((a)) ** In general** The Secretary shall, to the maximum extent practicable, include in the future workplan of the Corps any authorized project or facility of the Corps of Engineers—
((1)) that the Secretary has studied for disposition under an existing authority, including by carrying out a disposition study under ; and
((2)) for which a final report by the Director of Civil Works has been completed.
((b)) ** Notification to committees** Upon completion of a final report referred to in subsection (a), the Secretary shall transmit a copy of the report to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate.