SA 7011. Ms. ALSOBROOKS (for herself and Mrs. Shaheen) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Strike title II of division A and insert the following:
TITLE II—CLEAN WATER ACT
SEC. 1201. CLEAN WATER ACT PERMITTING AND STATE
CERTIFICATION.
Section 401 of the Federal Water Pollution Control Act (33
U.S.C. 1341) is amended by adding at the end the following:
“(e) Certification Procedures, Requirements, and
Limitations.—
“(1) Effect of certain certification actions.—
“(A) Certification or waiver.—If a certifying authority
grants a certification application or if a certifying
authority waives the certification requirement for a
certification application, the agency with jurisdiction over
the Federal license or permit for which the certification
application was made shall consider water quality
requirements satisfied for the purpose of considering the
application for the Federal license or permit.
“(B) Certification with conditions.—
“(i) In general.—If a certifying authority grants a
certification application with conditions, the agency with
jurisdiction over the Federal license or permit for which the
certification application was made shall consider water
quality requirements satisfied for the purpose of considering
the application for the Federal license or permit, subject to
the conditions included in the certification.
“(ii) Savings clause.—Nothing in this subparagraph
affects paragraph (2)(B).
“(2) Scope of certification.—
“(A) In general.—The scope of a certification provided
under this section shall be limited to ensuring that any
applicant for a Federal license or permit will comply with
water quality requirements with respect to the activity as a
whole, including any discharge that may result from the
activity.
“(B) Prohibition.—In reviewing a certification
application, no certifying authority may—
“(i) deny certification for any reason other than making a
determination that—
“(I) no modification to or reasonable condition on the
certification would make it possible to grant the
certification without violating water quality requirements;
or
“(II) after the certifying authority has sent the
communication described in clause (v)(II) of paragraph (3)(C)
and given the applicant a reasonable opportunity to provide
the additional materials or information described in that
communication, the application continues to lack—
“(aa) the information required under clause (ii) and, if
applicable, clause (iii) of that paragraph; or
“(bb) information needed to evaluate compliance with water
quality requirements, as described pursuant to paragraph
(3)(D)(iii); or
“(ii) grant certification with conditions, except for
conditions that the certifying authority determines are
necessary to ensure compliance with water quality
requirements.
“(C) Savings provision.—Nothing in this paragraph allows
a Federal licensing or permitting agency to refuse to include
conditions from a certifying authority in a Federal license
or permit if the certifying authority determines the
conditions are necessary to ensure compliance with water
quality requirements, including conditions applicable to the
activity as a whole.
“(D) Rule of construction.—Except as provided in
subsection (g), nothing in this section limits the authority
of a certifying authority under subsection (d) to establish
limitations, conditions, and monitoring requirements
applicable to the activity as a whole, rather than solely to
the discharge that gives rise to the requirement for
certification under subsection (a), if the limitations,
conditions, or requirements are necessary to ensure
compliance with water quality requirements.
“(3) Required procedures.—
“(A) Notice and hearings.—Taking into account State or
Tribal law, as appropriate, and the review period described
in paragraph (4), each certifying authority shall establish
procedures for—
“(i) public notice in the case of all certification
applications;
“(ii) to the extent the certifying authority determines to
be appropriate, public hearings in connection with specific
certification applications; and
“(iii) a prefiling meeting as described in subparagraph
(B).
“(B) Prefiling meeting.—
“(i) Request.—Before submitting a certification
application, the prospective applicant may request a
prefiling meeting with the certifying authority—
“(I) to ensure that the certifying authority receives
early notification of projects for which a certification
under subsection (a) is necessary; and
“(II) to discuss informational needs with the certifying
authority before submitting the application.
“(ii) Response required.—If a prospective applicant
requests a prefiling meeting with a certifying authority
pursuant to clause (i), the certifying authority shall—
“(I) respond to the request not later than 30 days after
the date on which the request is received; and
“(II) hold the prefiling meeting with the prospective
applicant not later than 60 days after the date on which the
request is received.
“(C) Certification applications.—
“(i) Application in writing.—A certification application
shall be made in writing to the applicable certifying
authority.
“(ii) Requirements for complete application.—A complete
certification application shall consist of the following:
“(I) Identification of each applicant for the Federal
license or permit with respect to which the certification
application is made.
“(II) A statement that information included in the
certification application is truthful, accurate, and
complete, to the best knowledge of each such applicant.
“(III) In the case of a certification application with
respect to an individual permit or license—
“(aa) identification of the Federal license or permit that
is the subject of the certification application with respect
to which the certification is requested;
“(bb) identification of any activity the conduct of which
is subject to the Federal license or permit;
“(cc) identification of the location and nature of any
discharge that may result from the activity, and the location
of the receiving waters;
“(dd) a description of means that may be used to monitor,
control, or manage any such discharge; and
“(ee) a list of all other Federal, interstate, Tribal,
State, or local agency authorizations related to the
requirement for a certification under subsection (a), and any
approval or denial of such an authorization already received.
“(IV) Any additional materials required by the applicable
certifying authority pursuant to clause (iii), subject to the
condition that the additional materials shall only be
required with respect to certification applications submitted
after the date on which the regulation described in that
clause has been promulgated.
“(iii) Additional materials.—
“(I) In general.—A certifying authority may promulgate
regulations establishing materials to be required in
completed certification applications in addition to the
materials described in subclauses (I) through (III) of clause
(ii) that the certifying authority determines are necessary
to demonstrate to the certifying authority compliance with
water quality requirements.
“(II) Requirement.—In promulgating regulations under
subclause (I), a certifying authority shall only base the
determination regarding what additional materials are needed
on what can reasonably be expected of an applicant at the
time at which a certification application is submitted.
“(III) Effect of failure to promulgate.—Beginning on or
after December 31, 2027, if a certifying authority fails to
promulgate regulations under subclause (I), a certification
application to that certifying authority shall be considered
complete if the certification application includes all of the
items described in subclauses (I) through (III) of clause
(ii).
“(IV) Transition.—Prior to December 31, 2027, a
certifying authority may require materials beyond the
materials described in subclauses (I) through (III) of clause
(ii) without promulgating regulations under subclause (I)
through a single written notice applicable to all applicants
submitting certification applications if the certifying
authority determines that those additional materials are
necessary to demonstrate to the certifying authority
compliance with water quality requirements and the additional
materials are those that can be reasonably expected of an
applicant at the time at which a certification application is
submitted.
“(iv) Acknowledgment of receipt.—Not later than 3 days
after the date on which an applicant submits to a certifying
authority a certification application for an individual
Federal license or permit, the certifying authority shall
acknowledge receipt of the certification application in
writing.
“(v) Notification of complete application or
identification of missing materials.—Not later than 90 days
after the date on which a certifying authority acknowledges
receipt of a certification application under clause (iv), the
certifying authority shall—
“(I) provide the applicant a written notification that the
certification application is complete; or
“(II) identify to the applicant in writing all specific
additional materials or information described in clauses (ii)
and, if applicable, (iii) necessary for the certification
application to be considered complete, including, for each
such additional piece of material or information, a
description of the water quality requirement for which the
additional material or information is needed in order to
evaluate compliance with that water quality requirement.
“(vi) Petition to court.—
“(I) Right to petition.—An applicant may petition for
judicial review of an alleged failure by a certifying
authority to act in accordance with clauses (ii) through (v)
by filing a written petition in a court of competent
jurisdiction.
“(II) Considerations.—In reviewing a petition under this
subclause, a reviewing court shall consider—
“(aa) the administrative record, which shall consist of
the materials required to be submitted under clause (ii);
“(bb) any materials or information identified by
certifying authority as missing pursuant to a notification
under clause (v)(II);
“(cc) the information submitted by the applicant to the
certifying authority; and
“(dd) any evidence presented to the court by the applicant
that suggests that the defense of the certifying authority to
the petition is pretextual.
“(III) Court order.—If a court, in reviewing a petition
under this clause, finds that a certifying authority has
failed to act in accordance with any of clauses (ii), (iv),
and (v), the court shall provide injunctive relief, as
appropriate, to give effect to this section.
“(D) Denials of certification for individual license or
permit.—If a certifying authority denies a certification
application for an individual license or permit, the
certifying authority shall provide to the applicant and the
applicable Federal licensing or permitting agency—
“(i) the specific water quality requirements that the
certifying authority determined will be violated if
certification were granted;
“(ii) a statement explaining why the certifying authority
determined the identified water quality requirements will be
violated; and
“(iii) if the denial is due to insufficient information, a
description of the specific water quality data or
information, if any, that would be needed to evaluate whether
granting certification will comply with water quality
requirements.
“(4) Review period.—
“(A) In general.—Subject to subparagraph (C) and in
consultation with each certifying authority, a licensing or
permitting agency shall, categorically or on a case-by-case
basis for each certification application, establish a
reasonable period of time (not to exceed 1 year from the date
of receipt of the certification application) within which a
certifying authority shall issue a final action on the
certification application, which shall account for time
required under applicable State or Tribal law for public
notice and comment periods, if any.
“(B) Failure to act.—If a certifying authority fails or
refuses to issue a final action as described in paragraph (6)
on a certification application by the end of the reasonable
period of time established under subparagraph (A) and the
reasonable period of time has not been extended in accordance
with subparagraph (C), the requirement for a certification
under subsection (a) shall be waived, except that the
reasonable period of time shall restart in the event that the
certification application is voluntarily withdrawn by the
applicant and the applicant submits a new certification
application.
“(C) Requirement for extension.—With respect to a
certification application, the reasonable period of time
established under subparagraph (A) may only be extended if—
“(i) the extension is requested, in writing, by the
applicant; and
“(ii) the certifying authority concurs, in writing, with
the extension.
“(5) Waiver of certification requirement.—
“(A) In general.—A certifying authority may, at any time
during the reasonable period of time described in paragraph
(4), affirmatively waive the requirement for a certification
under subsection (a).
“(B) No judicial review.—Notwithstanding any other
provision of Federal law, including any provision of this
section, a waiver of the requirement for a certification
under this section shall not be subject to judicial review.
“(6) Final action.—Not later than the date on which the
reasonable period of time established under paragraph (4) for
a certification application ends or on the date of a waiver
pursuant to paragraph (5)(A), as applicable, the certifying
authority shall apply only 1 of the following final actions
to the certification application:
“(A) The certification application is granted.
“(B) The certification application is granted with
conditions.
“(C) The certification application is denied.
“(D) The certification requirements under subsection (a)
have been waived in accordance with paragraph (4) or (5) with
respect to the certification application.
“(f) Judicial Review.—
“(1) Burdens of proof.—When reviewing a denial of a
certification under this section, a court shall place the
burden of proof on the certifying authority to demonstrate
that—
“(A) no reasonable modifications to or reasonable
conditions on the certification would make it possible to
grant the certification without violating water quality
requirements; or
“(B) the applicant has not provided information sufficient
to evaluate compliance with water quality requirements, as
described pursuant to subsection (e)(3)(D)(iii).
“(2) Conditions.—When reviewing a challenge to 1 or more
conditions required by a certifying authority under this
section, a court shall place the burden of proof on the
certifying authority to demonstrate that the 1 or more
challenged conditions are necessary to allow the
certification to be made without violating water quality
requirements.
“(3) Scope of conditions.—A court reviewing a condition
required by a certifying authority under this section may not
set aside the condition on the basis that the condition
applies to the activity as a whole, or to effects of the
activity other than the discharge, if the condition is
necessary to ensure compliance with water quality
requirements.
“(g) Special Rule for Certain Certifications.—
“(1) Definition of interstate transmission line project.—
In this subsection, the term `interstate transmission line
project' means a project for the construction, modification,
or upgrade of a transmission facility that is part of the
bulk-power system (as defined in section 215(a) of the
Federal Power Act (16 U.S.C. 824o(a))).
“(2) Limitation on certification requirements for certain
interstate linear infrastructure.—Notwithstanding the first
sentence of subsection (a)(1), any applicant for a
certificate of public convenience and necessity for a project
under section 7 of the Natural Gas Act (15 U.S.C. 717f) or a
Federal authorization or permit required to construct,
modify, or operate an interstate transmission line project
that may result in a direct point source discharge into the
waters of the United States shall provide to the Federal
licensing or permitting agency a certification from a
certifying authority that such direct point source discharge
complies with water quality requirements or a waiver pursuant
to this section.
“(3) Certification of no limitation and standard.—In the
case of any direct point source discharge described in this
subsection for which there is not an applicable effluent
limitation or other limitation under sections 301(b) and 302
and for which there is not an applicable standard under
sections 306 and 307, the certifying authority shall so
certify, except that such a certification shall not satisfy
section 511(c).
“(4) Review for compliance.—Notwithstanding subsection
(a)(4)—
“(A) prior to the initial operation of any federally
licensed or permitted facility or activity that may result in
a direct point source discharge into the waters of the United
States and with respect to which a certification has been
obtained pursuant to this subsection, which facility or
activity is not subject to a Federal operating license or
permit, the licensee or permittee shall provide an
opportunity for the certifying authority to review the manner
in which the facility or activity shall be operated or
conducted for the purposes of assuring that applicable
effluent limitations or other limitations or other applicable
water quality requirements will not be violated;
“(B) on notification by the certifying authority that the
operation of any federally licensed or permitted facility or
activity described in subparagraph (A) will violate
applicable effluent limitations or other limitations or other
water quality requirements, the applicable Federal agency
may, after public hearing, suspend the Federal license or
permit; and
“(C) if a Federal license or permit is suspended pursuant
to subparagraph (B), the Federal license or permit shall
remain suspended until notification is received from the
certifying authority that there is reasonable assurance that
the facility or activity will not violate the applicable
provisions of sections 301, 302, 303, 306, and 307.
“(5) Limitation and monitoring requirements of certain
linear infrastructure certifications.—Notwithstanding
subsection (d)—
“(A) any certification provided under this subsection
shall set forth any effluent limitations and other
limitations and monitoring requirements necessary to assure
that any direct point source discharge subject to this
subsection will comply with the applicable provisions of
sections 301, 302, 303, 306, and 307; and
“(B) any limitations and requirements set forth pursuant
to subparagraph (A) shall be imposed by the licensing or
permitting agency as a condition on any Federal license or
permit subject to the provisions of this section.
“(6) Reasonable period of time.—Notwithstanding the
periods of time in subsections (a)(1) and (e)(4), a licensing
or permitting agency shall, categorically or on a case-by-
case basis for each certification application, establish a
reasonable period of time (not to exceed 9 months from the
date of receipt of the certification application) within
which a certifying authority shall issue a final action on
the certification application under this subsection, which
shall account for the time required under applicable State or
Tribal law for public notice and comment periods.
“(h) Definitions.—In this section:
“(1) Certification application.—The term `certification
application' means a request from an applicant for a
certification described in subsection (a).
“(2) Certifying authority.—The term `certifying
authority', with respect to a certification application,
means, as applicable—
“(A) the State or interstate agency to which the
certification application was submitted, including an Indian
Tribe that is treated as a State for purposes of this section
pursuant to section 131.8 of title 40, Code of Federal
Regulations; or
“(B) if no State or interstate agency has the authority to
provide the certification described in subsection (a), the
Administrator.
“(3) Water quality requirements.—The term `water quality
requirements' means—
“(A) the applicable provisions of sections 301, 302, 303,
306, and 307; and
“(B) any Federal and State or Tribal laws (including
regulations) implementing sections 301, 302, 303, 306, and
307, including water quality standards adopted or promulgated
under section 303 that include designated uses, water quality
criteria, and antidegradation requirements, each of which may
be independently enforced through a certification under this
section.”.
SEC. 1202. PERMIT TERM FOR NPDES PERMITS.
Section 402(b)(1)(B) of the Federal Water Pollution Control
Act (33 U.S.C. 1342(b)(1)(B)) is amended by striking “five
years” and inserting “7 years”.
SEC. 1203. PERMITS FOR DREDGED OR FILL MATERIAL.
(a) Reducing Permitting Uncertainty.—
(1) In general.—Section 404(c) of the Federal Water
Pollution Control Act (33 U.S.C. 1344(c)) is amended—
(A) by striking “(c) The Administrator” and inserting the
following:
“(c) Specification or Use of Defined Area.—
“(1) In general.—The Administrator”;
(B) in paragraph (1) (as so designated), by inserting
“during the period described in paragraph (2) and” before
“after notice and opportunity for public hearings”; and
(C) by adding at the end the following:
“(2) Period of prohibition.—The Administrator may act
pursuant to paragraph (1) only during the period that—
“(A) begins on the date on which an applicant submits a
complete application under this section; and
“(B) ends on the date on which the Secretary issues the
permit.”.
(2) Applicability.—The amendments made by paragraph (1)
shall apply to a permit application submitted under section
404 of the Federal Water Pollution Control Act (33 U.S.C.
1344) after the date of enactment of this Act.
(b) Nationwide Permitting Improvement.—Section 404(e) of
the Federal Water Pollution Control Act (33 U.S.C. 1344(e))
is amended—
(1) by striking “(e)(1) In carrying” and inserting the
following:
“(e) General Permits on State, Regional, or Nationwide
Basis.—
“(1) Permits authorized.—In carrying”;
(2) in paragraph (2)—
(A) by striking “(2) No general” and inserting the
following:
“(2) Term.—
“(A) In general.—No general”;
(B) in subparagraph (A) (as so designated), by striking
“five years” and inserting “10 years”; and
(C) by adding at the end the following:
“(B) Timing of modification.—The Secretary may modify a
general permit pursuant to subparagraph (A) during the term
of the general permit or during the renewal of the general
permit.”; and
(3) by adding at the end the following:
“(3) Considerations.—In determining the environmental
effects of an activity under paragraph (1) or (2), the
Secretary—
“(A) shall consider only the effects on compliance with
water quality requirements (as defined in section 401(h)) of
any discharge of dredged or fill material resulting from the
activity; and
“(B) shall consider any effects of a discharge of dredged
or fill material into less than 2 acres of navigable waters
to be a minimal adverse environmental effect.
“(4) Nationwide permits for activities.—
“(A) General permits authorized.—Notwithstanding any
other provision of this section, the Secretary shall maintain
general permits on a nationwide basis for activities
described in subparagraph (B).
“(B) Activities described.—An activity referred to in
subparagraph (A) is an activity—
“(i) authorized under Nationwide Permit 12, Nationwide
Permit 14, Nationwide Permit 27, Nationwide Permit 43,
Nationwide Permit 57, or Nationwide Permit 58, as those
nationwide permits are described in and reissued pursuant to
the final rule of the Corps of Engineers entitled `Reissuance
and Modification of Nationwide Permits' (91 Fed. Reg. 768
(January 8, 2026)); and
“(ii) that results in a discharge of dredged or fill
material into less than 2 acres of navigable waters for each
single and complete project (as defined in section 330.2 of
title 33, Code of Federal Regulations (as in effect on the
date of enactment of this paragraph), including a single and
complete linear project and a single and complete non-linear
project (as those terms are defined in the final rule of the
Corps of Engineers entitled `Reissuance and Modification of
Nationwide Permits' (91 Fed. Reg. 768 (January 8, 2026))).
“(C) Retention of general and individual permitting
authority.—Nothing in this paragraph prohibits the Secretary
from issuing—
“(i) general permits on a regional or State basis; or
“(ii) individual permits for linear infrastructure
projects.
“(5) Reissuance of nationwide permits.—
“(A) In general.—Subject to subparagraph (B), in
determining whether to reissue a general permit issued on a
nationwide basis under this subsection—
“(i) no consultation with an applicable State pursuant to
section 6(a) of the Endangered Species Act of 1973 (16 U.S.C.
1535(a)) is required;
“(ii) no consultation with a Federal agency pursuant to
section 7(a)(2) of that Act (16 U.S.C. 1536(a)(2)) is
required;
“(iii) the requirements of section 102(2)(C) of the
National Environmental Policy Act of 1969 (42 U.S.C.
4332(2)(C)) shall be satisfied by preparing a programmatic
environmental assessment with respect to the general permit;
and
“(iv) no consultation under section 306108 of title 54,
United States Code, is required.
“(B) Requirement.—Clauses (i) through (iv) of
subparagraph (A) shall only apply to a general permit being
reissued pursuant to that subparagraph if the general permit
does not—
“(i) narrow or eliminate preconstruction requirements; or
“(ii) raise the threshold for such preconstruction
requirements.”.
SEC. 1204. JUDICIAL REVIEW TIMELINE CLARITY.
Section 404 of the Federal Water Pollution Control Act (33
U.S.C. 1344) is amended—
(1) in subsection (t), by striking “(t) Nothing in this
section” and inserting the following:
“(u) Savings Provision.—Nothing in this section”; and
(2) by inserting after subsection (s) the following:
“(t) Judicial Review.—
“(1) Statute of limitations.—Notwithstanding any
applicable provision of law relating to statutes of
limitations—
“(A) an action seeking judicial review, under subchapter
II of chapter 5, and chapter 7, of title 5, United States
Code (commonly known as the `Administrative Procedure Act'),
or any other applicable provision of law, of the approval by
the Administrator of a State permit program pursuant to this
section shall be filed not later than the date that is 150
days after the date on which the approval was issued, unless
a shorter time period is otherwise provided for by law;
“(B) an action seeking judicial review, under subchapter
II of chapter 5, and chapter 7, of title 5, United States
Code (commonly known as the `Administrative Procedure Act'),
or any other applicable provision of law, of an individual
permit or general permit issued under this section shall be
filed not later than the date that is 150 days after the date
on which the permit was issued, unless a shorter time period
is otherwise provided for by law; and
“(C) an action seeking judicial review, under subchapter
II of chapter 5, and chapter 7, of title 5, United States
Code (commonly known as the `Administrative Procedure Act'),
or any other applicable provision of law, of a verification
that an activity involving a discharge of dredged or fill
material is authorized by a general permit issued under this
section shall be filed not later than the date that is 150
days after the date on which the verification was issued,
unless a shorter time period is otherwise provided for by
law.
“(2) Limitation on commencement of certain actions.—
“(A) In general.—Notwithstanding any other provision of
law but subject to subparagraph (B), no action described in
subparagraph (A) or (B) of paragraph (1) may be commenced
unless the action—
“(i) is filed by a party that submitted a comment—
“(I) during the public comment period for the
administrative proceedings related to the action; and
“(II) that is sufficiently detailed to put the
Administrator, the Secretary, or the State, as applicable, on
notice of the issue on which the party seeks judicial review;
and
“(ii) is related to that comment.
“(B) Limitation.—The limitation under subparagraph (A)
shall only apply to actions for which—
“(i) a draft of the action was published in the Federal
Register; and
“(ii)(I) the applicable agency provided a public comment
period of not less than 30 days; and
“(II) such public comment period occurred after the date
of enactment of the Bipartisan American Affordability and
Jobs Act of 2026.
“(3) Remedies for actions relating to permits.—If a court
determines that the Secretary or a State, as applicable, did
not comply with the requirements of this section in issuing
an individual or general permit under this section, or in
verifying that an activity involving a discharge of dredged
or fill material is authorized by a general permit issued
under this section, or otherwise was arbitrary and capricious
under subchapter II of chapter 5, and chapter 7, of title 5,
United States Code (commonly known as the `Administrative
Procedure Act'), as applicable—
“(A) the court shall remand the matter to the Secretary or
the State, as applicable, for further proceedings consistent
with the determination of the court;
“(B) with respect to a determination regarding the
issuance of an individual or general permit under this
section, the court
may not vacate, revoke, enjoin, or otherwise limit the permit
unless the court finds that activities authorized under the
permit would present an imminent and substantial danger to
human health or the environment for which there is no other
equitable remedy available under the law; and
“(C) with respect to a determination regarding a
verification that an activity involving a discharge of
dredged or fill material is authorized by a general permit
issued under this section, the court may not enjoin or
otherwise limit the discharge unless the court finds that the
activity would present an imminent and substantial danger to
human health or the environment for which there is no other
equitable remedy available under the law.
“(4) Timeline to act on court order.—If a court remands a
matter under paragraph (3), the court shall set and enforce a
reasonable schedule and deadline, which may not exceed 180
days from the date on which the court remands the matter,
except as otherwise required by law, for the Administrator,
the Secretary, or the State, as applicable, to take such
actions as the court may order.”.