((a)) ** In general** In carrying out a disposition study for a project of the Corps of Engineers, or a separable element of such a project, including a disposition study under , the Secretary shall consider modifications that would improve the overall quality of the environment in the public interest, including removal of the project or separable element of a project.section 549a of this title
((b)) ** Disposition study transparency** The Secretary shall carry out disposition studies described in subsection (a) in a transparent manner, including by—
((1)) providing opportunities for public input; and
((2)) publishing the final disposition studies.
((c)) ** Removal of infrastructure** For disposition studies described in subsection (a) in which the Secretary determines that a Federal interest no longer exists, and makes a recommendation of removal of the project or separable element of a project, the Secretary is authorized, using existing authorities, to pursue removal of the project or separable element of a project in partnership with other Federal agencies and non-Federal entities with appropriate capabilities to undertake infrastructure removal.