SA 6997. Ms. DUCKWORTH submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Beginning on page 249, strike line 23 and all that follows
through page 256, line 2, and insert the following:
(j) Land Restoration.—Section 216 of the Federal Power Act
(16 U.S.C. 824p) is amended—
(1) by redesignating subsections (j) and (k) as subsections
(k) and (l), respectively; and
(2) by inserting after subsection (i) the following:
“(j) Land Restoration.—
“(1) In general.—Not later than 180 days after the date
of enactment of the Bipartisan American Affordability and
Jobs Act of 2026, the Commission, in consultation with the
Secretary of Agriculture, the Secretary of the Interior,
affected States and Indian Tribes, and relevant stakeholders,
shall issue rules establishing standards for the restoration
of affected property during and after construction of
electric transmission facilities, including—
“(A) standards relating to—
“(i) topsoil separation and replacement;
“(ii) temporary and permanent repair to drain tile;
“(iii) removal of rocks and debris from the right-of-way;
“(iv) restoration of areas of soil compaction;
“(v) restoration of terraces, waterways, and other erosion
control structures;
“(vi) revegetation of untilled land;
“(vii) future installation of drain tile or soil
conservation structures;
“(viii) restoration of land slope and contour;
“(ix) restoration of areas used for field entrances and
temporary roads;
“(x) construction in wet conditions; and
“(xi) designation of a point of contact for affected
landowner inquires or claims; and
“(B) any other standard that the Commission determines is
necessary to ensure that affected landowners are able to use
affected property to as similar an extent as possible to the
use of that property before the construction of an electric
transmission facility.
“(2) Inspections.—
“(A) In general.—The Commission shall require, and
establish procedures for the conduct of, an on-site
inspection for compliance with the standards established
under paragraph (1).
“(B) Requirement.—An on-site inspection under
subparagraph (A) shall be conducted by an independent
professional engineer that—
“(i) is familiar with the standards established under
paragraph (1); and
“(ii) does not have a conflict of interest with respect to
the inspection.
“(C) Cost.—The cost of an inspection under subparagraph
(A) shall be borne by the holder of the permit for the
applicable electric transmission facility.
“(3) Remedies.—
“(A) Initial notice and corrective action.—
“(i) In general.—If, pursuant to an inspection under
paragraph (2), an inspector finds a violation of a standard
established under paragraph (1), a land restoration plan
described in paragraph (4), or an independent
agreement on land restoration, the inspector conducting the
inspection shall—
“(I) give oral notice of the violation, followed by a
written notice, to the holder of the permit for the
applicable electric transmission facility; and
“(II) order that permit holder to take corrective action
to come into compliance and remedy the violation, the cost of
which shall be borne by that permit holder.
“(ii) Cessation of construction activity.—If an
inspection under paragraph (2) occurs during the construction
of an electric transmission facility and the inspector finds
a violation of a standard established under paragraph (1), a
land restoration plan described in paragraph (4), or an
independent agreement on land restoration, the inspector may
issue an order to temporarily halt construction activity
until the permit holder remedies the violation.
“(B) Further action.—
“(i) In general.—If, after receiving notice of a
violation under subparagraph (A)(i), a permit holder does not
remedy the violation identified in the notice, the Commission
shall issue an order requiring corrective action to be taken,
including a timeline for completion.
“(ii) Timeline extension.—The Commission may extend or
alter a timeline established under clause (i) if the permit
holder is actively cooperating with the Commission—
“(I) to remedy the violation identified in the notice
provided under subparagraph (A)(i); and
“(II) to take the corrective action identified in the
order issued under clause (i).
“(iii) Further remedies.—If a permit holder fails to
comply with an order requiring corrective action under clause
(i) within the timeline established by the Commission (as
extended or altered under clause (ii), if applicable), the
Commission—
“(I) may revoke the permit; and
“(II) shall impose a civil penalty equal to the sum
obtained by adding—
“(aa) $100,000; and
“(bb) the reasonable cost, as determined by the
Commission, in consultation with the affected landowners, of
the land remediation activities necessary to remedy the
violation identified in the notice provided under
subparagraph (A)(i).
“(C) Distribution of civil penalty; affected landowner
compensation.—The amount of any civil penalty collected
under subparagraph (B)(iii)(II) shall be distributed as
follows:
“(i) The amount described in item (aa) of that
subparagraph shall be retained by the Commission.
“(ii) The amount described in item (bb) of that
subparagraph shall be provided proportionately to affected
landowners based on the estimated cost of necessary land
remediation activities on the affected property of each
affected landowner.
“(D) Judicial review.—
“(i) In general.—An affected landowner alleging a
violation of any requirement of this subsection, including
violation of a standard established under paragraph (1), an
inspection requirement under paragraph (2), or an order
issued under paragraph (3), may bring a civil action against
the permit holder in—
“(I) the district court of the United States for the
judicial district in which the affected property is located;
or
“(II) the appropriate court of the State in which the
affected property is located.
“(ii) Remedies.—In an action under clause (i), a court
may order all appropriate relief, including injunctive relief
and compensatory, punitive, and incidental damages, including
attorney fees.
“(4) Land restoration plans.—
“(A) In general.—An applicant for a construction permit
under subsection (b) shall file with the application for that
permit under subsection (c) a written land restoration plan
describing how the construction activity will meet the
standards established under paragraph (1).
“(B) Copies of land restoration plan.—An applicant
described in subparagraph (A) shall provide a copy of the
land restoration plan described in that subparagraph to all
affected landowners.
“(5) Independent land restoration agreements.—
Notwithstanding the standards established under paragraph
(1), an applicant for a construction permit under subsection
(b) may, in lieu of or in addition to issuing a land
restoration plan under paragraph (4), enter into written
independent land restoration agreements with affected
landowners.
“(6) Inspections under independent land restoration
agreements.—If an inspection under paragraph (2) is to occur
at a construction site for which an independent land
restoration agreement exists as described in paragraph (5), a
copy of the independent land restoration agreement shall be
provided to the inspector.”.
(k) Conforming Amendments.—
(1) Section 50151(b) of Public Law 117-169 (42 U.S.C.
18715(b)) is amended by striking “facilities designated by
the Secretary to be necessary in the national interest under
section 216(a) of the Federal Power Act (16 U.S.C. 824p(a))”
and inserting “facilities in a geographic area identified
under section 224 of the Federal Power Act”.
(2) Section 1222 of the Energy Policy Act of 2005 (42
U.S.C. 16421) is amended—
(A) in subsection (a)(1)(A), by striking “in a national
interest electric transmission corridor designated under
section 216(a)” and inserting “in a geographic area
identified under section 224”; and
(B) in subsection (b)(1)(A), by striking “in an area
designated under section 216(a)” and inserting “in a
geographic area identified under section 224”.
(3) Section 40106(h)(1)(A) of the Infrastructure Investment
and Jobs Act (42 U.S.C. 18713(h)(1)(A)) is amended by
striking “in an area designated as a national interest
electric transmission corridor pursuant to section 216(a) of
the Federal Power Act 16 U.S.C. 824p(a)” and inserting “in
a geographic area identified under section 224 of the Federal
Power Act”.
SEC. 2102. RECONDUCTORING AND OTHER ACTIVITIES IN EXISTING
RIGHTS-OF-WAY.
(a) Categorical Exclusion for Reconductoring.—The Federal
Power Act is amended by inserting after section 216 (16
U.S.C. 824p) the following:
“SEC. 216A. GRID CAPACITY EXPANSION IN EXISTING RIGHTS-OF-
WAY.
“(a) Definitions.—In this section:
“(1) Applicable electrical standard.—The term `applicable
electrical standard' includes—
“(A) a reliability standard (as defined in section
215(a)); and
“(B) an applicable clause of the National Electrical
Safety Code published by the Institute of Electrical and
Electronics Engineers Standards Association.
“(2) Covered area.—The term `covered area' means an
area—
“(A) within an existing right-of-way; or
“(B) within the minimum additional area adjacent to an
existing right-of-way, provided that the total additional
area is not more than \1/4\ mile from the boundary of the
right-of-way, that is necessary—
“(i) to comply with applicable electrical standards; or
“(ii) to complete an activity described in subsection (b).
“(3) Covered facility.—The term `covered facility' means
an existing electric transmission or distribution facility or
associated infrastructure (including an electrical
substation) that is located within a covered area.
“(b) Exemptions.—
“(1) In general.—Activities to maintain or increase the
transmission capacity of the electric grid within a covered
area, and any Federal agency action authorizing such
activities shall not be considered to be—
“(A) a major Federal action for purposes of the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or
“(B) an undertaking for purposes of section 306108 of
title 54, United States Code.
“(2) Inclusions.—The activities described in paragraph
(1) include—
“(A) any repair, maintenance, replacement, upgrade,
rebuilding, modification, optimization, minor relocation of,
or addition to, a covered facility, including—
“(i) reconductoring;
“(ii) an increase in operating voltage;
“(iii) a circuit addition or adjustment;
“(iv) installation of advanced transmission technologies
(as defined in section 1223(a) of the Energy Policy Act of
2005 (42 U.S.C. 16422(a))); and
“(v) installation of grid-enhancing advanced transmission
technologies (as defined in section 232(a));
“(B) any minimum widening of an existing right-of-way
associated with an activity described in subparagraph (A)
that—
“(i) is necessary to comply with applicable electrical
standards; or
“(ii) remains within a covered area;
“(C) an addition of energy storage at or near a covered
facility; and
“(D) the addition of a parallel circuit within an existing
right-of-way.”.
(b) Interstate Natural Gas Pipeline Modernization Within
Existing Corridors.—Section 7 of the Natural Gas Act (15
U.S.C. 717f) is amended by adding at the end the following:
“(i) Covered Pipeline Activities.—
“(1) Definitions.—In this subsection:
“(A) Covered activity.—The term `covered activity' means
any repair, maintenance, replacement, upgrade, rebuilding,
modification, optimization, minor relocation, looping,
compression, capacity-enhancement project, or addition to a
covered facility.
“(B) Covered area.—The term `covered area' means—
“(i) an existing right-of-way; and
“(ii) the footprint of original construction previously
authorized and environmentally reviewed under the National
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.),
together with any minimum additional area adjacent to an
existing right-of-way, provided that the total additional
area is not more than \1/4\ mile from the boundary of the
right-of-way, that is necessary to complete a covered
activity.
“(C) Covered facility.—The term `covered facility' means
an existing interstate natural gas pipeline or associated
infrastructure, including a compressor station, meter
station, regulator station, valve site, launcher, receiver,
storage-related facility, or similar facility located within
a covered area.
“(2) Environmental review.—A covered activity and any
Federal agency action authorizing that covered activity—
“(A) shall not be considered a major Federal action under
the National Environmental Policy Act of 1969 (42 U.S.C. 4321
et seq.) if the covered activity remains within a covered
area; and
“(B) shall not be considered an undertaking for purposes
of section 306108 of title 54, United States Code, if the
covered activity remains within a covered area.
“(3) Rule of construction.—Nothing in this subsection
affects the applicability of any requirement under—
“(A) the Federal Water Pollution Control Act (33 U.S.C.
1251 et seq.) (commonly known as the `Clean Water Act');
“(B) the Clean Air Act (42 U.S.C. 7401 et seq.); or
“(C) any other applicable Federal law not expressly
addressed by this subsection.”.
(c) Land Restoration for Interstate Natural Gas
Pipelines.—Section 7 of the Natural Gas Act (15 U.S.C. 717f)
(as amended by subsection (b)) is amended by adding at the
end the following:
“(j) Land Restoration.—
“(1) In general.—Not later than 180 days after the date
of enactment of the Bipartisan American Affordability and
Jobs Act of 2026, the Commission, in consultation with the
Secretary of Agriculture, the Secretary of the Interior,
affected States and Indian Tribes, and relevant stakeholders,
shall issue rules establishing standards for the restoration
of affected property during and after construction of
interstate pipelines, including—
“(A) standards relating to—
“(i) topsoil separation and replacement;
“(ii) temporary and permanent repair to drain tile;
“(iii) removal of rocks and debris from the right-of-way;
“(iv) restoration of areas of soil compaction;
“(v) restoration of terraces, waterways, and other erosion
control structures;
“(vi) revegetation of untilled land;
“(vii) future installation of drain tile or soil
conservation structures;
“(viii) restoration of land slope and contour;
“(ix) restoration of areas used for field entrances and
temporary roads;
“(x) construction in wet conditions; and
“(xi) designation of a point of contact for affected
landowner inquires or claims; and
“(B) any other standard that the Commission determines is
necessary to ensure that affected landowners are able to use
affected property to as similar an extent as possible to the
use of that property before the construction of a pipeline.
“(2) Inspections.—
“(A) In general.—The Commission shall require, and
establish procedures for the conduct of, an on-site
inspection for compliance with the standards established
under paragraph (1).
“(B) Requirement.—An on-site inspection under
subparagraph (A) shall be conducted by an independent
professional engineer that—
“(i) is familiar with the standards established under
paragraph (1); and
“(ii) does not have a conflict of interest with respect to
the inspection.
“(C) Cost.—The cost of an inspection under subparagraph
(A) shall be borne by the holder of the certificate of public
convenience and necessity for the applicable pipeline.
“(3) Remedies.—
“(A) Initial notice and corrective action.—
“(i) In general.—If, pursuant to an inspection under
paragraph (2), an inspector finds a violation of a standard
established under paragraph (1), a land restoration plan
described in paragraph (4), or an independent agreement on
land restoration, the inspector conducting the inspection
shall—
“(I) give oral notice of the violation, followed by a
written notice, to the holder of the certificate of public
convenience and necessity for the applicable interstate
pipeline; and
“(II) order that holder to take corrective action to come
into compliance and remedy the violation, the cost of which
shall be borne by that holder.
“(ii) Cessation of construction activity.—If an
inspection under paragraph (2) occurs during the construction
of an interstate pipeline and the inspector finds a violation
of a standard established under paragraph (1), a land
restoration plan described in paragraph (4), or an
independent agreement on land restoration, the inspector may
issue an order to temporarily halt construction activity
until the holder of the certificate of public convenience and
necessity remedies the violation.
“(B) Further action.—
“(i) In general.—If, after receiving notice of a
violation under subparagraph (A)(i), a holder of a
certificate of public convenience and necessity does not
remedy the violation identified in the notice, the Commission
shall issue an order requiring corrective action to be taken,
including a timeline for completion.
“(ii) Timeline extension.—The Commission may extend or
alter a timeline established under clause (i) if the holder
of the certificate of public convenience and necessity is
actively cooperating with the Commission—
“(I) to remedy the violation identified in the notice
provided under subparagraph (A)(i); and
“(II) to take the corrective action identified in the
order issued under clause (i).
“(iii) Further remedy.—If a holder of a certificate of
public convenience and necessity fails to comply with an
order requiring corrective action under clause (i) within the
timeline established by the Commission (as extended or
altered under clause (ii), if applicable), the Commission—
“(I) may revoke the certificate of public convenience and
necessity; and
“(II) shall impose a civil penalty equal to the sum
obtained by adding—
“(aa) $100,000; and
“(bb) the reasonable cost, as determined by the
Commission, in consultation with the affected landowners, of
the land remediation activities necessary to remedy the
violation identified in the notice provided under
subparagraph (A)(i).
“(C) Distribution of civil penalty; affected landowner
compensation.—The amount of any civil penalty collected
under subparagraph (B)(iii)(II) shall be distributed as
follows:
“(i) The amount described in item (aa) of that
subparagraph shall be retained by the Commission.
“(ii) The amount described in item (bb) of that
subparagraph shall be provided proportionately to affected
landowners based on the estimated cost of necessary land
remediation activities on the affected property of each
affected landowner.
“(D) Judicial review.—
“(i) In general.—An affected landowner alleging a
violation of any requirement of this subsection, including
violation of a standard established under paragraph (1), an
inspection requirement under paragraph (2), or an order
issued under paragraph (3), may bring a civil action against
the holder of the certificate of public convenience and
necessity in—
“(I) the district court of the United States for the
judicial district in which the affected property is located;
or
“(II) the appropriate court of the State in which the
affected property is located.
“(ii) Remedies.—In an action under clause (i), a court
may order all appropriate relief, including injunctive relief
and compensatory, punitive, and incidental damages, including
attorney fees.
“(4) Land restoration plans.—
“(A) In general.—An applicant for a certificate of public
convenience and necessity under this section shall file with
the application for that certificate a written land
restoration plan describing how the construction activity
will meet the standards established under paragraph (1).
“(B) Copies of land restoration plan.—An applicant
described in subparagraph (A) shall provide a copy of the
land restoration plan described in that subparagraph to all
affected landowners.
“(5) Independent land restoration agreements.—
Notwithstanding the standards established under paragraph
(1), an applicant for a certificate of public convenience and
necessity under this section may, in lieu of or in addition
to issuing a land restoration plan under paragraph (4), enter
into written independent land restoration agreements with
affected landowners.
“(6) Inspections under independent land restoration
agreements.—If an inspection under paragraph (2) is to occur
at a construction site for which an independent land
restoration agreement exists as described in paragraph (5), a
copy of the independent land restoration agreement shall be
provided to the inspector.”.