WATER RESOURCES DEVELOPMENT
Title 33 - Navigation and Navigable Waters
“Secretary” defined
Non-Federal engagement and review
Review of contracting policies
Harbors
Preserving United States harbors
Inland waterway transportation
Flood control and other purposes
Treatment of certain benefits and costs
General credit for flood control
Feasibility studies; planning, engineering, and design
Rate of interest
Limitation on applicability of certain provisions in reports
General applicability of cost sharing
Definitions
Rivers and harbors and other waterways projects for benefit of navigation, flood control, hurricane protection, beach erosion control, and other purposes
Cost limitations on projects
Use of other Federal funds
Transfer of excess credit
Crediting authority for federally authorized navigation projects
Credit or reimbursement
Water resources projects on Federal land
Clarification of impacts to other Federal facilities
Study of water resources development projects by non-Federal interests
Construction of water resources development projects by non-Federal interests
Coordination and scheduling of Federal, State, and local actions
Nonapplicability to Saint Lawrence Seaway
Construction in usable increments
Port or harbor dues
Information for national security
Authorization of appropriations
Estimate of harbor maintenance needs
Funding for harbor maintenance programs
Budgetary treatment expansion and adjustment for the Harbor Maintenance Trust Fund
Additional measures at donor ports and energy transfer ports
Maintenance of harbors of refuge
Additional projects for underserved community harbors
Emergency response services
Remote and subsistence harbors
Arctic deep draft port development partnerships
Inland Waterways Users Board
Project delivery process reforms
Annual financial review
Assessment of operation and maintenance needs of the Atlantic Intracoastal Waterway and the Gulf Intracoastal Waterway
Inland waterways riverbank stabilization
High water-low water preparedness
Territories development study
Survey of potential for use of certain facilities as hydroelectric facilities
Study of Corps capability to conserve fish and wildlife
Aquatic invasive species research
Columbia River/Arkansas River Basin transfers
Canadian tidal power study
New York Bight study
Watershed and river basin assessments
Post-disaster watershed assessments
Marine technology review
Tribal partnership program
Subsurface drain systems research and development
Maximum cost of projects
Matters to be addressed in planning
Tribal Liaison
Corps of Engineers support for underserved communities; outreach
Continuing authority programs
Declaration of policy
Feasibility reports
Planning
Submission of reports to Congress
Vertical integration and acceleration of studies
Annual report to Congress
Report to Congress on authorized studies and projects
Post-authorization change reports
Review of resiliency assessments
Scope of feasibility studies
Economic, hydraulic, and hydrologic modeling
Fish and wildlife mitigation
Status report
Clarification of mitigation authority
Technical assistance
Benefits and costs attributable to environmental measures
Benefits to navigation
Scenic and aesthetic considerations
Environmental Protection and Mitigation Fund
Acceptance of certain funds for mitigation
Continued planning and investigations
Urban and rural flood control frequency
Consideration of measures
Stormwater management projects
Flood control in Trust Territory of the Pacific Islands
Federal Project Repayment District
Surveying and mapping
National coastal mapping program
Reprogramming during national emergencies
Reprogramming of funds for projects by Corps of Engineers
Office of Environmental Policy
Compilation of laws; annual reports
Policy and technical standards
Acquisition of recreation lands
Operation and maintenance on recreation lands
Impact of proposed projects on existing recreation facilities
Databases of Corps recreational sites
Acquisition of beach fill
Study of Corps capabilities
Historical properties
Separability
Use of FMHA funds
Reports
Control of ice
Campgrounds for senior citizens
Great Lakes Commodities Marketing Board
Project modifications for improvement of environment or drought resiliency
Cost sharing for Territories and Indian tribes
Report to Congress covering proposals for water impoundment facilities
Comments on certain changes in operations of reservoirs
Research and development
Engineering and environmental innovations of national significance
Support of Army civil works program
Innovative technology
Technical assistance program
Advanced modeling technologies
Periodic statements
Transparency in accounting and administrative expenses
Transparency and accountability in cost sharing for water resources development projects
Environmental protection mission
Wetlands
Cooperative agreements
Mitigation banks and in-lieu fee arrangements
Flood plain management
Reservoir management
Protection of recreational and commercial uses
Operation and maintenance of navigation and hydroelectric facilities
Hydroelectric power project uprating
Expediting hydropower at Corps of Engineers facilities
Single entities
Technical assistance to private entities
Interagency and international support authority
Reduced pricing for certain water supply storage
Voluntary contributions for environmental and recreation projects
Authority to accept and use materials and services
Materials, services, and funds for repair, restoration, or rehabilitation of projects
Regional sediment management
Dredged material disposal facility partnerships
Sediment management
Reservoir sediment
Alternative projects to maintenance dredging
Non-Federal interest dredging authority
Maintenance dredging data
Beneficial use of dredged material; dredged material management plans
Five-year regional dredged material management plans
Beneficial use of dredged material
Transfer of suitable dredged material
Definition of rehabilitation for inland waterway projects
Rehabilitation of Corps of Engineers constructed pump stations
Challenge cost-sharing program for management of recreation facilities
Special use permits
International outreach program
Aquatic ecosystem restoration
Monitoring ecosystem restoration
Fish hatcheries
Public recreational amenities in ecosystem restoration projects
Use of continuing contracts for construction of certain projects
Initiating work on separable elements
Shoreline and riverine protection and restoration
Irrigation diversion protection and fisheries enhancement assistance
Innovative technologies for watershed restoration
Coastal aquatic habitat management
Abandoned and inactive noncoal mine restoration
Property protection program
Reburial and conveyance authority
Assistance programs
Cooperative agreements with Indian tribes
Revision of project partnership agreement; cost sharing
Expedited actions for emergency flood damage reduction
Prioritization
Prioritization of certain projects
Criteria for funding environmental infrastructure projects
Access to water resource data
Independent peer review
Safety assurance review
Electronic submission and tracking of permit applications
Project administration
Real estate administrative fees
Determination of project completion
Purpose and need
Small water storage projects
Project acceleration
NEPA reporting
Categorical exclusions in emergencies
Corrosion prevention
Durability, sustainability, and resilience
Operation and maintenance of existing infrastructure
Federal breakwaters and jetties
Funding to process permits
Structural health monitoring
Aging infrastructure
Easements for electric, telephone, or broadband service facilities
Prior project authorization
Project consultation
Managed aquifer recharge study and working group