- Record: Senate Floor
- Section type: Amendments
- Chamber: Senate
- Date: November 16, 2026
- Congress: 119th Congress
- Why this source matters: This section came from the Senate floor portion of the record.
SA 7018. Mr. WELCH submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or
sexual contact; which was ordered to lie on the table; as follows:
At the appropriate place in title I of division B, insert
the following:
SEC. 21__. SHARED UTILITY REWARDS FOR GRID EFFICIENCY.
(a) Definitions.—In this section:
(1) Advanced conductor.—The term “advanced conductor”
means an electric transmission conductor that, relative to a
conductor being replaced on a given transmission or
distribution line, is designed to substantially improve
electrical or mechanical performance through the achievement
of at least 1 of the following criteria, as determined by the
Commission:
(A) A substantial increase in current-carrying capacity
under normal operating conditions.
(B) A substantial reduction in electrical resistance or
line losses under normal operating conditions.
(C) Operation at materially higher continuous allowable
operating temperatures.
(D) A reduction in thermal sag or mechanical constraints
that enables increased use of a transmission segment or
facility.
(2) Appropriate congressional committees.—The term
“appropriate congressional committees” means—
(A) the Committee on Energy and Commerce of the House of
Representatives; and
(B) the Committee on Energy and Natural Resources of the
Senate.
(3) Bulk-power system; electric utility; independent system
operator; regional transmission organization; state
regulatory authority; transmitting utility.—The terms
“bulk-power system”, “electric utility”, “Independent
System Operator”, “Regional Transmission Organization”,
“State regulatory authority”, and “transmitting utility”
have the meanings given those terms in section 3 of the
Federal Power Act (16 U.S.C. 796).
(4) Commission.—The term “Commission” means the Federal
Energy Regulatory Commission.
(5) Covered action.—
(A) In general.—The term “covered action” means an
action that would generate cost savings for ratepayers.
(B) Exclusion.—The term “covered action” does not
include the construction of a new facility or the complete
reconstruction of an existing facility.
(6) Covered electric utility.—The term “covered electric
utility” means an electric utility not subject to the
jurisdiction of the Commission for ratemaking purposes under
part II of the Federal Power Act (16 U.S.C. 824 et seq.).
(7) Covered transmission action.—The term “covered
transmission action” means a covered action to improve the
efficiency, capacity, reliability, or resilience of 1 or more
transmission facilities or transmission segments, including
through—
(A) the replacement of a conductor on a transmission line
within such a facility or segment with an advanced conductor;
or
(B) the deployment of a grid-enhancing technology.
(8) Covered transmitting utility.—The term “covered
transmitting utility” means a transmitting utility subject
to the jurisdiction of the Commission for ratemaking purposes
under part II of the Federal Power Act (16 U.S.C. 824 et
seq.).
(9) Covered utility action.—The term “covered utility
action” means a covered action taken by an electric
utility—
(A) to improve the efficiency of the generation,
transmission, or distribution of electric energy, including
by reducing the proportion of electrical energy lost during
such generation, transmission, or distribution (including
through the deployment of energy storage systems or other
technologies); or
(B) to reduce the consumption of, or peak demand for,
electric energy, including through—
(i) a technological improvement, such as the deployment of
high-efficiency appliances, smart thermostats, distributed
energy resources, or building retrofits;
(ii) the establishment of a pricing mechanism to encourage
customers of the electric utility to reduce such consumption
or shift such demand to non-peak hours; or
(iii) any other action or program to incentivize or
otherwise produce such a reduction or shift in demand.
(10) Grid-enhancing technology.—The term “grid-enhancing
technology” means any hardware or software that—
(A) increases the capacity, efficiency, reliability,
resilience, or safety of transmission facilities and
transmission technologies; and
(B) is installed, in addition to transmission facilities
and transmission technologies, for the purpose of—
(i) providing operators of such facilities and technologies
increased situational awareness and control over the electric
grid;
(ii) improving the efficiency of such facilities and
technologies;
(iii) increasing the transfer capacity of such facilities
and technologies; or
(iv) otherwise enabling the increased use, or more
efficient of use, of such facilities and technologies under
normal operating conditions.
(11) Qualifying action.—The term “qualifying action”
means a covered transmission action achieved through the
reduction of the quantity of electrical energy that enters a
transmission segment but does not exit the transmission
segment, as measured over a prescribed period of time
(commonly referred to as “transmission physical loss”).
(12) Secretary.—The term “Secretary” means the Secretary
of Energy.
(13) Transmission segment.—The term “transmission
segment” means a functionally distinct portion of an
interconnected transmission system (such as a single
transmission line or multiple transmission lines within a
prescribed zone, such as between prescribed substations), for
which the quantity of electrical energy transmitted and the
quantity of electrical energy lost during such transmission
may be independently measured, as determined by the
Commission.
(b) Federal Power Act Amendments.—Section 219 of the
Federal Power Act (16 U.S.C. 824s) is amended—
(1) in subsection (a)—
(A) by striking “Not later than 1 year after the date of
enactment of this section, the Commission shall establish, by
rule,” and inserting “The Commission shall issue such rules
as may be necessary to establish”; and
(B) by inserting “, improving efficiency,” after
“ensuring reliability”;
(2) in subsection (b)—
(A) in the matter preceding paragraph (1), by striking
“The rule shall” and inserting “The rules issued under
this section shall”;
(B) in paragraph (1), by inserting “, and operational
improvements for,” after “capital investment in”;
(C) in paragraph (2)—
(i) by inserting “or other incentive mechanism” after
“return on equity”; and
(ii) by inserting “or incentivizes improvements that
increase the efficiency of the transmission of electric
energy and reduce costs for consumers” after “(including
related transmission technologies)”;
(D) in paragraph (3), by inserting “, including
performance-based measures,” after “other measures”; and
(E) in paragraph (4) (as amended by section 2101(h))—
(i) in subparagraph (B), by striking “and” after the
semicolon at the end;
(ii) in subparagraph (C), by striking the period at the end
and inserting “; and”; and
(iii) by adding at the end the following:
“(D) amounts determined pursuant to shared savings
frameworks or other incentive mechanisms prescribed in such
rules.”; and
(3) in subsection (c), by striking “In the rule” and
inserting “In a rule”.
(c) Rulemaking on Shared Savings Framework for Transmitting
Utilities Subject to Commission Jurisdiction.—
(1) Definitions.—In this subsection:
(A) Shared savings framework.—The term “shared savings
framework” means a framework under which a covered
transmitting utility may recover a portion of verified cost
savings attributable to a qualifying action of the
transmitting utility as an incentive.
(B) Similarly situated.—The term “similarly situated”,
with respect to transmission segments, means transmission
segments that the Commission determines share comparable
characteristics, such as voltage class, geography, load
profile, or historical performance.
(2) Rule required.—Not later than 1 year after the date of
enactment of this Act, the Commission shall issue a final
rule under section 219(b)(3) of the Federal Power Act (16
U.S.C. 824s(b)(3)) that establishes shared savings
frameworks.
(3) Methodologies.—The Commission shall develop and
include in the rule under paragraph (2) standardized
methodologies, applicable across similarly situated
transmission segments, as follows:
(A) Baseline performance methodologies.—Methodologies,
developed in consultation with the Secretary, for covered
transmitting utilities to determine the annual baseline
performance of transmission facilities or transmission
segments absent qualifying actions—
(i) by measuring the baseline performance of such a
transmission facility or transmission segment—
(I) through the actual quantity of electrical energy
entering and leaving such facility or segment (commonly
referred to as “direct metering”); or
(II) if the method under subclause (I) is not feasible,
through an estimation of such quantity consistent with
modeling methodologies prescribed by the Commission; and
(ii) by normalizing data to ensure such baseline
performance accounts for variability in exogenous factors
determined by the Commission, such as variability in—
(I) weather;
(II) demand over time;
(III) upgrades, interconnections, or operational changes
made by other utilities, Independent System Operators or
Regional Transmission Organizations, or other entities
determined relevant by the Commission; or
(IV) other conditions affecting demand or generation.
(B) Methodologies relating to cost savings.—Methodologies
for covered transmitting utilities to estimate and calculate,
and for independent evaluators to verify, the cost savings
attributable to qualifying actions under the shared savings
framework, taking into account—
(i) the baseline performance of any transmission facility
or transmission segment with respect to which a qualifying
action is conducted; and
(ii) price proxies, determined according to a methodology
prescribed by the Commission, for the value of electric
energy transmitted (which may include, for a region
managed by an Independent System Operator or Regional
Transmission Organization, the locational marginal price
corresponding to the location on the electric grid where an
injection or withdrawal of power is modeled (commonly
referred to as a “pricing node”)).
(C) Methodologies relating to recoverable percentage and
rate recovery timeline.—
(i) In general.—Methodologies for covered transmitting
utilities to determine, taking into account the factors
described in clause (ii), the following:
(I) The total percentage of cost savings attributable to a
qualifying action that such a utility may recover as an
incentive under the shared savings framework, which may not
be less than 10 percent or greater than 60 percent of such
total attributable cost savings (referred to in this
subsection as the “recoverable percentage” of such
savings).
(II) The period of time during which such a utility may
recover amounts as an incentive for such an action, which may
not be shorter than a 2-year period or longer than a 5-year
period (referred to in this subsection as the “rate recovery
timeline” for such action).
(ii) Factors.—The factors described in this clause are the
following:
(I) The extent of financial or operational risk to be
assumed by a covered transmitting utility in conducting a
qualifying action.
(II) The baseline performance for transmission facilities
or transmission segments with respect to which such action is
to be conducted.
(III) The replicability or demonstration value of such
action.
(IV) The duration of cost savings predicted to result from
such action and whether such cost savings will remain
consistent over such duration.
(V) The extent to which such action is expected to result
in additional benefits, such as improvements to the
resilience or the reliable operation of the bulk-power
system, reductions to transmission congestion, or reductions
to greenhouse gas emissions.
(VI) Such other factors as the Commission may determine
relevant to ensure the incentive is performance-based,
transparent, and cost-effective.
(4) Initial filing required.—To be considered for an
incentive under the shared savings framework for the conduct
of a qualifying action, a covered transmitting utility shall
submit to the Commission an initial filing, the contents of
which shall be verified by an independent evaluator
determined appropriate by the Commission, that includes the
following:
(A) An identification of the baseline performance of any
transmission facility or transmission segment with respect to
which such action is to be conducted for the 1-year period
preceding the date on which such conduct is to be commenced,
determined by such utility pursuant to an applicable
methodology under paragraph (3)(A) (including the data
underlying such calculation).
(B) A description of such action, including an analysis of
improvements expected to result from such action.
(C) The rate recovery timeline for such action and the
recoverable percentage of cost savings attributable to such
action, determined pursuant to an applicable methodology
under paragraph (3)(C).
(D) An estimate, developed pursuant to an applicable
methodology under paragraph (3)(B), of the cost savings to
result from such action for—
(i) the 1-year period beginning on the date on which the
conduct of such action commences; and
(ii) the duration of the rate recovery timeline for such
action.
(E) A claim for 50 percent of the recoverable percentage of
cost savings estimated under subparagraph (D)(i).
(F) An agreement by such utility to file with the
Commission the annual reports required under paragraph (5),
the contents of which shall be verified by an independent
evaluator determined appropriate by the Commission.
(5) Annual reporting required.—Beginning 1 year after the
date on which a covered transmitting utility submits an
initial filing for a qualifying action under paragraph (4),
and on an annual basis thereafter until the end of the rate
recovery timeline for such action determined under
subparagraph (C) of that paragraph or until such action no
longer results in cost savings, whichever occurs first, such
utility shall file with the Commission a report containing,
with respect to the qualifying action of such utility, the
following:
(A) Data on the performance during the preceding year of
any transmission facility or transmission segment with
respect to which such action was conducted, and a comparison
of such performance to the baseline performance of that
transmission facility or transmission segment determined
pursuant to an applicable methodology under paragraph (3)(A)
for such year.
(B) The actual cost savings attributable to the qualifying
action for the preceding year, calculated pursuant to an
applicable methodology under paragraph (3)(B).
(C) If such utility expects cost savings to result from the
qualifying action during the following year, an estimate,
developed pursuant to an applicable methodology under
paragraph (3)(B) of the cost savings for such following year.
(D) A claim for the following:
(i) An amount that is the recoverable percentage of the
actual cost savings for the preceding year calculated under
subparagraph (B) minus any amount previously recovered based
on an estimate of cost savings for such year under
subparagraph (A) or (B)(ii) of paragraph (6), as applicable.
(ii) If the report includes an estimate of cost savings for
the following year under subparagraph (C), an amount that is
50 percent of the recoverable percentage of such estimated
cost savings.
(E) If such utility finds that the total amount recovered
for a year under paragraph (6) exceeds the amount equal to
the total recoverable percentage of the actual cost savings
for that year under subparagraph (B), an identification of
the excess amount.
(6) Recovery mechanism.—
(A) Rate adjustment based on initial filing.—Not later
than 60 days after receiving an initial filing of a covered
transmitting utility under paragraph (4), the Commission
shall provide to such utility a rate adjustment under which
such utility may recover the amount claimed under paragraph
(4)(E).
(B) Rate adjustment based on annual reports.—Not later
than 60 days after receiving an annual report of a covered
transmitting utility under paragraph (5), the Commission
shall provide to such utility a rate adjustment under which—
(i) subject to subparagraph (C), such utility may recover
the amount claimed under paragraph (5)(D)(i); and
(ii) if the report included a claim under paragraph
(5)(D)(ii), such utility may recover the amount so claimed.
(C) Reconciliation.—If a utility identifies an excess
amount under paragraph (5)(E), or the Commission determines
the information reported for that year under paragraph (5) is
insufficient for purposes of this subsection, the Commission
shall credit the difference to ratepayers through a rate
adjustment.
(7) Sense of congress regarding additional rulemakings.—It
is the sense of Congress that—
(A) following the issuance of the rule under paragraph (2),
the Commission should revise such rule, or issue additional
rules under the authority of section 219(b)(3) of the Federal
Power Act (16 U.S.C. 824s(b)(3)) to expand the shared savings
framework to additional categories of measurable,
demonstrable, and verifiable covered transmission actions;
(B) any such rule should include a version of the
methodologies developed under paragraph (3) adapted for such
additional categories; and
(C) any such rule should take into account the findings of
the most recently conducted study under subsection (f).
(d) Guidance for Electric Utilities Not Subject to Federal
Energy Regulatory Commission Jurisdiction.—
(1) In general.—Not later than 2 years after the date of
enactment of this Act, the Secretary, in coordination with
the Commission and State regulatory authorities, shall
develop and publish on a publicly available website of the
Department of Energy guidance to support State regulatory
authorities in establishing frameworks under which covered
electric utilities may recover a portion of verified cost
savings attributable to a covered utility action as an
incentive.
(2) Minimum elements.—The guidance under paragraph (1)
shall include—
(A) guidance, developed in accordance with paragraph (3),
for determining the baseline performance of a covered
electric utility absent a covered utility action;
(B) guidance, developed in accordance with paragraph (4),
for determining the cost savings attributable to a covered
utility action;
(C) guidance for the measurement and verification of a
covered utility action, and any cost savings attributable to
such action, by an independent evaluator determined
appropriate by the State regulatory authority concerned;
(D) guidance on potential mechanisms by which covered
electric utilities may recover a portion of the verified cost
savings attributable to a covered utility action, including
through the provision of rate adjustments by State regulatory
authorities; and
(E) such other elements as the Secretary determines
appropriate to ensure the framework specified in paragraph
(1) is transparent, performance-based, cost-effective, and
consistent with State ratemaking practices.
(3) Methodology for determining baseline performance.—
(A) In general.—In developing the guidance under paragraph
(2)(A), the Secretary, in coordination with the Commission,
shall—
(i) consult with State regulatory authorities, Independent
System Operators, Regional Transmission Organizations, and
independent evaluators determined appropriate by the
Secretary regarding such guidance;
(ii) include in such guidance technical guidance for
normalizing data to ensure the baseline performance of a
covered electric utility accounts for variability in
exogenous factors, such as variability in—
(I) weather;
(II) demand over time;
(III) upgrades, interconnections, or operational changes
made by other utilities, Independent System Operators or
Regional Transmission Organizations, or other entities
determined relevant by the Commission; or
(IV) other conditions affecting demand or generation, as
determined by the Secretary; and
(iii) ensure such guidance supports consistent treatment
across covered electric
utilities within each category described in paragraph (5).
(B) Support from national laboratories.—The National
Laboratories shall provide such technical support as the
Secretary determines necessary to carry out this paragraph.
(4) Guidance on determining cost savings.—In developing
the guidance under paragraph (2)(B), the Secretary shall—
(A) include in such guidance—
(i) principles to ensure that cost savings attributable to
a covered utility action are calculated in a manner that
takes into account price proxies for the value of electric
energy and the baseline performance of the covered electric
utility; and
(ii) tools, technical support, and reference data to assist
State regulatory authorities in applying the principles
specified in clause (i); and
(B) ensure such guidance supports consistent treatment
across covered electric utilities within each category
described in paragraph (5).
(5) Applicability to utility market structures.—In
carrying out paragraph (1), the Secretary shall develop
separate guidance for each category of covered electric
utilities as follows:
(A) Covered electric utilities (commonly referred to as
“vertically integrated utilities”) that—
(i) own and operate generation, transmission, and
distribution facilities; and
(ii) directly provide retail electric service to end-use
customers.
(B) Covered electric utilities that own or operate
transmission infrastructure but not distribution or
generation infrastructure.
(C) Covered electric utilities that own or operate
distribution infrastructure but not transmission or
generation infrastructure.
(D) Covered electric utilities that own or operate
distribution and transmission infrastructure but not
generation infrastructure.
(6) Revisions.—On the publication of each report under
subsection (f), the Secretary shall determine whether to
revise the guidance under paragraph (1), taking into account
the contents of such report and the recommendations included
therein.
(e) Grant Program for State Regulatory Authorities.—
(1) Establishment.—Not later than 2 years after the date
of enactment of this Act, the Secretary shall establish a
program under which the Secretary may award grants to State
regulatory authorities to support the development,
implementation, and oversight by such State regulatory
authorities of frameworks under which covered electric
utilities may recover a portion of verified cost savings
attributable to a covered utility action as an incentive
(referred to in this subsection as the “grant program”).
(2) Authorized uses of funds.—Amounts awarded under the
grant program may only be used to conduct the following
activities:
(A) The development of a framework referred to in paragraph
(1), or revision of an existing such framework, such that the
framework is consistent with the guidance developed under
subsection (d), including the following:
(i) The development, including the design or modeling, of
methodologies consistent with the methodologies set forth
under such guidance.
(ii) The development of data systems or other tools
necessary for the development of the framework.
(iii) The issuance or revision of regulations necessary for
the development of the framework.
(iv) The engagement with stakeholders with respect to the
development of the framework.
(B) The implementation or oversight of a framework
consistent with such guidance.
(3) Prohibited use of funds.—No amounts awarded under the
grant program may be used to pay a covered electric utility.
(4) Grant recipient reporting requirement.—
(A) In general.—As a condition of receiving amounts under
the grant program, a State regulatory authority shall agree
to submit to the Secretary, on an annual basis for the
duration of the period in which such State regulatory
authority expends such amounts, a report describing the
activities carried out using such amounts.
(B) Effect of noncompliance.—If a grant recipient fails to
submit a report required under subparagraph (A), such
recipient shall be ineligible for additional awards under
this section until the report is submitted.
(5) Administration of program.—
(A) Technical support; public registry.—In carrying out
the grant program, the Secretary shall—
(i) provide to grant recipients technical assistance in
support of activities conducted using amounts awarded under
the grant program; and
(ii) maintain a publicly accessible registry of the
activities so conducted.
(B) Reporting by secretary.—Not later than 2 years after
the date of enactment of this Act, and biennially thereafter
for the duration of the grant program, the Secretary shall
submit to the appropriate congressional committees a report
containing—
(i) a summary of the activities conducted using amounts
awarded under the grant program;
(ii) an assessment of the effectiveness of any framework
implemented using such amounts; and
(iii) an identification of any barrier to the development,
implementation, or oversight of a framework consistent with
the guidance developed under subsection (d) and
recommendations for addressing such barrier, as applicable.
(C) Allocation of funds.—Of the amounts authorized to be
appropriated or otherwise made available to the Secretary to
carry out the grant program—
(i) not more than 70 percent may be awarded for the conduct
of activities under paragraph (2)(A);
(ii) not less than 30 percent may be awarded for the
conduct of activities under paragraph (2)(B); and
(iii) not more than 5 percent may be obligated or expended
for Federal administrative expenses.
(f) Studies on Effects of Certain Rate Treatments and
Alternative Frameworks.—
(1) Studies required.—Not later than 3 years after the
date of enactment of this Act, and every 5 years thereafter,
the Secretary, in consultation with the Commission, shall—
(A) conduct a study on—
(i) inefficiencies in the electric power sector
incentivized by existing rate treatments for the transmission
of electric energy and any economic, environmental, or
societal effect of such inefficiencies, including with
respect to the customers of electric utilities, the reliable
operation of the bulk-power system, and the deployment of
cost-effective grid-enhancing technologies; and
(ii) alternative frameworks for incentive-based, including
performance-based, rate treatments for such transmission,
such as the alternative frameworks described in paragraph
(2); and
(B) publish on a publicly available website of the
Department of Energy, and submit to the appropriate
congressional committees, a report that includes—
(i) a detailed description of the findings of such study;
and
(ii) recommendations of the Secretary to align rate
treatments for the transmission of electric energy with the
goals of lowering costs for the customers of electric
utilities, enhancing the reliable operation of the bulk-power
system, reducing transmission congestion and other
inefficiencies in the transmission or delivery of electric
energy, and encouraging the deployment of cost-effective
grid-enhancing technologies.
(2) Examples of alternative frameworks.—The alternative
frameworks described in this paragraph are the following:
(A) Shared savings frameworks.
(B) Revenue decoupling models, under which authorized
revenues of utilities are separated from volumetric sales of
electricity to reduce disincentives for energy efficiency and
programs to reduce the consumption of, or peak demand for,
electric energy.
(C) Return on equity adjustments, under which authorized
utility returns are increased or decreased based on
measurable factors such as risk profile, performance
outcomes, or efficiency improvements.
(D) Multi-year rate plans, under which revenue requirements
and performance expectations for utilities are established
for a fixed multi-year period rather than through single-year
rate cases.
(E) Earnings sharing mechanisms, under which earnings of
utilities falling outside an authorized range as compared to
the return on equity are shared between shareholders and
ratepayers.
(F) Total expenditure models, under which capital and
operating expenditures of utilities are treated on an
equivalent basis to reduce bias toward capital investment.
(G) Performance scorecards, under which utilities are
evaluated against transparent outcome-based metrics such as
reliability, affordability, equity, or the reduction of
emissions, with results informing regulatory decisions or
incentive adjustments.
(3) Sources.—The Secretary shall ensure that each study
under paragraph (1) is informed by—
(A) reports filed with the Commission pursuant to
subsections (c) and (e) and section 304 of the Federal Power
Act (16 U.S.C. 825c);
(B) relevant reports issued by the National Laboratories;
and
(C) such other studies, reports, and other data sources as
the Secretary may determine appropriate.