)(A));
(4) except as expressly provided in subsection (e)(1)(C),
affects review under section 183a of title 10, United States
Code;
(5) affects any applicable State, local, or Tribal
requirement or any reserved Tribal right;
(6) affects any existing Federal authorization or permit or
precludes a Federal authorization or permit in effect under
otherwise applicable law; or
(7) except as expressly provided in subsection
(e)(4)(E)(v), affects the application of the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or
section 7 of the Endangered Species Act of 1973 (16 U.S.C.
1536) to a Federal agency action.
(k) Application Window.—
(1) In general.—This section applies to any covered
authorization for which a complete application is received
during the 3-year period beginning on the date of enactment
of this Act.
(2) Effect of expiration.—If a review period with respect
to a covered authorization that commences during the period
described in paragraph (1) expires after the end of that
period, each applicable remedy shall remain available and
effective for the authorized activity and duration, subject
to subsection (g).