Congress.wikiCongress.wiki
Congress
MapWatchScheduleDaily RecordMembersCommitteesLegislationNominations
Money & Oversight
MoneyOffice SpendingSubpoenasHouse EthicsForeign InfluenceSpecial Rules
Executive & Law
AgenciesRegulationsUS Code

Without donations, we may shut down.Congress.wiki needs your support. Without donations, we may have to shut down the site.

Learn whyDonate
Search⌘K
Congress
MapWatchScheduleDaily RecordMembersCommitteesLegislationNominations
Money & Oversight
MoneyOffice SpendingSubpoenasHouse EthicsForeign InfluenceSpecial Rules
Executive & Law
AgenciesRegulationsUS Code

I can walk you through what this section actually means

U.S. Code/Title 30/§ 1251a

Title 30

30

Title overviewSearch titleAll titles
30 U.S.C. § 1251a.Chapter 25

§ 1251a

Abandoned coal refuse sites

Title 30
3 min read
Subchapter: CONTROL OF THE ENVIRONMENTAL IMPACTS OF SURFACE COAL MINING

Need the full chapter outline? Open Chapter 25 to browse every section without loading the entire chapter explorer on this page.

Back to Chapter 25Previous: § 1251Next: § 1252

((1)) Notwithstanding any other provision of the Surface Mining Control and Reclamation Act of 1977 [ et seq.] to the contrary, the Secretary of the Interior shall, within one year after , publish proposed regulations in the Federal Register, and after opportunity for public comment publish final regulations, establishing environmental protection performance and reclamation standards, and separate permit systems applicable to operations for the on-site reprocessing of abandoned coal refuse and operations for the removal of abandoned coal refuse on lands that would otherwise be eligible for expenditure under section 404 and section 402(g)(4) of the Surface Mining Control and Reclamation Act of 1977 [, 1232(g)(4)].

((2)) The standards and permit systems referred to in paragraph (1) shall distinguish between those operations which reprocess abandoned coal refuse on-site, and those operations which completely remove abandoned coal refuse from a site for the direct use of such coal refuse, or for the reprocessing of such coal refuse, at another location. Such standards and permit systems shall be premised on the distinct differences between operations for the on-site reprocessing, and operations for the removal, of abandoned coal refuse and other types of surface coal mining operations.

((3)) The Secretary of the Interior may devise a different standard than any of those set forth in section 515 and section 516 of the Surface Mining Control and Reclamation Act of 1977 [, 1266], and devise a separate permit system, if he determines, on a standard-by-standard basis, that a different standard may facilitate the on-site reprocessing, or the removal, of abandoned coal refuse in a manner that would provide the same level of environmental protection as under section 515 and section 516.

((4)) Not later than 30 days prior to the publication of the proposed regulations referred to in this section, the Secretary shall submit a report to the Committee on Interior and Insular Affairs of the United States House of Representatives, and the Committee on Energy and Natural Resources of the United States Senate containing a detailed description of any environmental protection performance and reclamation standards, and separate permit systems, devised pursuant to this section.

§ 1251

Release: pl-119-83 (2026-04-13)

§ 1252

Get a weekly summary of what Congress did, delivered every Sunday.

  • About
  • How Congress Works
  • Quiz
  • Congress Wrapped
  • Pricing
  • Roadmap
  • Health
  • Privacy Policy
  • Terms of Service
WhiteHouse.wiki•SCOTUS.wiki
Congress.wiki Alpha
Support Us

This is not an official government website.

© 2026 PLEJ LC. All rights reserved.