SA 6996. Ms. DUCKWORTH (for herself and Mr. Grassley) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Starting on page 238 of the amendment, line 7, strike all
that follows through page 269, line 9, and insert the
following:
(1) in the matter preceding paragraph (1), by striking
“Except” and all that follows through “finds that” and
inserting “Except as provided in subsections (d)(1) and (i),
the Commission shall, after notice and an opportunity for
hearing, including a public comment period of at least 90
days, issue one or more permits to individual or joint
applicants for the construction or modification of electric
transmission facilities necessary in the national interest if
the Commission finds that”;
(2) in paragraph (1)—
(A) in subparagraph (A)(i), by inserting “or
modification” after “siting”; and
(B) in subparagraph (C)—
(i) in the matter preceding clause (i), by inserting “or
modification” after “siting”; and
(ii) in clause (i), by striking “the later of” in the
matter preceding subclause (I) and all that follows through
the semicolon at the end of subclause (II) and inserting
“the date on which the application was filed with the State
commission or other entity;”; and
(3) by striking paragraphs (2) through (6) and inserting
the following:
“(2) the proposed facilities will be used for the
transmission of electric energy in interstate or foreign
commerce;
“(3) the proposed construction or modification is
consistent with the public interest;
“(4) the proposed construction or modification will
protect or benefit consumers, provide improved reliability,
and facilitate just and reasonable rates;
“(5) the electric transmission facilities—
“(A) are—
“(i) capable of transmitting electric energy at a voltage
of not less than 230 kilovolts; or
“(ii) necessary to safely and reliably interconnect 1 or
more facilities described in clause (i) for which the permit
is provided; or
“(B) in the case of facilities that include advanced
transmission conductors (including superconductors), as
defined by the Commission, are capable of transmitting
electric energy at voltages determined to be appropriate by
the Commission for facilities of a comparable throughput
specifically with respect to an application for an individual
project under this section;
“(6) if applicable, the proposed modification (including
reconductoring) will maximize, to the extent reasonable and
economical, the transmission capabilities of existing towers,
structures, or rights-of-way; and
“(7) if applicable, and to the maximum extent practicable
and reasonable, the proposed construction will be sited—
“(A) near and parallel to roads, the rights-of-way of
railways, or along division lines of lands, according to a
government survey;
“(B) so as not to interfere with the use by the public of
highways or streams; and
“(C) so as not to unnecessarily interfere with the use of
any land by the affected landowner.”.
(c) State Siting and Consultation.—Section 216 of the
Federal Power Act (16 U.S.C. 824p) is amended by striking
subsection (d) and inserting the following:
“(d) State Siting and Consultation.—
“(1) Preservation of state siting authority.—The
Commission shall have no authority to issue a permit under
subsection (b) for the construction or modification of an
electric transmission facility within a State except as
provided in paragraph (1) of that subsection.
“(2) Consultation.—In any proceeding before the
Commission under subsection (b), the Commission shall afford
each State in which a transmission facility covered by the
permit is or will be located, each affected Federal agency
and Indian Tribe, private property owners, and other
interested persons, a reasonable opportunity to present their
views and recommendations with respect to the need for and
impact of a facility covered by the permit.
“(3) Landowner input.—In authorizing the construction or
modification of an electric transmission facility under
subsection (b), the Commission shall take into account
landowner input.
“(4) State record.—In any proceeding before the
Commission under subsection (b), each State in which a
transmission facility covered by the permit is or will be
located may file with the Commission, and the Commission
shall consider, any part of the State record, if applicable,
that the State finds to be relevant to the determination of
the Commission.
“(5) Pre-filing processes.—Any Commission-related pre-
filing processes relating to an application submitted under
subsection (c) may commence before, but shall commence no
later than, an application is submitted to the applicable
State commission or other entity that has authority to
approve the siting of the applicable facility.”.
(d) Rights-of-Way.—Section 216(e) of the Federal Power Act
(16 U.S.C. 824p(e)) is amended by striking “or a State” in
paragraph (1) and by striking “shall conform as nearly as
practicable to the practice and procedure in a similar action
or proceeding in the courts of the State in which the
property is located” in paragraph (3) and inserting “shall
be in accordance with rule 71.1 of the Federal Rules of Civil
Procedure.”.
(e) Cost Allocation.—
(1) In general.—Section 216 of the Federal Power Act (16
U.S.C. 824p) is amended by striking subsection (f) and
inserting the following:
“(f) Cost Allocation.—
“(1) Transmission tariffs.—For the purposes of this
section and except as provided in paragraph (2), any
transmitting utility that owns, controls, or operates, or
proposes to construct, electric transmission facilities with
respect to which the Commission finds that the criteria set
forth in paragraphs (2) through (5) and, if applicable, (6)
of subsection (b) are satisfied, and any entity that will
become a transmitting utility on completion of 1 or more
proposed electric transmission facilities with respect to
which the Commission finds that those criteria are satisfied,
shall file a tariff or tariff revision with the Commission
pursuant to section 205 and the regulations of the Commission
allocating the costs of those new or modified electric
transmission facilities. The issuance of a permit under
subsection (b) shall not be required to make, or otherwise
act as a prerequisite to making, that filing pursuant to
section 205, provided that the Commission finds that the
criteria set forth in paragraphs (2) through (5) and, as
applicable, (6) or (7) of subsection (b) are satisfied with
respect to the applicable facilities.
“(2) Exception.—In the case of an exempt transmitting
utility (as defined in section 225(a)) that owns, controls,
or operates electric transmission facilities described in
paragraph (1), the Commission, notwithstanding section
211A(c), shall require the exempt transmitting utility to
provide transmission
services over such facilities pursuant to section 211A and
the regulations of the Commission allocating the costs of the
new or modified transmission facilities.
“(3) Transmission benefits.—The Commission shall require
that tariffs or tariff revisions filed under this section are
just and reasonable and allocate the costs of providing
service to customers that benefit, in accordance with the
cost-causation principle and at least roughly commensurate
with the benefits, including through—
“(A) improved reliability;
“(B) reduced congestion;
“(C) reduced power losses;
“(D) greater carrying capacity that delivers improved
reliability or reductions in the cost of delivered power;
“(E) reduced operating reserve requirements; and
“(F) improved access to generation that achieves
reductions in the cost of delivered power.
“(4) Ratepayer protection.—Customers that receive no
benefit, or benefits that are trivial in relation to the
costs sought to be allocated, from existing or proposed
electric transmission facilities the costs of which are
allocated pursuant to paragraph (1) shall not be
involuntarily allocated any of the costs of those
transmission facilities, provided, however, that nothing in
this section shall prevent a transmitting utility from
recovering all or part of such costs through voluntary
agreement with its customers and allocating any remaining
costs in accordance with this subsection.”.
(2) Savings provision.—If the Federal Energy Regulatory
Commission finds that the considerations under paragraphs (2)
through (5) and, as applicable, (6) or (7) of subsection (b)
of section 216 of the Federal Power Act (16 U.S.C. 824p) (as
amended by subsection (b)) are satisfied, nothing in this
section or the amendments made by this section shall be
construed to exclude transmission facilities located on the
outer Continental Shelf from being eligible for cost
allocation established under subsection (f)(1) of that
section (as amended by paragraph (1)).
(f) Coordination of Federal Authorizations for Transmission
Facilities.—Section 216(h) of the Federal Power Act (16
U.S.C. 824p(h)) is amended—
(1) in paragraph (1), by adding at the end the following:
“(C) The term `Federal authorization' includes a
certification under section 401 of the Federal Water
Pollution Control Act (33 U.S.C. 1341) from a certifying
authority (as defined in subsection (h) of that section) and
any other permit, license, concurrence, or approval of a
State administrative agency required under Federal law, other
than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451
et seq.), in order to site a transmission facility.”;
(2) in paragraph (2), by striking the period at the end and
inserting the following: “, except that—
“(A) the Commission shall act as the lead agency in the
case of facilities permitted under subsection (b) or section
225; and
“(B) the Department of the Interior shall act as the lead
agency in the case of facilities located on a lease,
easement, or right-of-way granted by the Secretary of the
Interior under section 8(p)(1)(C) of the Outer Continental
Shelf Lands Act (43 U.S.C. 1337(p)(1)(C)).”;
(3) in each of paragraphs (3), (4)(B), (4)(C), (5)(B),
(6)(A), (7)(A), (7)(B)(i), (8)(A)(i), and (9), by striking
“Secretary” each place it appears and inserting “lead
agency”;
(4) in paragraph (4)(A), by striking “As head of the lead
agency, the Secretary” and inserting “The lead agency”;
(5) in paragraph (5)(A), by striking “As lead agency head,
the Secretary” and inserting “The lead agency”;
(6) in paragraph (7)—
(A) in subparagraph (A), by striking “18 months after the
date of enactment of this section” and inserting “18 months
after the date of enactment of the Bipartisan American
Affordability and Jobs Act of 2026”; and
(B) in subparagraph (B)(i), by striking “1 year after the
date of enactment of this section” and inserting “18 months
after the date of enactment of the Bipartisan American
Affordability and Jobs Act of 2026”; and
(7) by adding at the end the following:
“(10) Any order or action of a Federal agency or State
administrative agency acting pursuant to Federal law to
issue, condition, or deny a Federal authorization shall be
subject to judicial review in the same courts in which an
order of the Commission is subject to judicial review under
section 313, and a court shall have jurisdiction over the
action in accordance with the third sentence of subsection
(b) of that section, the courts described in that section
having original and exclusive jurisdiction over such
actions.”.
(g) Interstate Compacts.—Section 216(i) of the Federal
Power Act (16 U.S.C. 824p(i)) is amended—
(1) in paragraph (3), by striking “, including facilities
in national interest electric transmission corridors”; and
(2) in paragraph (4)—
(A) in subparagraph (A), by striking “; and” and
inserting a period;
(B) by striking subparagraph (B); and
(C) by striking “in disagreement” in the matter preceding
subparagraph (A) and all that follows through “(A) the” in
subparagraph (A) and inserting “unable to reach an agreement
on an application seeking approval by the”.
(h) Transmission Infrastructure Investment.—Section
219(b)(4) of the Federal Power Act (16 U.S.C. 824s(b)(4)) is
amended—
(1) in subparagraph (A), by striking “and” after the
semicolon at the end;
(2) in subparagraph (B), by striking the period at the end
and inserting “; and”; and
(3) by adding at the end the following:
“(C) all prudently incurred costs associated with payments
to jurisdictions impacted by electric transmission facilities
developed pursuant to section 216 or 225.”.
(i) Jurisdiction.—Section 216 of the Federal Power Act (16
U.S.C. 824p) is amended by striking subsection (k) and
inserting the following:
“(k) Jurisdiction.—
“(1) ERCOT.—This section shall not apply within the area
referred to in section 212(k)(2)(A).
“(2) Other utilities.—
“(A) In general.—For the purposes of this section, the
Commission shall have jurisdiction over all transmitting
utilities, including transmitting utilities described in
section 201(f), but excluding any ERCOT utility (as defined
in section 212(k)(2)(B)) and any exempt transmitting utility
(as defined in section 225(a)) that does not voluntarily
subject itself to Commission jurisdiction for the purposes of
this section.
“(B) Clarification.—Being subject to Commission
jurisdiction for the purposes of this section shall not make
an entity described in section 201(f) a public utility for
the purposes of section 201(e).”.
(j) Conforming Amendments.—
(1) Section 50151(b) of Public Law 117-169 (42 U.S.C.
18715(b)) is amended by striking “facilities designated by
the Secretary to be necessary in the national interest under
section 216(a) of the Federal Power Act (16 U.S.C. 824p(a))”
and inserting “facilities in a geographic area identified
under section 224 of the Federal Power Act”.
(2) Section 1222 of the Energy Policy Act of 2005 (42
U.S.C. 16421) is amended—
(A) in subsection (a)(1)(A), by striking “in a national
interest electric transmission corridor designated under
section 216(a)” and inserting “in a geographic area
identified under section 224”; and
(B) in subsection (b)(1)(A), by striking “in an area
designated under section 216(a)” and inserting “in a
geographic area identified under section 224”.
(3) Section 40106(h)(1)(A) of the Infrastructure Investment
and Jobs Act (42 U.S.C. 18713(h)(1)(A)) is amended by
striking “in an area designated as a national interest
electric transmission corridor pursuant to section 216(a) of
the Federal Power Act 16 U.S.C. 824p(a)” and inserting “in
a geographic area identified under section 224 of the Federal
Power Act”.
SEC. 2102. RECONDUCTORING AND OTHER ACTIVITIES IN EXISTING
RIGHTS-OF-WAY.
(a) Categorical Exclusion for Reconductoring.—The Federal
Power Act is amended by inserting after section 216 (16
U.S.C. 824p) the following:
“SEC. 216A. GRID CAPACITY EXPANSION IN EXISTING RIGHTS-OF-
WAY.
“(a) Definitions.—In this section:
“(1) Applicable electrical standard.—The term `applicable
electrical standard' includes—
“(A) a reliability standard (as defined in section
215(a)); and
“(B) an applicable clause of the National Electrical
Safety Code published by the Institute of Electrical and
Electronics Engineers Standards Association.
“(2) Covered area.—The term `covered area' means an
area—
“(A) within an existing right-of-way; or
“(B) within the minimum additional area adjacent to an
existing right-of-way, provided that the total additional
area is not more than \1/4\ mile from the boundary of the
right-of-way, that is necessary—
“(i) to comply with applicable electrical standards; or
“(ii) to complete an activity described in subsection (b).
“(3) Covered facility.—The term `covered facility' means
an existing electric transmission or distribution facility or
associated infrastructure (including an electrical
substation) that is located within a covered area.
“(b) Exemptions.—
“(1) In general.—Activities to maintain or increase the
transmission capacity of the electric grid within a covered
area, and any Federal agency action authorizing such
activities shall not be considered to be—
“(A) a major Federal action for purposes of the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or
“(B) an undertaking for purposes of section 306108 of
title 54, United States Code.
“(2) Inclusions.—The activities described in paragraph
(1) include—
“(A) any repair, maintenance, replacement, upgrade,
rebuilding, modification, optimization, minor relocation of,
or addition to, a covered facility, including—
“(i) reconductoring;
“(ii) an increase in operating voltage;
“(iii) a circuit addition or adjustment;
“(iv) installation of advanced transmission technologies
(as defined in section 1223(a) of the Energy Policy Act of
2005 (42 U.S.C. 16422(a))); and
“(v) installation of grid-enhancing advanced transmission
technologies (as defined in section 232(a));
“(B) any minimum widening of an existing right-of-way
associated with an activity described in subparagraph (A)
that—
“(i) is necessary to comply with applicable electrical
standards; or
“(ii) remains within a covered area;
“(C) an addition of energy storage at or near a covered
facility; and
“(D) the addition of a parallel circuit within an existing
right-of-way.”.
(b) Interstate Natural Gas Pipeline Modernization Within
Existing Corridors.—Section 7 of the Natural Gas Act (15
U.S.C. 717f) is amended by adding at the end the following:
“(i) Covered Pipeline Activities.—
“(1) Definitions.—In this subsection:
“(A) Covered activity.—The term `covered activity' means
any repair, maintenance, replacement, upgrade, rebuilding,
modification, optimization, minor relocation, looping,
compression, capacity-enhancement project, or addition to a
covered facility.
“(B) Covered area.—The term `covered area' means—
“(i) an existing right-of-way; and
“(ii) the footprint of original construction previously
authorized and environmentally reviewed under the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.),
together with any minimum additional area adjacent to an
existing right-of-way, provided that the total additional
area is not more than \1/4\ mile from the boundary of the
right-of-way, that is necessary to complete a covered
activity.
“(C) Covered facility.—The term `covered facility' means
an existing interstate natural gas pipeline or associated
infrastructure, including a compressor station, meter
station, regulator station, valve site, launcher, receiver,
storage-related facility, or similar facility located within
a covered area.
“(2) Environmental review.—A covered activity and any
Federal agency action authorizing that covered activity—
“(A) shall not be considered a major Federal action under
the National Environmental Policy Act of 1969 (42 U.S.C. 4321
et seq.) if the covered activity remains within a covered
area; and
“(B) shall not be considered an undertaking for purposes
of section 306108 of title 54, United States Code, if the
covered activity remains within a covered area.
“(3) Rule of construction.—Nothing in this subsection
affects the applicability of any requirement under—
“(A) the Federal Water Pollution Control Act (33 U.S.C.
1251 et seq.) (commonly known as the `Clean Water Act');
“(B) the Clean Air Act (42 U.S.C. 7401 et seq.); or
“(C) any other applicable Federal law not expressly
addressed by this subsection.”.
(c) Pipeline Construction.—Section 7 of the Natural Gas
Act (15 U.S.C. 717f) (as amended by subsection (b)) is
amended by adding at the end the following:
“(j) Pipeline Construction.—To the maximum extent
practicable and reasonable, the proposed construction of an
interstate natural gas pipeline shall be sited—
“(1) near and parallel to roads, the rights-of-way of
railways, or along division lines of lands, according to a
government survey;
“(2) so as not to interfere with the use by the public of
highways or streams; and
“(3) so as not to unnecessarily interfere with the use of
any land by an affected landowner.”.
SEC. 2103. TRANSMISSION PLANNING.
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is
amended by adding at the end the following:
“SEC. 224. TRANSMISSION STUDY.
“(a) In General.—Not later than 1 year after the date of
enactment of this section and every 3 years thereafter, the
Secretary of Energy (referred to in this section as the
`Secretary'), in consultation with affected States and Indian
Tribes, shall conduct a study of electric transmission
capacity constraints and congestion.
“(b) Report.—
“(1) In general.—Not less frequently than once every 3
years, the Secretary shall issue a report based on the study
under subsection (a) or other information relating to
electric transmission capacity constraints and congestion.
“(2) Opportunity for comment.—Before issuing a report
under paragraph (1), the Secretary shall—
“(A) provide an opportunity for comment to affected States
and Indian Tribes; and
“(B) take into consideration any comments received under
subparagraph (A) in preparing the report.
“(3) Identification of areas with capacity constraints and
congestion.—After considering alternatives and
recommendations from interested parties (including any
comments received from affected States and Indian Tribes),
the Secretary may identify in a report issued under paragraph
(1) any geographic area that—
“(A) is experiencing electric energy transmission capacity
constraints or congestion that adversely affects consumers;
or
“(B) is expected to experience such energy transmission
capacity constraints or congestion.
“(c) Consultation.—Not less frequently than once every 3
years, the Secretary, in conducting the study under
subsection (a) and issuing the report under subsection (b),
shall consult with affected transmission planning regions (as
defined in section 225(a)) and any appropriate regional
entity referred to in section 215.
“(d) Alaska.—The Secretary—
“(1) shall, in consultation with the State of Alaska and
affected Indian Tribes, consider any intrastate transmission
capacity constraints and congestion within the State of
Alaska in the study under subsection (a); and
“(2) in issuing the report under subsection (b), may,
subject to the approval of the Regulatory Commission of
Alaska, identify any geographic area in the State of Alaska
that—
“(A) is experiencing electric energy transmission capacity
constraints or congestion that adversely affects consumers;
or
“(B) is expected to experience such energy transmission
capacity constraints or congestion.
“SEC. 225. PLANNING FOR TRANSMISSION FACILITIES THAT ENHANCE
GRID RELIABILITY, AFFORDABILITY, AND
RESILIENCE.
“(a) Definitions.—In this section:
“(1) Commission.—The term `Commission' means the Federal
Energy Regulatory Commission.
“(2) ERO.—The term `ERO' has the meaning given the term
in section 215(a).
“(3) Exempt transmitting utility.—The term `exempt
transmitting utility' means a transmitting utility that is a
State or any political subdivision of a State, an electric
cooperative that receives financing under the Rural
Electrification Act of 1936 (7 U.S.C. 901 et seq.) or that
sells less than 4,000,000 megawatt hours of electricity per
year, or any agency, authority, or instrumentality of any one
or more of the foregoing, or any corporation which is wholly
owned, directly or indirectly, by any one or more of the
foregoing.
“(4) Improved reliability.—The term `improved
reliability' means that, on balance, considering each of the
matters described in subparagraphs (A) through (D),
reliability is improved in a material manner that benefits
customers through at least one of the following:
“(A) Facilitating compliance with a mandatory standard for
reliability approved by the Commission under section 215.
“(B) A reduction in expected unserved energy, loss of load
hours, or loss of load probability (as defined by the ERO).
“(C) Facilitating compliance with a tariff requirement or
process for resource adequacy on file with the Commission.
“(D) Any other similar material improvement, including a
reduction in correlated outage risk.
“(5) Interregional transmission facility.—The term
`interregional transmission facility' means a transmission
facility that—
“(A) is located within 2 or more neighboring transmission
planning regions; or
“(B) significantly impacts the ability of 1 or more
transmission planning regions to transmit electric energy
among neighboring transmission planning regions.
“(6) Regional transmission facility.—The term `regional
transmission facility' means a transmission facility that—
“(A) is located within 1 transmission planning region; and
“(B) is not an interregional transmission facility.
“(7) Transmission planning region.—
“(A) In general.—The term `transmission planning
region'—
“(i) when used in a geographical sense, means a region for
which the Commission determines that electric transmission
planning is appropriate, such as a region established in
accordance with Order No. 1000 of the Commission, entitled
`Transmission Planning and Cost Allocation by Transmission
Owning and Operating Public Utilities' (76 Fed. Reg. 49842
(August 11, 2011)); and
“(ii) when used in a corporate sense, means the
Transmission Organization or other entity responsible for
planning or operating electric transmission facilities within
a region described in clause (i).
“(B) Exclusion.—The term `transmission planning region'
does not include the Electric Reliability Council of Texas or
the region served by members of the Electric Reliability
Council of Texas.
“(b) Jurisdiction.—
“(1) ERCOT.—This section shall not apply within the area
referred to in section 212(k)(2)(A).
“(2) Other utilities.—
“(A) In general.—For the purposes of this section, the
Commission shall have jurisdiction over all transmitting
utilities, including transmitting utilities described in
section 201(f), but excluding any ERCOT utility (as defined
in section 212(k)(2)(B)) and any exempt transmitting utility
that does not voluntarily subject itself to Commission
jurisdiction for the purposes of this section.
“(B) Clarification.—Being subject to Commission
jurisdiction for the purposes of this section shall not make
an entity described in section 201(f) a public utility for
the purposes of section 201(e).
“(c) Rulemaking Requirement.—Not later than 180 days
after the date of enactment of this section, the Commission
shall, consistent with the requirements of this section, by
rule—
“(1) require each transmission planning region to
establish a process for planning for regional transmission
facilities in accordance with this section;
“(2) require neighboring transmission planning regions to
jointly establish a process for planning interregional
transmission facilities in accordance with this section;
“(3) require each transmission planning region to submit
to the Commission for approval—
“(A) a regional transmission planning process; and
“(B) a joint interregional transmission planning process
with each of its neighboring transmission planning regions,
which requirement may, at the discretion of the transmission
planning region, be satisfied through the submission of—
“(i) a separate joint interregional transmission planning
process with each of its neighboring transmission planning
regions; or
“(ii) 1 or more joint interregional transmission planning
processes, any of which may be submitted with any 1 or more
of its neighboring transmission planning regions; and
“(4) establish rate treatments for regional and
interregional transmission planning and cost allocation.
“(d) Transmission Planning Process Elements.—The
Commission shall require, within the rule under subsection
(c), that regional and joint interregional transmission
planning processes contain the following elements:
“(1) Compatibility.—A common set of input assumptions and
models, on a consistent timeline, that—
“(A) allow for the joint identification and selection of
specific interregional transmission facilities, and
individual identification and selection of specific regional
transmission facilities, by transmission planning regions,
for construction or modification, including through the use
of advanced transmission conductors (including
superconductors) and reconductoring;
“(B) consider, to the extent reasonable and economical,
modifications that maximize the transmission capabilities of
existing towers, structures, or rights-of-way; and
“(C) consider interactions with existing regional,
interregional, and supplemental transmission plans and
planning processes, including the consolidated planning
process established under section 228(a).
“(2) Transmission benefits.—A common set of benefits for
regional and interregional transmission planning and cost
allocation, including—
“(A) improved reliability;
“(B) reduced congestion;
“(C) reduced power losses;
“(D) greater carrying capacity that delivers improved
reliability or reductions in the cost of delivered power;
“(E) reduced operating reserve requirements; and
“(F) improved access to generation that achieves
reductions in the cost of delivered power.
“(3) Selection criteria.—Criteria governing the selection
by transmission planning regions, for construction or
modification, of regional and interregional transmission
facilities that—
“(A) provide improved reliability;
“(B) protect or benefit consumers; and
“(C) are consistent with the public interest.
“(4) State and tribal participation.—Any right, role,
engagement period, or opportunity afforded to States or
political subdivisions of a State under a rule issued under
subsection (c), or under any order described in subsection
(h)(1), shall be afforded on a commensurate basis to Indian
Tribes or subdivisions of Indian Tribes.
“(e) Deadline; Planning Cycles.—The regional and joint
interregional transmission planning processes required to be
submitted to the Commission pursuant to the rule under
subsection (c) shall be—
“(1) submitted to the Commission not later than 2 years
after the date of enactment of this section; and
“(2) conducted, including the identification of
transmission needs and the evaluation and selection of
transmission facilities in accordance with subsection (d),
not less frequently than once every 4 years, with the first
planning cycle commencing not later than 1 year after the
date on which the Commission approves the applicable planning
process under subsection (f)(2).
“(f) Commission Review.—The Commission shall—
“(1) review each regional and joint interregional
transmission planning process submitted pursuant to the rule
under subsection (c); and
“(2) approve the regional or joint interregional
transmission planning process if the Commission finds that
the process—
“(A) meets the requirements of subsection (d);
“(B) allocates costs in accordance with subsection (g);
“(C) meets the requirement of sections 205 and 206 that
all rates, charges, terms, and conditions will be just and
reasonable and not unduly discriminatory or preferential; and
“(D) is consistent with the public interest.
“(g) Cost Allocation.—
“(1) Transmission tariffs.—For the purposes of this
section and except as provided in paragraph (2), any
transmitting utility that owns, controls, or operates, or
proposes to construct, electric transmission facilities
selected in a regional or joint interregional transmission
plan for the purposes of cost allocation pursuant to a
transmission planning process approved under subsection
(f)(2) or described in subsection (h)(1) shall file a tariff
or tariff revision with the Commission pursuant to section
205 and the regulations of the Commission allocating the
costs of the new or modified transmission facilities.
“(2) Exception.—In the case of an exempt transmitting
utility that owns, controls, or operates electric
transmission facilities described in paragraph (1), the
Commission, notwithstanding section 211A(c), shall require
the exempt transmitting utility to provide transmission
services over such facilities pursuant to section 211A and
the regulations of the Commission allocating the costs of the
new or modified transmission facilities.
“(3) Requirement.—The Commission shall require that
tariffs or tariff revisions filed under this section are just
and reasonable and allocate the costs of providing service to
customers that benefit, in accordance with the cost-causation
principle and at least roughly commensurate with the
benefits, including through the benefits described in
subsection (d)(2).
“(4) Ratepayer protection.—Customers that receive no
benefit, or benefits that are trivial in relation to the
costs sought to be allocated, from electric transmission
facilities constructed or modified under this section shall
not be involuntarily allocated any of the costs of those
transmission facilities.
“(h) Compliance With This Section.—A Commission order or
rulemaking regarding transmission planning that is effective
as of the date of enactment of this section, including orders
published in the Federal Register on April 28, 2025, December
6, 2024, and June 11, 2024, shall constitute compliance with
the regional transmission planning and cost allocation
requirements of this section and relieves the Commission of
the requirements under subsection (c)(1).
“(i) Construction Permit.—For the purposes of obtaining a
construction permit under section 216(b), a project that is
selected by 1 or more transmission planning regions pursuant
to a regional or joint interregional transmission plan in
accordance with this section shall be considered to satisfy
paragraphs (2) through (5) and, as applicable, (6) or (7) of
that section.